You are on page 1of 1

COMPRESSOR WASHING

PROJECT: Water Well MW026 Well Location:Imtiaz Post


CLIENT: RDMC
Conducted By:Engr ChunZaib Date started: 25/1/24
Supervised By:Engr Chun Zaib Date end: 27/1/24
Compressor (airline) Depth
S.NO Date Operation Time (min) Rod depth (M) Remarks
(M)
1 25/1/2024 180min Direct Airline 76.21M Muddy Water
2 25/1/2024 240min Direct airline 124.61M Muddy then Clear
3 27/1/2024 60min Direct airline 110M Recovery test Clear Water
5
6
7
8
This Compressor activity was performed to wash new developed bore well we gave stoppage intervals after 30min running and 10min stoppage to check the mud clearance