You are on page 1of 2

Villa Terrace Work

RIYADH, KSA

BILL OF QUANTITIES

June 2021
Villa Terrace Work - RIYADAH

BILL OF QUANTITIES
CIVIL WORKS

AMOUNT
ITEM DESCRIPTION QUANTITY UNIT RATE
SAR

1 Flooring

1.1 Elevated Floor (10cm height) -Metal framing 17.00 sqm 184.00 3,128.00

1.2 Supply and Installation of Flooring with PVC Parquet (including all related
works for flooring)- 17.00 sqm 374.00 6,358.00
(Material- Korean made)

1.3 loose gravel 22.00 sqm 114.00 2,508.00

1.4 White porcelain 12.00 sqm 214.00 2,568.00

1.5 Grey Stone flooring 18.00 sqm 350.00 6,300.00

2 Ceiling

2.1 Framing Works 10*20cm frame on 4 sides including vertical supports 43.00 sqm 548.00 23,564.00
(Work includes tube welded joining, and painting)

2.2 Covering with Lexin sheet 43.00 sqm 184.00 7,912.00

3 Walls

3.1 Fixed Aluminium Double glass windows 40.80 m2 464.00 18,931.20

3.2 Stone cladding 50.40 sqm 244.00 12,297.60

3.3 Wood cladding 34.00 sqm 850.00 28,900.00


(including vertical columns in PVC and green fake grass)

3.4 Supply and installation of artificial Grass 19.00 sqm 104.00 1,976.00

3.5 Decoration works with fake grass around window 1.00 LS 980.00 980.00
(60cm frame of fake grass around windows

4 Electrical

4.1 Supply and Installation of pole lights on frontage 4.00 nr 462.00 1,848.00
( Work including conducting, cabling and lights)

4.2 Supply and Installation of Wall light 140.00 ml 94.00 13,160.00


( Work including conducting, cabling and lights)

5.0 Planter box


5.1 Supply and Installation of Planter box 2.00 nr 1,640.00 3,280.00

Total - SAR
133,710.80
Carried to General Summary

You might also like