Professional Documents
Culture Documents
BOQ Pekerjaan Andesit - BIH - R2 Mei Clear
BOQ Pekerjaan Andesit - BIH - R2 Mei Clear
00
1 TENAGA 125,000.00 semen 70,000.00
2 TUKANG BATU 135,000.00 pasir 300,000.00
1 TUKANG KAYU 150,000.00 mu408 15,000.00
2 TUKANG BESI 150,000.00 alat bantu 7,000.00
3 TUKANG BATU ALAM 175,000.00
4 MANDOR 150,000.00
5 KEPALA TUKANG 175,000.00
coating 19,000.00
K O P
P E R U S A H A A N
LAMPIRAN 1
BILL OF QUANTITY
PEKERJAAN ANDESIT
No Volume Satuan Deskripsi Spesifikasi & Standar Harga Satuan Jumlah Harga
a b c d e f g
include material & alat bantu perekat
1 863.942 m2 Palimanan Stone 40x40 cm t = 2 cm fin Honned; Cream 542,931.00 469,060,894.00
include material & alat bantu perekat
2 1,299.138 m2 Flagstone random cut; Batu kali t=3-5 mm; Grey 371,763.00 482,971,440.29
include material & alat bantu perekat
3 32.032 m2 Pebbles Wash t=0,5-1 cm Texture salt finish; incl. list pemisah modul; Cream 464,283.00 14,871,913.06
include material & alat bantu perekat
4 96.096 m2 Pebbles Wash t=0,5-1 cm Texture salt finish; incl. list pemisah modul; Grey 464,283.00 44,615,739.17
include material & alat bantu perekat
5 547.411 m2 Andesit Impala Honed 20x20 cm t = 2 cm 521,139.00 285,277,221.13
include material & alat bantu perekat
6 547.411 m2 Andesit Impala Flame 10x20 cm t = 2 cm 483,963.00 264,926,669.79
include material & alat bantu perekat
7 239.492 m2 Andesit Impala Flame 10x10 cm t = 2 cm 483,963.00 115,905,266.80
include material & alat bantu perekat
8 201.570 m2 Andesit stone, 10x10x3 cm Andesit Light Grey (Flame) 494,139.00 99,603,598.23
include material & alat bantu perekat
9 403.140 m2 Andesit stone, 10x10x3 cm andesit honed black; Dark Grey 513,855.00 207,155,504.70
include material & alat bantu perekat
10 470.330 m2 Andesit stone, 10x10x3 cm andesit black flame; Grey 513,855.00 241,681,422.15
include material & alat bantu perekat
11 1,375.000 pcs Tectile 30x30x3 cm Strip 40,647.46 55,890,254.24
include material & alat bantu perekat
12 80.000 pcs Tectile 30x30x3 cm Dot 40,647.46 3,251,796.61
include material & alat bantu perekat
13 85.290 m2 Gravel Split Stone 30 mm Thickness Natural Finish 572,838.00 48,857,353.02
TOTAL 2,334,069,073.19
PPN 11% 256,747,598.05
Nilai Perjanjian yang Disetujui 2,590,816,671.24
Pembulatan 2,590,816,000.00
Terbilang : Dua Milyar Lima Ratus Sembilan Puluh Juta Delapan Ratus Enam Belas Ribu Rupiah.
