Construction of H.L. bridge at Ch.30.

75 km on road from NH6 to Riamal

longitudinal section of Nala along longest bed

u/s to b/s b/s to d/s

points Dist (m) Level (m) Dist (m) Level (m)

1 0 54.319 175 52.978

2 20 54.219 200 52.726

3 40 53.889 220 52.912

4 60 53.963 240 52.515

5 80 53.793 260 52.264

6 100 53.617 280 52.097

7 120 53.445 300 51.848

8 140 53.512 320 51.955

9 160 53.093 340 51.676

10 175 52.978 350 51.509

55 longitudinal section
54.5

54

53.5

53

52.5

52

51.5

51

50.5

50
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380

Longitudinal slope = 0.016 0.01 1in 125


Retaining wall

100.000 Formation Level

Height= 0.750 m

GL 99.250

0.5 0.75 99.000


1.25
0.8 d3

0.300 0.300

98.200 Founding Level

1.850
STABILITY ANALYSIS OF RETAINING WALL [ DRY - CONDITION ]

Founding RL 98.200 m
Unit Weight of Concrete 2.4 T / m3
Unit Weight of Soil 1.6 T / m3
Dry Condition
Slope of Earth Fill (1V:xH) 1000000
Slope angle of Earth fill β 0.00 o
Overall Abutment
Dist of inner Length
slanting face 1m
from toe 1.55 m
Wall angle α 90.00 o
Angle of Repose ϕ 25.00 o
Wall Friction δ 16.67 o
Coulomb's Active Ep Coeff 0.361
Stresses 7.129 T / m2 Rankine's Passive Ep Coeff 2.464
0.149 T / m2 Height of LL as Surcharge 1.20 m
F.S. for Over Turning 2.88
F.S. for Sliding 1.44

Sectio Volume per unit length Density Weight


No. B D Lever Arm Moment
1 1 0.500 1.000 2.400 1.200 0.550 0.660
2 0.5 0.750 1.000 2.400 0.900 1.050 0.945
3 1 1.850 0.800 2.400 3.552 0.925 3.286
Vertical Loads of Earthfill
1 1 0.300 1.000 1.600 0.480 1.700 0.816
2 0.5 0.750 1.000 1.600 0.600 1.300 0.780
Total V 6.732 M 6.487

Horizontal Forces

A. Earth Pressure
K γ H
P1 = 0.361 1.600 1.20 = 0.693 T / m2
P2 = 0.361 1.600 1.800 = 1.039 T / m2
P3 = 0.361 2.400 0.300 = 0.260 T / m2
Sectio Earth Pressure Force per unit length
No. B D Force Force Lever Arm Moment
A. Earth Pressure for Live Load(surcharge)
1 1 0.693 1.800 1.247 1.247 0.900 1.122
2 1 0.260 1.800 0.468 0.468 0.900 0.421
B. Active Earth Pressure of Back Fill
1 0.5 1.039 1.800 0.935 0.935 0.756 0.707
Sum 2.650 2.250

Calculation of Stresses

Sum of Restoring Moments 6.487 T.m


Sum of Overturning Moments 2.250 T.m
Net Moments 4.236 T.m

Sum of Vertical Forces 6.732 T


Sum of Horizontal Forces 2.650 T
Eccentricity of Resultant from edge = x 4.236 / 6.732 = 0.629
Width of Base 1.850
Eccentricity of Resultant from centre of Base = e 0.296

Stress at Toe = 7.129 T / m2


Stress at Heel = 0.149 T / m2
<10 T / m2 Hence SAFE

Check for Over Turning

Sum of Restoring Moments 6.487 T.m


Sum of Overturning Moments 2.250 T.m

Factor of Safety = 2.88 >2.0


Hence SAFE
Check for Sliding

Sum of Sliding Forces = 2.650 T


Sum of Vertical Forces = 6.732 T

0.462
Sum of Resisting Forces = 3.828 T

Factor of Safety = 1.44 >1.5


Hence UNSAFE and Provide Key
STABILITY ANALYSIS OF RETAINING WALL AT RL:96.20m[ DRY - CONDITION ]

Section Volume per unit length Density Weight


No. B D Lever Arm Moment
1 0.5 0.750 1.000 2.400 0.900 0.500 0.450
2 0.5 0.750 1.000 1.600 0.600 0.250 0.150
3 1 0.500 1.000 2.400 1.200 1.000 1.200
Total V 2.700 M 1.800

Horizontal Forces

A. Earth Pressure
K γ H
P1 = 0.297 1.600 1.20 = 0.570 T / m2
P2 = 0.297 1.600 1.000 = 0.475 T / m2
P3 = 0.297 2.400 0.300 = 0.214 T / m2

