Pipe Production:
21'' dia = 2
24'' dia =6
36'' dia = 4
42'' dia= 4 16 Nos.
Dry well:
Brickwork in core wall (inner side) 1250 cft
3
Office building:
Brickwork in superstructure 112 cft
4 L3, 72'' dia, Manhole # 126 Brickwork 118 cft
Road 1: Fateh Sher
Model Roads Excavation of drain 70 Rft
Spreading of water bound from RD 0+400- 1+000