Physical Progress Date: 26-02-2023

LOT # Activities Qty


UC-04:
1 House Connections 50 Nos.
L2.2.2 Tariq bin Zayad (15") pipe laid 3 Nos.
Pak Avuenue Street near Civil Hospital (24'') pipe laid 14 Nos.
L2.2, Tariq bin Zayad (42'') pipe laid 1 No.
L2.2, Tariq bin Zayad (36'') pipe laid 5 Nos.
L2, Faisalabad Road (72'') pipe laid 8 pipe
2

Pipe Production:
21'' dia = 2
24'' dia =6
36'' dia = 4
42'' dia= 4 16 Nos.
Dry well:
Brickwork in core wall (inner side) 1250 cft
3
Office building:
Brickwork in superstructure 112 cft
4 L3, 72'' dia, Manhole # 126 Brickwork 118 cft
Road 1: Fateh Sher
Model Roads Excavation of drain 70 Rft
Spreading of water bound from RD 0+400- 1+000