Section Earth Pressure Force per unit length


No. B D Force Force Lever Arm Moment
A. Earth Pressure for Live Load(surcharge)
1 1 0.570 1.000 0.570 0.570 0.500 0.285
2 1 0.214 1.000 0.214 0.214 0.500 0.107
B. Active Earth Pressure of Back Fill
1 0.5 0.475 1.000 0.238 0.238 0.420 0.100
Total 0.492
Check for Shaft Thickness(Retaining wall)

Length of retaining wall at Base


a. Straight portion 1000 mm
Maximum Moment MLL = 0.492 T.m
MTT = 0.000 T.m
Maximum Vertical Load N 2.700 T.

Assume following Reinforcments in critical section


Overall depth of Section 1.25 m
Size of Main reinforcement 12 mm
Size of stirrups 12 mm
Cover 40 mm
Hence, Effecive depth of Section de 119.2 cm

Grade of Concrete M15


Permissible Bending Stress of concrete scbc 50 Kg/cm2
Permissible Tensile Strength of Reinf. Fe415 sst 2400 Kg/cm2
Modular Ratio m 10.00
k 0.1724
j 0.9425
Q 4.0626 Kg/cm2

Maximum Bending Moment in LL Direction = 0.49 T.m


MLL = 49183 Kg.cm
b= 100 cm

Effective depth required = d =


Effective depth provided = d =
d =
√ M
Qb
= 11.00 cm
119.2 cm Hence, Safe

Provision of Main Reinforcements M


A st =
At centre
σ st . j. d
Maximum Bending Moment B.M. = 0.49 T.m. (Tension )
Overall depth of Shaft = 125 cm
Overall length of Shaft = Straight = 100 cm
Effective depth = d= 119.2 cm
Effective length = b= 100.0 cm
sst = 2400 Kg/cm2
Reinforcement Required = Ast = 0.182 cm2
Minimum Reinforcement = 0.12% = 14.304 cm2
No. of Main Reinforcement for 14.304 cm2
Using 10 mm F = 18.2 Nos.
Let us provide 10 mm F 18.21 Nos. on earth side face
Provide 10 mm F 18.21 no on other side

Spacing of each bar in the LL face on 100 / 18 = 5.5 or say 15.00 cm


the earth side shall be

Spacing of bar on the river side 15.00 cm

Similarly, for the TT face let us Provide 8.33 9.00 Nos on either side
Let us provide 10 mm F 9.00 Nos. on either side of Semi -Circular faces
Hence, Reinforcement Provided = 18.21
10 mm F 18.21242 Nos. each = 14.30 cm2
In adequate
Calculation of Direct Stress
Reinforcement Provided = 10 mm F 18.2 Nos.
Asp = 14.30 cm2
Effective depth = d= 119.2 cm
Effective length = b= 100 cm

Ac=bxd - Asp 11905.70 cm2


Modular Ratio a= 10.00
Total Vertical Load N= 2.7 T
N
Direct Stress = σ co ,cal = = 0.22 Kg/cm2
A +α . A
c sp
Maximum Moment MLL = 0.492 T.m
MTT = 0.000 T.m
Section Modulus ZLL = 236810.7 cm3
ZTT = 198666.7 cm3
Bending Stress =
LL Direction scc,cal = 0.208 Kg/cm2
TT Direction scc,cal = 0.000 Kg/cm2
For Grade of Concrete M30
sc 50 Kg/cm2
sco 33 Kg/cm2

(i) sco,cal sc,cal


+ =
sco sc
0.22 0.208 + 0.000
+ =
33.33333 50
= 0.011 < 1, Hence satisfied

(ii) Resultant Tension due to Direct compression and Flexure =

Direct Stress Compression = 0.22 Kg/cm2


Flexure - LL Tension = -0.208 Kg/cm2
Flexure - TT Tension = 0.000 Kg/cm2
Resultant 0.02 Kg/cm2

Within permissible limits, hence Safe.


