MEETING MINUTE
Issue Date 30-Oct-18 Issued Division DAV - SQC
Started work: DAV Supplier
Meeting date:
14:00 A.M Mr. Kasetani _ QC-GM Mr. Miyamoto _ GD
Ms. Phuong _ Interpreter japanese Mr. Sato
Mr. Tam _ QC- Eng Mr. Dinh _ QC
25-Oct-18 Attender Name
Finished work: Mr. Hoan _ QC
16:00 P.M Ms. Thuy _ Interpreter japanese
Email sent to
Meeting place DAV Meeting Room 107
Purpose VAPS explain to DAV about tow CAR no. QR-SQC-18-0019 & 0020 and discuss other information.
I. Meeting discussion.
1.1. VAPS explain root cause and corrective action to DAV about two CAR no. QR-SQC-18-0019 & 0020 .
1.2. DAV explain to VAPS about part Gas Stop Valve different colors ( Analysis report from DIL )
1.3. Discuss other information ( Four Way Valve )
2.2. DAV explain to VAPS about part Gas Stop Valve different colors ( Analysis report from DIL )
( Detail see attached file )
1 VAPS need more clear analysis and submit final report to DAV again. - VAPS
2 Next meeting will be held on 23nd/Oct/2018 ( from 14:00 at DAV factory ) 23-Oct VAPS
Page : 01 / 01
MEETING MINUTE
Issue Date 18-Oct-18 Issued Division DAV - SQC
Started work: DAV Supplier
Meeting date:
14:10 A.M Mr. Kasetani _ QC-GM Mr. Miyamoto _ GD
Ms. Phuong _ Interpreter japanese Mr. Mongkol _ TAPS GM
Mr. Tuan _ QC-Sup Mr. Dinh _ QC
15-Oct-18 Attender Name
Finished work: Mr. Tam _ QC- Eng Mr. Hoan _ QC
17:05 P.M Ms. Thuy _ Interpreter japanese
Ms. Trinh _ Interpreter thailand
Email sent to Mr. Kasetani ; Ms. Phuong; Mr. Tuan; Mr. Tam; Mr. Takeda ; Mr. Miyamoto ; Mr. Mongkol ; Mr. Dinh ; Mr. Hoan ; Ms. Thuy ; Ms. Trinh.
Meeting place DAV Meeting Room 107
Purpose VAPS explain to DAV about model refnet Joint BHFP22P151-8 NG and improvement plan.
I. Meeting discussion.
1.1. Overview of problem.
1.2. Cause (Report content)
1.3. Cause of occurrence.
1.4. next action for improvements ( suggested from DAV )
2.2. Discussion on background of problem about Four way valve inside plastic melting happened at DAV PD.
→ Daikin have some comment as below :
- Make design review standard to risk occur and outgoing product ( FMDA ).
- VAPS make NG sample for operator judgement. ( Verified the countermeasure , quality points …) effective or not.
- DAV make JIG for function check Four Way Valve ( 2 sets ) . After JIG completion, send to VAPS for 100% inspection
operation function of Four Way Valve before delivery to DAV
( VAPS reports to Daikin on improvement action plan (method, schedule and cost)
2.3. Discussion about gas stop valve different colors of Four Way Valve part.
- VAPS analysis root-cause and submit report to DAV.
- DAV dis-assemble gas stop valve different colors of Four Way Valve part and send to Daikin Japan for support analysis.(Already send 4/Oct)
3.1 VAPS submit final report to DAV ( CAR No. QR-SQC-18-0019 & - QR-SQC-18-0020 ).
3.2 VAPS verified the countermeasure, quality points …already applied for Four Way Valve NG problem.
3.3 DAV make JIG for function check Four Way Valve and then send to VAPS. VAPS report DAV on improvement action plan
(method, schedule and cost).
3.4 VAPS analysis root-cause about gas stop valve different colors and submit report to DAV.
Item Contents
1 VAPS need more clear analysis and submit final report to DAV again.
- VAPS
23-Oct VAPS
No. Issue Q'ty NG ( pcs )
DAV Production NG
1 32
( Running Test + Air Tight Test
2 NG JIG 19
OK check by JIG
5 10
( From 44 pcs VAPS already sorting NG by visual )
Total 75
Remark
75