Portfolio AIRA
Portfolio AIRA
TRAINING
FACILITIES
Prepared By:
AIRA P. SALMIN
3B BTVTED MAJOR IN DRAFTING TECHNOLOGY
TECHNICAL DRAFTING NC II
Draft Mechanical Layout and Details
30 meters
Equipment Type
Desktop Computer
Operational Procedure:
Prepare
computer Technical Drafting
Qualification Station/Bldg.
Aided Blgd.
Drawing
Practical
Area/Section Work
Area
Ryan B.
In-charge
Tenorio
Schedule for the 2nd Sem, of MARCH 2024
Ever
Responsi ble Ever
ACTIVITIES y
Person Weekly y Mont Rema
Daily other 15th
y hly rks
r
Day
Day
1.Dispose
Charm
segregated
Castromayor /
waste; clean
(Trainees)
garbage cans
2. Clean and
arrange
working Tables Keld
and stools Rebollos
/
according to (Trainees)
floor
plan/layout;
check stability
3. Clean the
Computer Cza Romero
station (Trainees)
/
& tools in
computer.
Keld
7.Disposal of
Rebollos /
waste materials.
(Trainees)
8.Clean the
Drafting tools
Cza Romero
/
(Trainees)
9.Preform disk
Keld
check/clean on the /
Rebollos
computer.
(Trainees)
11.Inspect and
clean air-
conditioning Ryan Mercaral
/
equipment filter; Technician)
clean body
NURUDIN
12.Conduct
AKBR /
inventory
(Trainees)
Conduct inventory /
Desktop computer
EQUIPMENT CODE Computer 1
LOCATION PRACTICAL WORK AREA (Computer
Lab.)
Schedule for the Month of MARCH
2024
ACTIVITIES MANPOWE
R Daily Ever Wee Ever Mon Remar
y kly y thly ks
Oth 15th
er Day
Day
1.Check panel Activity
board, and is done
circuit breakers’ before
electrical using
connections, the
cables, and X equip
outlets
John Acuna me
• Clean and
(Electrician) nt
kept dry.
• Parts are well
secured/att
ached.
• Properly
labeled
X Activity
is done
before
2.Check if it is
Cza Romero using
properly plugged
(Trainees) the
in.
equip
me
nt
Remarks: All the above are being inspected and done properly.
Remarks: All the above are being inspected and done properly.
Caution /
2024- Mar. System
Battery isolator Mar.2024
005 2024 Unit(case)
Tracing paper
Cutter
Masking tape
T-Square
Broken chairs
Signature:
Date: Date:
Mar; 5, 2024 Mar; 5, 2024
Subsequent
Action Taken: Recommendation:
Inspection of the Repairing of tables
equipment
Date: Date:
Mar 6, 2024 Mar 6, 2024
Date: Date:
Feb; 23, 2024 Feb; 24, 2024
Requested By:
Ryan Mercaral