You are on page 1of 1

UTU02 Spenso Ultrasonic Inspection Machine

Global Track Maintenance Project


500H inpection List (Condition Based)
Equipment NO : SRO- 31 : ‫رقم اآللة‬

Date : 08.11.2023 : ‫التاريخ‬

Location : North Section : ‫الموقع‬

)√( Check ‫فحص‬ Remarks ‫مالحظات‬

Cooling System Check (Topup If Necessary)

V-Belt (Retension If Necessary)

The Machine is in the North Line


Hydraulic Oil Tank Clean (If Necessary)

Flex Hoses And Fitting,Replace (If Necessary)

Brake Block State Replace (If Necessary)

Walk Around Inspection Leak,Loose Connection Of All System

Sliding Pades Wear Need To Check

Main Filter Silencer Need To Clean (In Pneumatic System)

4 Axle Boxes Need To Grease

Check Oil Level In Axle Gear Box Topup If Necessary

Check Wiper State Replace If Necessary

Change Engine Oil

Air Filters Inner Replace (If Necessary)

Air Filter Outer Replace (If Necessary)

Change Engine Oil Filter Cartridge


Change Pre Fuel Filter (Water Separator)

Change Fuel Filter

‫ن‬
END OF SHIFT :- Chock wheels when parking machine ( ‫تامي االل ة بالدعامات اليدوية‬ ‫ التاكد من‬: ‫)نهاية العمل‬

CLEARED by ‫اسم‬
LIST ANY DEFECTS & ATTACH PHOTOS REPORTED to ‫ترسل اىل‬ DAY ‫اليوم‬
‫الفاحص‬

IMPORTANT NOTE: if defect is a safety hazard or requires immediate rapair: PARK UP MACHINE, attach an OUT OF SERVICE TAG, contact SUPERVISOR & DO NOT USE, untill repaired or cleared by supervisor for use. ( ‫ اذا كان‬: ‫هام‬
‫)العطل او الخلل ر‬
‫متتب عليه مخاطر او يحتاج اصالح فورا اوقف االلة و ضع عليها خارج الخدمة و قم بالتواصل مع المسؤؤل والتقم باستخدامها ر‬
‫حت يتم اصالحها‬

COMMENTS ( ‫)مالحظات‬

Inspected by: Signature ‫التوقــيع‬

Machine Operator Name: ( ‫)اسم مشغل اآللة‬

You might also like