Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. You’re learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
5. Provision of Health
surveillance for workers
who working on noise
producing machines One month
4. Workers who involve in Rest break was provided 1. In packaging section, automatic Three week Project
Musculoskeleta packaging of suits to workers frequently packaging machine must be Manager (1)
l Disorders installed to avoid the manual
In packaging sections, Tool box talk Used to be packaging of stitch suits
It was observed workers were packing of conducted before work Production
that workers were stitching suits into bags 2. Hiring of new workers to Manager
repeatedly doing continuously all the day distribute the work among Two week (2,3,4)
the same tasks of without taking supervision workers
packaging of suits and guidance
Medical lead
This may cause back bone 3. Provision of job rotation to One week staff (5)
problem, shoulder workers
dislocation, joints problem HSE officer
5. Fire. All who expose to fire Workers were wearing 1. Fabric rolls must be removed Two week HSE Manager
might get harmed fire resistance gloves from place to avoid fire in (4,5)
It was observed finishing section
that flame was Workers were using the Fires extinguisher placed
being used to flame to bulging fabric in different parts of 2. Fire Detector should be Installed One week Production
bulging of Fabric particle while fabric rolls warehouse inside the area Manager
particle that may was placed beside. They (1,2,3,6)
cause the fire One week
were working without any 3. Supervision of hole watcher
supervision of hole watcher must be provided to workers
and using proper personal
protective equipment. It 4. Installation of fire extinguisher at Two weeks
may cause skin burn, different accessible placed inside
breathing problem, lungs the finishing area
infection as well as external
severe injuries, and death 5. Fire fighting kits need to be Three days
of the worker placed in area
.
6. Physical Operator who using the Issuing of Permit to work 1. Sewing machine having damage Ten days HSE manager
Hazard- Vibration machine might get harmed to workers moving parts must be replaced (4,5)
Provision of Job rotation with Genuine parts
Motors of sewing It was observed that to workers Project
machines operators were using the 2. Proper lubrication of machine One week Manager (1)
producing sewing machine producing should be done after certain
vibration of high vibrations while workers period of time Production
Manager,
amplitude that were working without any
Two week (2,3)
causes shaking of Safety precautions. 3. Separate space must be
hands and body Exposure to vibration for allocated for machines to reduce HSE officer
longer time may cause noise (6)
shivering, tingling,
numbness, nerve damage 4. Workers need to be get proper One week
and white fingers rest breaks after an intervals
8.General Workers who using the Floor were levelled and 1. Design and implementation of Two week Production
Workplace pathway might get harmed maintained regularly proper wire management Manager (2,4)
Hazard- Slips & Floor was being properly system to avoid the scattering of
Trips It was seen that all the lighted wires on floor Area Manager
P computer, printer and (1,3)
In administration other equipment wires 2. Floor must be cleaned properly
office, wires were were scattered on the wires after stacking of wires under
HSE Officer
9. Manual Workers who involve in Workers were working 1. Workers should be provided Twenty five HSE Manager
Handling manual handling might get under supervision third party verified fork lifter as days (5,6)
harmed Safety sign boards of mechanical assistance to reduce
It was seen that carrying load were the work load
workers who In warehouse, workers Production
displayed Manager
working inside the were carrying of 40 kg 2. Hiring of more workers to divide
warehouse were fabric rolls on their the load among workers One week (2,3,4)
carrying heavy shoulders and carrying it to
Finance
weight of fabric cutting section. They were 3. Provision of job rotation to
manager (1)
rolls on their working without wearing workers who involve in manual
shoulders. any safety precautions such handling One week
Some ILO conventions put pressure on Employer to install technical devices to reduce hazards in workplace.
Specific legal arguments
Likewise: R156 – Working Environment (Air Pollution, Noise and Vibration) Recommendation, 1977 (No. 156) says
that;
“11. The employer should ensure the regular inspection and maintenance of machines and installations, with
respect to the emission of harmful substances, dust, noise and vibration.
▪ 12. The competent authority should, when necessary for the protection of the workers’ health, establish a
procedure for the approval of personal protective equipment”.
https://www.ilo.org/dyn/normlex/en/f?p=NORMLEXPUB:12100:0::NO::P12100_INSTRUMENT_ID:312494
R164-Occupational Safety and Health Recommendation, (1984) says that;
“To provide and maintain workplaces, machinery and equipment, and use work methods, which are as safe and
without risk to health as is reasonably practicable”. https://www.ilo.org/dyn/normlex/en/f?
p=NORMLEXPUB:12100:0::NO:12100:P12100_INSTRUMENT_ID:312502:N
This ILO recommendation provides guidance to install and maintain devices so that to reduce emission of harmful
substances.