Dibuat oleh,
PT. CAHAYA SEMESTA ELECTRIC INDONESIA
RONY SETIAWAN
Direktur
1 Palimanan Stone 40x40 cm t = 2 cm fin Honned; Cream
Pekerja 0.3000 oh 150,000 45,000
Tukang Batu Alam 0.3000 oh 175,000 52,500
Kepala tukang 0.0300 oh 200,000 6,000
Mandor 0.0150 oh 200,000 3,000
coating 1.0000 m2 9,000 9,000
115,500
Semen 0.2938 sak 70,000 20,563
Pasir 0.0350 m3 300,000 10,500
Batu Andesit 40x40x2 1.0600 m2 259,000 274,540
MU 408 0.3560 kg 15,000 5,340
Alat Bantu 1.0000 Ls 7,000 7,000
coating 1.0000 m2 19,000 19,000
336,943
Total 452,443
20% 90,489 542,931
2 Pemasangan Flagstone random cut; Batu kali t=3-5 mm; Grey
pekerja 0.4000 oh 150,000 60,000
Tukang Batu 0.3500 oh 175,000 61,250
Kepala Tukang 0.0350 oh 200,000 7,000
Mandor 0.0350 oh 200,000 7,000
coating 1.0000 m2 9,000 9,000
115,400
Flagstoon 1.2000 m2
Semen 11.7500 kg
Pasir 0.0350 m3
Alat Bantu 1.0000 ls
MU 408 0.3560 kg
coating 1.0000 m2
3 Pebbles Wash t=0,5-1 cm Texture salt finish; incl. list pemisah modul; Cream/M2
Pebbles Wash t=0,5-1 cm 40.0000 kg
Semen 0.2938 sak
Pasir Pasang 0.0300 m3
MU 408 0.3560 kg
Pekerja 0.2400 oh
Tukang 0.2400 oh
Kepala Tukang 0.1000 oh
Mandor 0.0100 oh
Semen 0.2938 kg
Pasir 0.0350 m3
Andesit Impala Honed 20x20 cm t = 2 cm 1.0600 m2
Coating 1.0000 m2
Alat Bantu 1.0000 ls
Semen 0.2938 kg
Pasir 0.0350 m3
Andesit Impala Flame 10x20 cm t = 2 cm 1.0600 m2
Coating 1.0000 m2
Alat Bantu 1.0000 ls
Semen 0.2938 kg
Pasir 0.0350 m3
Andesit Impala Flame 10x10 cm t = 2 cm 1.0600 m2
Coating 1.0000 m2
Alat Bantu 1.0000 ls
Semen 0.2938 kg
Pasir 0.0350 m3
Andesit stone, 10x10x3 cm Andesit Light Grey (Flame) 1.0600 m2
Coating 1.0000 m2
Alat Bantu 1.0000 ls
Semen 0.2938 kg
Pasir 0.0350 m3
Andesit stone, 10x10x3 cm andesit honed black; Dark Grey 1.0600 m2
Coating 1.0000 m2
Alat Bantu 1.0000 ls
Bahan
Tekstile 30x30x3 strip 11.8000 bh
Semen Portland 10.0000 kg
Pasir Pasang 0.0450 m3
Semen Warna 1.5000 kg
Pekerja 0.2400 oh
Tukang 0.2400 oh
Kepala Tukang 0.1000 oh
Mandor 0.0100 oh
150,000 45,000
175,000 52,500
200,000 6,000
200,000 3,000 PEKERJA
9,000 9,000 TUKANG BATU
115,500 TUKANG KAYU
59,000 17,331 TUKANG BESI
200,000 7,000 TUKANG BATU ALAM
185,000 196,100 KEPALA TUKANG
9,800 3,489 MANDOR
7,000 7,000 TUKANG COATING
11,000 11,000
241,920
Total 357,420
0% - 357,420 SEMEN / PC
PASIR PASANG
150,000 60,000 MU 408
175,000 61,250 COATING
200,000 7,000 Palimanan Stone 40x40 cm t = 2 cm fi
200,000 7,000 Pemasangan Flagstone random cut; B
9,000 9,000
115,400 Pebbles Wash t=0,5-1 cm Texture salt
Andesit Impala Honed 20x20 cm t = 2
110,000 132,000 Andesit Impala Flame 10x20 cm t = 2
1,750 20,563 Andesit Impala Flame 10x10 cm t = 2
200,000 7,000 Andesit stone, 10x10x3 cm Andesit Li
7,000 7,000 Andesit stone, 10x10x3 cm andesit ho
9,800 3,489 Andesit stone, 10x10x3 cm andesit bl
11,000 11,000 Tectile 30x30x3 cm Strip
- 181,051 Gravel Split Stone 30 mm Thickness N
Total 296,451
0% - 296,451
150,000 60,000
175,000 61,250
200,000 7,000
200,000 7,000
9,000 9,000
115,400
59,000 17,331
200,000 7,000
190,000 201,400
19,000 19,000
7,000 7,000
251,731
Total 367,131
0% - 367,131
