Bacani, B. 13 3. Conduct orientation to security guards Sevilla February 28, Done 03/20/2023
AC
Del Castillo 2023
Quisido, A. 14 Raised concern with the branch libraries that have no For approval of COO
IMS Personnel. Detoya.
Tibungco – Video & Photo documentation c/o
OSA; PM of computers c/o ICT
Guianga – No IMS Personnel; LCD weekly report
c/o Ms. Dulatre; PM of computers c/o ICT Main;
PM LCD c/o IMS Main
Digos- Video & Photo documentation c/o OSA;
To request an IMS personnel
Tagum – Video & Photo documentation c/o
OSA; To request an IMS personnel; prepare
communication for the approval of their Quisido, A March 17, 2023 A1
designation
Panabo – no IMS Personnel; LCD c/o PPMGS;
Request for replacement of Mr. Regie
Canesares former IMS personnel
Penaplata – no IMS Personnel
Bansalan - PM of computer units c/o Mr.
Palmero ; had an additional Technical staff;
submit LCD weekly report c/o Sir Genon
Action/Recommendation:
To request a designated IMS staff for all Branches
except for UM Guianga and Tibungco.
Matavia, M. 15 Raised the ff. issues: Matavia, M. April 15, 2023
1. Possible change of the time of borrowing from 7:30 LIC Head
am to 7:00 AM to cater students/faculty with 7AM
classes and 8:30 PM to 9:30PM to cater
students/faculty with classes at 8:30-9:30PM.
2. To move the end of borrowing after the final
examination in each term, to address the concerns of A
students who wanted to borrow books during the
final exam week.
This move is to satisfy the information needs of
students.
Response: To review OPM 16.05 after the ISO visit
and file RFD for revision
Refugio, S. 16 The 1-hr policy on the use of the e-resources section March 10, 2023 Done
is not religiously followed because some students
exceeded the one-hour usage due to NO monitoring
system that is implemented.
Action/Recommendation:
1. Strictly implement the logging-in or the filling out All Branch Libraries
of the Internet/On-line Resources Utilization form for
the branches where the E-resources Management A/C
System is not yet installed.
2. For the Main Campus, control of the 1-hour policy
is via the E-resources Management System, hence the
utilization form is no longer used/applicable.
3. To file RFD re: Change the name of the form to Digal R.A.
coincide with OPM 16.08 (E-resources Utilization
Form to Internet/On-line Resources Utilization Form.
Anino, M. 17 Suggested the following: Anino, Michael June 2023 Fill out System
1. Discussion Room Reservation System LIC Head Development Form
2. To convert the DR logbook to Online Attendance before June and
form A include n the AOP
Response:
To include this improvement in the next AOP
Document Title : MINUTES OF THE MEETING
New Business
Bacani, B. 18 ISO Visit - - Noted by the body.
Informed the final schedule of the ISO visit:
LIC Matina – March 29, 2023
LIC Bolton – March 31, 2023
I
LIC Digos – March 30, 2023
LIC Panabo – March 29, 2023
LIC Mabini, UM Tagum – March 29, 2023
LIC Visayan, UM Tagum – March 28, 2023
Bacani, B. 19 Reminders in preparation for the upcoming ISO visit: - - Noted by the body.
All references must be controlled and signed.
List of Forms, History Card & Stock Card are
updated.
Ensure all files/records are labeled, updated
and consistent with the revised RRG.
Scratch papers are crossed out and do not use
the confidential documents.
Corrections should be done through single
strike and sign.
All forms should be completely filled-out and
signed. Put dash if data is not applicable.
I
Ensure that all reports are signed.
Ensure that all posted information are updated
and signed.
Know where to locate your procedures in the
manual (OPM).
Unreturned defective equipment is properly
labeled (for disposal to Property Office or for
repair).
5S is implemented within your area(s) of
responsibility.
Emergency Exits & Fire Extinguishers must be
checked.
Issues and Concerns
Refugio, S. 20 LIC Panabo - -
Summary of References & Compliance Reports
to be submitted to CHED were accomplished
Check-out utilization – 13 Faculty; 6 Students
In-house Utilization – 82 I
Online Databases – 9164
Library Attendance – 6 Faculty; 171 Students
Already outgo the letter addressed to Deans RE
Check-out Utilization report last March 2023
Donayre, C. 21 LIC Tagum - -
Evidences for YEAR, MYAR & OPM for the
upcoming ISO visit were already available.
Filing of documents based on the revised RRG is
I
still ongoing.
Conducted 5S, updated the Bulletin Board & the
First Aid Cabinet
References per program per subject - complied
Donayre, C. 22 Raised concern with regards to the designation of Mr. HRMD, Quisido, A April 2023 Waiting for approval.
Duane Bercilla, he was assigned to the LABMO when Request letter was
he was originally under the LIC. Hence, a sent to Accounting
A
recommendation letter addressed to COO Detoya for Office 03/15/2023
approval that Mr. Bercilla be assigned to man the
IMS, UM Tagum.
Ramos, J. 23 LIC Digos HRMD, Quisido, A April 2023
Asked the status on the recommended personnel to
man the IMS, UM Digos.
A
Response: Request letter was sent to Accounting
Office 03/15/2023.Waiting for the approval of the
appointment of Mr. Edgar Lugatman.
Ramos, J. 24 Informed that her requisition for an Office Assistant - -
at LIC, UM Digos had been approved. This is in
I
compliance to CHED requirements particularly the
number of support staff.