Permissible Tensile Stress for M15 Concrete = 5.1 Kg/cm2
Distribution steel
Distribution reinforcements @0.001 Ac= 656.25 mm2
25% of vertical reinforcement= 358 mm2
Spacing of 6 mm distribution reinforcements= 86 mm

Provide distribution reinforcements of 6 mm dia @ 150 mm C/c both faces


Checking of Section using Cracked Section Analysis (For Return wall Shaft)
Data
1. Effective Width of Section B 520 cm
2. Overall Depth of Section D 125.0 cm
3. Vertical Load on Section V 2.70 T B
4. Applied Moments MLL 0.49 T.m
MTT 0.00 T.m
5. No. of Compression Reinforcement 18 10.00 mm F L Asc L
Area of Compression Reinforcement Asc 14.30 cm2 D Ast
B
6. No. of Tension Reinforcement 18 10 mm F
Area of Tension Reinforcement Ast 14.30 cm2
7. Size of Transverse Reinforcement 12 mm F
8. Grade of Concrete = M30
Permissible Bending Stress of concrete scbc 50 Kg/cm2
Permissible flexural Stress of steel sst 2000 Kg/cm2
Assume
1. Cover dc 5.0 cm
2. Modular Ratio m 10 Ref. IRC 21
Hence
1. Effective Cover in Compression side dc 6.7 cm
2. Effective Depth of Section de 118.3 cm

From the Equation


Qna = ( Bn2/ 2 ) + ( m - 1) Asc ( n - dc ) - m Ast ( de - n )
Qna = 260.000 n2+ ( 271.776 n)+( -17565.312 )

From the Equation


Ina = ( Bn3/ 3 ) + ( m - 1) Asc ( n - dc )2 + m Ast ( de - n )2 Eqn. 1
Ina = 173.333 n +( 3
271.776 n )+(
2
-35130.624 n)+( 2007608.025 )

From the Equation


H = e + n - ( D / 2) where, e = Moment / Vertical Load = 18.22 cm
H= n- 44.284

From the Equation Eqn. 2


Ina = Qna x H = 260.000 n3 +( -11242.064 n2 )+( -29600.640 n)+( 777862.277 )

Equating Equation No. 1 and Equation No. 2, we get


86.667 n3 + ( -11513.840 n2)+( 5529.984 n)+( -1229745.748 ) = 0
Solving for n,
we get, n= 4.33 cm
Qna = -11513.808 Ina = 1874659.6
Stress in LL Direction
Stress in Concrete = s c = ( V x n ) / Qna = -1.015 Kg/cm2
Stress in Steel = s t = [ sc x (de - n ) x m ] / n = -267.261 Kg/cm2
Stress in TT Direction
ZTT = (nB2/ 6)+[(m - 1)( Ast + Asc)( B - 2dc)2 / ( 2D )] = 459452.78939 cm3
Stress in Concrete = s c = MTT / ZTT = 0.000 Kg/cm2
Stress in Steel = s t = [ sc x m ] = 0.00 Kg/cm2
Total Stress Check with Premissible Limits
Stress in Concrete = s c = LL + TT = -1.015 Kg/cm2 < 50.0 , Hence Safe
Stress in Steel = s t = LL + TT = -267.261 Kg/cm2 < 2000.0 , Hence Safe
FOOTING DESIGN

Dry condition
Stress in the heel = + 0.149 T/m2
Stress near stem on heel side = + 1.281 T/m2
Maximum condition
Stress near stem on Toe side = + 5.997 T/m2
Stress in the toe = + 7.129 T/m2

Maximum stress
Stress in the heel = + 0.149 T/m2

Stress in the toe = + 7.129 T/m2

Pressure from the footing


From the footing (on Heel Side)
from footing at the end = - 2.000 T/m2
from footing near the Stem 2.000 T/m2 6.400
from Earth = - 4.400 T/m2 6.400
WITH OUT EARTH LOAD
From the footing (on Toe Side)
from footing at the end = - 2.000 T/m2
from footing near the Stem 2.000 T/m2 2.000
from Earth = - 0.000 T/m2
2.000
Net pressure =
Stress in the end of the heel = -6.251 T/m2

Stress near stem on heel side = -5.119 T/m2

Stress near stem on Toe side = 3.997 T/m2


Stress in the end of the toe = 5.129 T/m2

Stress Diagram at the Base

0.3 0.3

-6.251 + -5.119 +
3.997 5.129

Design of Heel Slab

Mmax = -0.26 T.m


Smax = -1.71 T

Assume following Reinforcements in Footing


Overall depth of Section 0.8 m
Size of Main reinforcement 8 mm
Size of stirrups 6 mm
Cover 75 mm
Hence, Effecive depth of Section de 72.1 cm
Tensile stress of Steel sst = 2400 Kg/cm2
Grade of Concrete M15
Permissible Bending Stress of concrete scbc 50 Kg/cm2
Permissible Tensile Strength of Reinf. sst 2400 Kg/cm2
Modular Ratio m 10
k 0.17
j 0.94
Q 4.06 Kg/cm2

b= 100 cm

Effective depth required = d =

Effective depth provided = d =


d ==
√ M
Qb
72.1 cm
8.07 cm

Hence, Safe
M
A st =
Provision of Main Reinforcements
σ st . j . d
Reinforcement Required = Ast = 0.162 cm2
Minimum reinforcement required = 0.12%= 9.6 cm2
Spacing of reinforcement 10 mm bar