150,000 51,750
175,000 61,250
200,000 7,000
200,000 7,000
9,000 9,000
108,800
59,000 17,331
200,000 7,000
140,000 148,400
19,000 19,000
7,000 7,000
198,731
Total 307,531
0% - 307,531
150,000 60,000
175,000 61,250
200,000 7,000
200,000 7,000
9,000 9,000
115,400
59,000 17,331
200,000 7,000
140,000 148,400
19,000 19,000
7,000 7,000
198,731
Total 314,131
0% - 314,131
150,000 51,750
175,000 61,250
200,000 7,000
200,000 7,000
9,000 9,000
108,800
59,000 17,331
200,000 7,000
145,000 153,700
19,000 19,000
7,000 7,000
204,031
Total 312,831
0% - 312,831
150,000 51,750
175,000 61,250
200,000 7,000
200,000 7,000
9,000 9,000
108,800
59,000 17,331
200,000 7,000
165,000 174,900
19,000 19,000
7,000 7,000
225,231
Total 334,031
0% - 334,031
150,000 51,750
175,000 61,250
200,000 7,000
200,000 7,000
9,000 9,000
108,800
59,000 17,331
200,000 7,000
165,000 174,900
19,000 19,000
7,000 7,000
225,231
Total 334,031
0% - 334,031
150,000 105,000
175,000 61,250
200,000 7,000
200,000 7,000
144,200
10,000 118,000
5,000 50,000
200,000 9,000
10,000 15,000
192,000
Total 336,200
per pcs 28,492
0% - 336,200
0% - 28,492
18,000 180,000
59,000 20,650
200,000 71,200
9,800 2,879
219,783
150,000 36,000
175,000 42,000
200,000 20,000
200,000 2,000
100,000
Total 319,783
0% - 319,783
HOK
Rp 150,000
BATU Rp 165,000
KAYU Rp 165,000
BESI Rp 165,000
BATU ALAM Rp 175,000
UKANG Rp 200,000
Rp 200,000
COATING Rp 9,000
PC Rp 59,000
SANG Rp 200,000
Rp 9,800
Rp 11,000
n Stone 40x40 cm t = 2 cm fin Honned; Cream Rp 185,000
an Flagstone random cut; Batu kali t=3-5 mm; Grey Rp 110,000
Wash t=0,5-1 cm Texture salt finish; incl. list pemisah modul; Cream/M2 Rp 4,500
mpala Honed 20x20 cm t = 2 cm Rp 190,000
mpala Flame 10x20 cm t = 2 cm Rp 140,000
mpala Flame 10x10 cm t = 2 cm Rp 140,000
one, 10x10x3 cm Andesit Light Grey (Flame) Rp 145,000
one, 10x10x3 cm andesit honed black; Dark Grey Rp 165,000
one, 10x10x3 cm andesit black flame; Grey Rp 165,000
x30x3 cm Strip Rp 10,000
it Stone 30 mm Thickness Natural Finish Rp 18,000
150,000
165,000
165,000
165,000
175,000
200,000
200,000
9,000
4,500 KG
190,000 M3
140,000 M3
140,000 M3
145,000 M3
165,000 M3'
165,000 M3
10,000 PCS
18,000 KG
K O P
P E R U S A H A A N
LAMPIRAN 1
BILL OF QUANTITY
PEKERJAAN ANDESIT
No Volume Satuan
a b c
1 863.942 m2
2 1,299.138 m2
3 32.032 m2
4 96.096 m2
5 547.411 m2
6 547.411 m2
7 239.492 m2
8 201.570 m2
9 403.140 m2
10 470.330 m2
11 1,375.000 pcs
12 80.000 pcs
13 85.290 m2
Terbilang :
#REF!
#REF!
#REF!
K O P
P E R U S A H A A N
LAMPIRAN 1
BILL OF QUANTITY
PEKERJAAN ANDESIT
Deskripsi
d
Pebbles Wash t=0,5-1 cm Texture salt finish; incl. list pemisah modul; Cream
Pebbles Wash t=0,5-1 cm Texture salt finish; incl. list pemisah modul; Grey
Nilai Perjan
Dua Milyar Lima Ratus Sembilan Puluh Juta Delapan Ratus Enam Belas Ribu Rupiah.
1
TITY
DESIT
TOTAL 1,601,336,308.86
PPN 11% 176,146,993.97
Nilai Perjanjian yang Disetujui 1,777,483,302.83
Pembulatan 1,777,483,000.00
as Ribu Rupiah.
Dibuat oleh,
PT. CAHAYA SEMESTA ELECTRIC INDONESIA
RONY SETIAWAN
Direktur
PV02
PV03
PV06
PV06
PV07
PV07
PV07
PV08
PV08
PV08
1,777,483,302.83