Likelihood is high in this case because workers are direct expose to chemical vapours that use in testing of fabric
Consideration of likelihood AND
severity material.
types of injury or ill health Severity is high as workers were under exposure of strong chemicals like Chlorobenzenes
number of workers at risk Chlorinated solvents and Chlorophenols which is highly concentrated and dangerous for health. Injuries may be
how often the activity is categories as
carried out
how widespread the risk is Minor: Injuries can be cured by first aid treatment.
Major: Severe injuries for which hospital treatment will be required.
Fatal: death of the worker will occur after falling from height
Workers are directly expose to hazardous chemicals almost 25 hours per week
Workers who performing chemicals testing and other people who expose to chemical vapours are under risk of
getting this hazard
How effective the action is likely to As likelihood is high in this case, so installation of local exhaust ventilation is an effective action to control the
be in controlling the risk. This chemical vapours inside the laboratory
should include:
the intended impact of the 14 days will be repaired to complete this action. In this duration, finance manager will get approval from CEO of
action; the company, collect funds and purchase local exhaust ventilation system. Maintenance team will install the
justification for the timescale system and start running in Laboratory
that you indicated in your
risk assessment; and In my view, it will completely control the hazards while proper maintenance of system and personal protective
whether you think the action equipment must provide to workers
will fully control the risk
Article 17 named “Plant, Machinery, Equipment and Hand Tool” of International Labour
Specific legal arguments
Organization Convention C167 says that installed machinery should be free of hazard and
maintained on time by competent person of facility.
It says further “Plant, machinery and equipment, including hand tools, both manual and power driven, shall
be of good design and construction, taking into account as far as possible ergonomic principles, be
maintained in good working order, be used only for work for which they have been designed unless a use
outside the initial design purposes has been assessed by a competent person who has concluded that such
use is safe, be operated by workers who have received appropriate training”.
Likelihood is high as workers were stitching continuously on machine having needle inside it. Chances of
Consideration of likelihood AND severity
broken of needle is high while worker were working without any supervision
types of injury or ill health
Operators who working on machine are under the risk of getting this hazard
How effective the action is likely to be in Guards on needle is an effective action that eliminate the connection between operator and needle and
controlling the risk. This should include: protect the operator for getting injuries
the intended impact of the action;
justification for the timescale that To complete this action, 10 days will be enough. First finance officer get funds from management. After
you indicated in your risk purchasing the guards, maintenance team will install the guards on needle
assessment; and
whether you think the action will It will completely control the hazards while proper maintenance of the guards should be done to use it for
fully control the risk longer time and protect the operators
As it is clearly stated in the international labour organization, ILO convention, C167, 1988.
Specific legal arguments
In the Article Number, 26 the Clause Number 2.
“Before construction is commenced and during the progress thereof adequate steps shall be taken to
ascertain the presence of and to guard against danger to workers from any live electrical cable or apparatus
which is under, over or on the site.”
The Pakistan health and safety act 2018, says that, in number 1 convention it is
stated that.
“ protection of the workers must be done against the dangerous circumstances where the risk is present.
Likelihood is very high. Workers were working on machine having prominent chances of getting
Consideration of likelihood AND severity
electrocution because damage insulation of wire
types of injury or ill health
number of workers at risk Severity is high as machine were made up of steel and wire was damage at several places and touching with
how often the activity is carried machine. High voltage current passing through the wire for running of machine.
out Major: injuries like skin burn will occur and there will be hospital treatment required.
how widespread the risk is Fatal: death of the worker may occur due to high voltage current
12 workers were expose to this hazard because of using of machine with poor insulated wire
It’s daily routine work and workers were operating the machine continuously for all the time in their duty
Machine operator and workers who working near the machine might get harmed
How effective the action is likely to be in It’s highly effective and beneficial action for workers and management to control the hazards as high voltage
controlling the risk. This should include: current may cause the death of workers
the intended impact of the action;
justification for the timescale that 15 days Is enough for this Acton. First, financial officer will get approval from CEO of the company. Second,
you indicated in your risk finance officer will collect funds. Third, wires will be purchased from market and electrical supervisor will
assessment; and replace the wire
whether you think the action will
fully control the risk I think it will control the hazards while proper inspection of the wire need to be done after certain period of
time to protect the workers for longer time