Job Safety Analysis

PROJECT / TASK: Operation Of Batching Plant CONTRACTOR: JOB No.:

SUPERVISOR: LOCATION: DATE:

JOB STEP HAZARDS Control Measure ACTION


Break the job into steps. List the hazard or type of harm List the necessary control measures to be followed to A person who will
Listing work which may be hazardous. identified with each step eliminate the identified hazards ensure this happens

Electrocution Entry to be restricted inside the batching plant operator


room other than the operator and the electrician
Only authorised operator to be operated the same.
Proper earthing to be given and all the connections are
to be provided through ELCB only.
An electrician has to use rubber hand gloves(Tested
and Trademark ) while doing local test and all.
Identification boards to be displayed.

All the machinery to be checked and certified by putting


Moving Parts/Trip Hazard a green sticker
All the moving parts to be guarded and no loose clothing
allowed near the machinery/conveyors.
Unauthorised entry to be restricted.

Fire Hazard CO2 fire extinguisher to be provided.


Batching Plant Operation
Nose mask to be provided to those who are engaged in
(Commissioning) Dust Hazard cement loading work.

Safety goggles to be provided other than PPE’S for all


Eye Hazard those who are engaged in the work.

Documents of the mobile plants/vehicle to be checked


Mobile Plants/Hit Hazard and cleared ‘OK’ before entering the site.
A valid licence for the operator.
Cement Loading Proper access to be provided by clearing all unwanted
materials or traffic to enter the workplace.
Movement area of the machine to be isolated.
Daily check for the equipment and the checklist to be
fulfilled daily.
Shifting of material using Loader Continuous supervision to be provided.

Vehicle to be inspected and valid document to be


checked.
A valid licence for the vehicle driver.
Mobile plant/Hit Hazard Daily check for the vehicle and checklist to be fulfilled.
Placing of transit mixer Access to be cleared from all unwanted materials and
traffic for vehicle movement.