Professional Documents
Culture Documents
CONTENTS
1. PURPOSE....................................................................................................................
2. SCOPE.........................................................................................................................
3. REFERENCES.............................................................................................................
4. DEFINITIONS.............................................................................................................
5. RESPONSIBILITIES...................................................................................................
6. INSTRUCTIONS.........................................................................................................
1 PURPOSE
The purpose of this Procedure is to establish the requirements for control of fabrication,
construction, installation and start-up activities. (Referred to jointly as ‘Production
Activities’ for the purposes of this Procedure).
2 SCOPE
Provisions of this Procedure apply to all projects and to all departments concerned in
planning, executing or controlling production activities whether carried out by
Company or by contractors with Company acting as manager or agent.
This Procedure addresses the requirements of ISO9001:1994 Section 4.9 as defined in the
Company Quality Manual QAP-101 Section 8.9.
3 REFERENCES
Management Documents
4 DEFINITIONS
5 RESPONSIBILITIES
Project Construction Managers and Site Managers are jointly responsible for ensuring
that the requirements of this Procedure and the documents referenced within it are
implemented at construction sites and by subcontractors.
Project Procurement Managers are responsible for ensuring that the requirements of
this Procedure and the documents referenced within it are implemented by
suppliers.
6 INSTRUCTIONS
Planning
The requirements for production activities and the means of implementing them
shall be established initially by POC and Construction at the proposal
stage. The requirements shall then be defined by the project based
Engineering and Construction Disciplines. The Project Execution Plan
shall include the specific controls to be applied in order to execute the
project effectively in accordance with QAP-202.
Additionally the Project Construction Manager shall liaise with the Site
Manager to ensure that all site based production activities are identified
and controlled in accordance with the Standard Project Procedures detailed
below:
The Business Management Manager shall, in accordance with GPP 7EG 510,
develop the schedules for the production activities associated with the
Project. Schedules for subcontracted production activities shall be
prepared by the subcontractor, unless otherwise defined.
Work Instructions
Engineering Instructions
The specifications and drawings form part of the design output as defined
in QAP-204 Section 9.0. They shall govern the activities for every phase
of production.
The work instructions shall specify the following aspects of the production
activities where those aspects affect the final quality of the work:
g. Approvals required before the next stage of the work may commence.
Approvals may be required from the responsible Company
personnel, the Client, or a third party organisation.
Construction Instructions
b. Inspection and Test Plans (see Section 6.3.3 and GPP 7EG 616).
Qualification Requirements
Approvals
Acceptance Criteria
Distribution
The Project Field Engineer shall, in accordance with GPP 7EG 624, be
responsible to the Site Manager for the correct distribution of work
instructions. Formal distribution shall be in accordance with the Project
Procedures and shall ensure that copies are readily available to personnel
who need them.
Quality Control
General
The Project Construction Manager and the Site Manager shall ensure that
inspection and test requirements are identified at an early stage, prior to
the start of work on site.
The Project Field Engineer and the Construction Quality Control Engineer
shall maintain a record of the progress of the work and of the inspection
status of the materials, equipment, sub-assemblies and construction work.
This shall be in accordance with QAP-212.
Non-conformance
Equipment
Records
Audits
Where Construction carry out an audit visit to site, they shall discuss with
the Project Quality Assurance Manager the advantages of conducting these
visits with audits performed by Project Quality Assurance.
Monitoring shall be performed in accordance with GPP 7EG 510 and GPP
7EG 504.
Regular reviews and reports of the progress of production activities shall be made
at intervals determined by the Project Manager and in accordance with the
contract requirements. Reviews shall be conducted in accordance with
GPP 7EG 623.
Records
The records shall form part of the quality records for the project and their
maintenance, storage and disposition shall be in accordance with QAP-
216.
Where work has been let by Purchase Order or subcontract, the supplier or
subcontractor shall be made responsible for supplying the relevant records.