PROJECT: Water Well MW026 Well Location:Imtiaz Post
CLIENT: RDMC Conducted By:Engr ChunZaib Date started: 25/1/24 Supervised By:Engr Chun Zaib Date end: 27/1/24 Compressor (airline) Depth S.NO Date Operation Time (min) Rod depth (M) Remarks (M) 1 25/1/2024 180min Direct Airline 76.21M Muddy Water 2 25/1/2024 240min Direct airline 124.61M Muddy then Clear 3 27/1/2024 60min Direct airline 110M Recovery test Clear Water 5 6 7 8 This Compressor activity was performed to wash new developed bore well we gave stoppage intervals after 30min running and 10min stoppage to check the mud clearance