GENERAL REQUIREMENTS
1.0 Mobilization / Demobilization (including general cleaning) 1.00 lot 28,400.00
2.0 Tempopary facilties / utilities / Safety facilities 1.00 lot 20,000.00
4.0 ELECTRICAL
4.1 Electrical Rough in (use including wires, etc…) 1.00 lot ---included ---included ---included ---included 12,000.00
4.2 Koten 60 amps Single phase bolt-on circuit breaker with box 1.00 lot 590.00 590.00 250.00 250.00 840.00
4.3 9 watts directional LED Recessed down light cool white (4000K-3000K) 4.00 set 1,500.00 6,000.00 450.00 1,800.00 7,800.00
4.4 7 watts directional LED Recessed down light cool white (4000K-3000K) 6.00 set 1,200.00 7,200.00 360.00 2,160.00 9,360.00
4.5 4' T5 LED Flourescent 14 watts (Cool White) 6.00 set 750.00 4,500.00 250.00 1,500.00 6,000.00
4.6 HCG lighted Mirror 2.00 set C.O. HCG
NOTE:
1. THIS CONSTRUCTION COST ESTIMATE IS IN ACCORDANCE TO THE CURRENT SPECIFICATIONS OF THE PROPOSED PLAN AND IS NOT YET FINAL.
2. ITEMS NOT INCLUDED HEREIN SHALL BE CONSIDERED AS AN ADDITONAL WORK THUS ITEMS NOT MADE SHALL BE CONSIDERED AS DEDUCTIVE WORKS.
3. INPUT ONLY PER UNIT COST OF MATERIALS AND LABOR. DO NOT ALTER THE DEFAULT FORMULA.
DURATION:
Twenty (20) to Thirty (35) Calendar Days
EXCLUSIONS:
1. Other Facilities and such which are not stated on this Bid Beakdown.
TERMS OF PAYMENT:
50% - Down Payment
50% - Upon Completion
Prepared by :
Approved by : Conforme: