Proposal for Design, Fabrication, Supply and Installation of Pre Engineered Building

Ref # Ipeb/168/2023 Date: 16th Oct 2023

To,
M/s. KL University,
Borampet.
Kind Attention: Sri. Sanjay Singh Garu

Sub:- Submitting of Quotation for Design, Fabrication, Supply, and Installation of Pre-
Engineered Buildings for your proposed PEB Shed in Borampet - Reg.

We are Extremely thankful to you for giving us the opportunity to submit our proposal for
your project.

We request to study the proposal and await your valued order to commence execution, if
you need any clari cations, please get in touch with us; we shall be happy to assist you.

Assuring you of our best attention and looking forward to coordinating with you, we
remain,

Thanking You,

Yours Faithfully,

M/s. Indigo Pre Engineered Buildings Pvt Ltd.,


Sai Prasanna N
Head-Projects
+91 8142278123
fi
1. SCOPE OF WORK:

1 Building Usage University

2 Total Building Area 280 sqm /3014 sft

Frame type : Single Slope Lean to Curved ra ers


Building Enclosure Condition : Partially Enclosed Condition
Length of Building : 26.212 M o/o
Width of Building : 10.668 M o/o
Clear Height of the Building : 4.5 clr HT
Bay Spacing : As Per Drawing
Roof Slope : 1:10 slope
Gable End Column Spacing : N/A
Interior column Spacing : N/A
Support column for internal
: N/A
partition wall
Roof Bracing : Consider Rod Bracing for roof @ 2 Bays
Wall Bracing : Consider Rod Bracing for wall @ 2 Bays
Future Expansion for Length wise : Not Consider
Future Expansion for Width wise : Not Consider
Roof and Wall Cladding Details :
0.5 mm thick Bare Galvalume/Colour Coated
Roof Panel :
Sheeting -TATA Steel

Wall Panel : 0.5 mm thick Colour Coated Sheeting -TATA Steel


RAL Colour if any for Wall
:
Cladding
Wall Condition :
Front End Wall : Not Consider
Rear End Wall 3m Brick wall and above sheeting

Le Side Wall 3m Brick wall and above sheeting

Right Side Wall 3m Brick wall and above sheeting


ft
ft
Intermediate Partation Not Consider

Drain Condition

Rain Water Gutter Consider

Vertical Down Spout Consider

Flashings & Trims Consider

Canopy and Framed Opening

Canopy Details Not Consider

Framed opening Details Consider 3x3 m 1 No’s FO

Fascia Details

Fascia for Side wall Not Consider

Fascia for End wall Not Consider

Primary Surface

Sand Blasting Not Consider

Shot Blasting Not Consider

Painting Details

One Coat of Enamel paint and one coat of


Enamel Enamel Primer considered make by Berger/
Asian/ Indigo
Epoxy Not Consider
Building Accessories

Roof Monitor Not Consider

Turbo Ventilators Not Consider

Skylights Not Consider

Wall Lights Not Consider

Fixed Louvers Not Consider

Provision for Windows Not Consider

Insulation for Roof Not Consider

Insulation for Wall Not Consider

Density of Insulation if applicable Not Consider

GI Wire Mesh Not Consider


Roof Life line Not Consider

Cage Ladder for roof access Not Consider

Mezzanine Details Not Consider

Location of Mezzanine Not Consider

Live load Not Consider


Dead Load Not Consider
Total Mezzanine Area Not Consider

Staircase Details Not Consider

EOT Details & Mono Rails Not Consider

EOT Location & Details Not Consider

Capacity of EOT Not Consider

Li ing Height of EOT Not Consider

EOT girder Not Consider

cat Walk Not Consider

Ladder Not Consider

Structural Design Codes

Design AISC-LRFD & Deflection Criteria as per


Design Codes
AISC/MBMA standards.
Designed in accordance with the 1996 edition
Cold Formed Design
of the AISI
All Welding is one in accordance with the
Welding Details 2000 Edition of the American Welding
Society
Wind Load Calculation Wind loads as per IS:875 Part-III -2015
Wind Speed Wind Speed = 44 m/sec , Seismic Zone II
Seismic Load is designed in accordance with
Seismic Zone
IS:1893 (Part - 1)
Design Load Conditions

Dead Load 0.1 kn/m²


Live Load 0.57 kn/m²
Collateral Load N/A
ft
Other Roof Load N/A

Structural Member Details

Built-Up Sections TATA/SAIL/JSW


Cold Formed (Secondary
JSW
Members)
Anchor Bolts Un Painted
High Strength Nut & Bolts 8.8 Grade
Secondary Bolts 4.8 Grade
Self Drilling screws make of Corroshield, Real
Fastners
Fastners, Builtex or EJOT

Deck Sheeting for Mezzanine Consider GI Deck Sheeting 0.8 mm thick

2.GENERAL NOTES:
1. Power and Water should be provided by the Customer.
2. Accommodation should be provided by the Indigo.
3. Roller Touch-up paint will be done at the site by Indigo PEB.
4. the sufficient place for stacking of material to be provided. customer to provide a mud-
free location for stacking the finished goods delivered at the site. 24-hour security to be
provided by the customer.
5. compacted and level surface to be provided around the building for erection work
6. GA Drawings will be submitted within one week of receiving the PO and Advance.
7. The customer should return the approved GA Drawings within 3 to 4 working days.
8. If the project is cancelled after the submission of GA Drawings, the customer should bear
the design and service charges of 5% of the total project.
9. if there are any changes in the technical specifications of building dimensions, loads,
etc., after receipt of approval drawings and completion of shop/production drawings, the
customer agrees to pay reengineering charges proportionately has to be bear.
10.Indigo will deliver the material in 6- 8 weeks as per commitment.
11.construction of PEB as per the drawings and quantities (with - 3% tolerance allowed as
per PEB industry Standards.
1. SUPPLY OF PRICE:- OPTION - 1

S# Item Description Total Price

Supply of Pre Engineered Building As per above


1 10,50,000.00
specifications

2 Erection 2,00,000.00

Total Rs 12,50,000.00

2.PAYMENT TERMS:
1. Freight: Included transport

2. GST: 18% Extra on the above price

3.Payment Terms for Supply of Material


1. 50 % Along with PO

2. 50 % Before dispatch of materials

4.Payment Terms for Erection Work


1. 30% Mobilisation Advance

2. 30% A er Completion of the Main Erection

3. 30% A er completion of sheeting

4. 10% A er completion of the Project.

We trust you will nd our quotation in line with your requirements and we now look
forward to receiving your valued order for our prompt service.

Thanking you and assuring our best attention and prompt services at all times.

Yours Faithfully,

M/s. Indigo Pre Engineered Buildings Pvt Ltd.,


Sai Prasanna N
Head-Projects
+91 8142278123