SPECIFICATION TABLE

No. ITEM CONTENT


1 CAPACITY
1.1 PRIMARY SEDIMENTATION CHAMBER 8.348 m³
1.2 ANAEROBIC FILTRATION CHAMBER 7.043 m³
1.3 CONTACT AERATION CHAMBER 9.684 m³
1.4 SECONDARY SEDIMENTATION CHAMBER 3.946 m³
TOTAL 29.021 m³
CONTROL PANEL 2 MATERIAL
2.1 BODY MATERIAL FRP
AIR BLOWER 2.2 SEPARATION PLATE , BAFFLE FRP
380V 3Ø
2.3 FILTER , CONTACT MEDIA PVC
E 2.4 DIFFUSER TUBE PVC
SLUDGE RETURN PIPEØ80mm. CONTACT AERATION CHAMBER 2.5 MANHOLE COVER ABS , FRP
ABS.MANHOLE COVERØ650mm. SECONDARY SEDIMENTATION CHAMBER 2.6 INFLOW , OUTFLOW PIPE PVC(Ø150mm.)
7000
B 3 EQUIPMENT
250

3.1 AIR BLOWER 32Ax0.60 m³/min


A (AT3000mmaq)
A
INFLOW OUTFLOW
3000

2500

PIPEØ250mm. PIPEØ250mm. 0.75kw , 380/3/50


(1UNIT)
250

B 3.2 CONTROL PANEL OUTDOOR TYPE


FRP.MANHOLE COVER 1000x1000mm.
AIR VENT PIPEØ100mm. SCUM SKIMMER PIPEØ55mm. (1UNIT)
PRIMARY SEDIMENTATION CHAMBER
ANAEROBIC FILTRATION CHAMBER
PLAN
ANAEROBIC FILTRATION CHAMBER CONTACT AERATION CHAMBER
PRIMARY SEDIMENTATION CHAMBER SECONDARY SEDIMENTATION CHAMBER
INFLOW PIPEØ250mm. 7000 OUTFLOW PIPEØ250mm. AIR VENT PIPEØ100mm.
Ground level Ground level
630

830

230
W.L. W.L.
CONTACT MEDIA
2900

2900

2900

3300
2270

2070
DIFFUSER TUBE
SLAB CONCRETE 200 mm.
LEAN CONCRETE 50 mm. DB12#200mm.
COMPACT SAND 150 mm.
350 700X9=6300 350 40 PILEØ150x6000mm.@700mm. 375 750x3=2250 375
FOUNDATION REFERS FROM STRUCTURE ENGINEERS
SECTION A-A SECTION B-B