8.181 cm c/c

Provide 10 mm HYSD bar at 10.000 cm c/c


Actual Reinforcement provided 5.027 cm2

Maximum shear stress 0.24 Kg/cm2


100xAst = 0.070 %
bd
so, permissible shear stress = 0.320 N/sqmm or = 3.20 Kg/cm2

So nominal minimum shear reinforcement to be provided


Provide four legged/m shear reinforcement of 10mm dia At 300mm c/c

Design of Toe Slab

Mmax = 0.21 T.m


Smax = 1.37 T

Assume following Reinforcments in Footing


Overall depth of Section 0.8 m
Size of Main reinforcement 16 mm
Size of stirrups 10 mm
Cover 75 mm
Hence, Effecive depth of Section de 71.7 cm
Tensile stress of Steel sst = 2000 Kg/cm2

Grade of Concrete M15


Permissible Bending Stress of concrete scbc 50 Kg/cm2
Permissible Tensile Strength of Reinf. sst 2400 Kg/cm2
Modular Ratio m 10
k 0.1724
j 0.9425
Q 4.0626 Kg/cm2

b= 100 cm

Effective depth required = d = d ==


√ M
Qb
7.25 cm
Effective depth provided = d =
d =
√ M
Qb
71.7 cm Hence, Safe
M
Provision of Main Reinforcements A st =
σ st . j. d
Reinforcement Required = Ast = 0.132 cm2
Minimum reinforcement required = 0.12%= 9.6 cm2
Spacing of reinforcement 8 mm bar

5.236 cm c/c

Provide 8 mm HYSD bar at 15.000 cm c/c


Actual Reinforcement provided 15.415 cm2

Maximum shear stress 0.19 Kg/cm2


100xAst = 0.215
bd
so, permissible shear stress = 0.216 N/sqmm or = 2.16 Kg/cm2

Provide four legged shear reinforcement of 10mm dia at 300mm c/c

Summary
Heel portion

In upper layer 10 10.0 cm c/c


In lower layer 8 15 cm c/c

Toe portion

In upper layer 10 10.0 cm c/c


In lower layer 8 15 cm c/c
High Level Bridge at Ch.30.75 km on road from NH6 to Riamal
Horizontal Forces For Piers
A. Braking Force

A. Braking Force
Maximum Load on Span
a. 70R Loading 92.00 T
b. Class A Loading 0.00 T
Total 92.00 T
Fh = 0.2 F = 18.40 T Ref: Cl. 214.2 of IRC:6-2000

I For Small Spans upto 10m


[ Not considered in case of Piers as it cancells from bothsides ]
Where Rg = 92.290 T Reaction at free end due to dead load
m = 0.50 For Concrete over Concrete

Fh/2 9.20 T Ref: Cl. 214.5.1.3 of IRC:6-2000


or m Rg 46.15 T

Braking Force for Pier For Small Spans upto 10m 9.20 T at R.L. #REF! m
For pier braking force=10%extra in sub structure and foundation 10.12 T
FOR PIER
BRAKING MOMENT
R.L MLL
A Bottom of Cantilever #REF! #REF! tm

B Base of Pier Shaft #REF! #REF! tm

C At Founding Level #REF! #REF! tm


B. Wind Pressure

Dimensions of Railings
Height Solid Section above Pier Cap Level #REF! m
Height of Void Section #REF! m
Hence, Centroid of Wind Force above Bearing Top Level = #REF! m at RL #REF! m
For HFL Condition
Height of Wind above H.F.L. = H = #REF! m Say H = #REF! m

#REF!
Wind Velocity = V = #REF! Km / h
Wind Pressure = P = #REF! Kg / m2
For Dry Condition
Height of Wind above Lowest Bed / Lowest Water Level = H = #REF! m Say H = #REF! m

#REF!
Wind Velocity = V = #REF! Km / h
Wind Pressure = P = #REF! Kg / m2
I. As per Cl. 212.2 & 212.3 of IRC - 6:2000
Wind Force as a horizontal Force on the Structure with pressure intensities as per Table - 4
Span Length = 10.740 m
For HFL => Wind Pressure = P = #REF! T/m2
Force for Pier #REF! T

Bottom of Pier shaft at R.L. #REF! m Moment= #REF! T-m


About Foundation at R.L. #REF! m Moment= #REF! T-m

For Dry => Wind Pressure = P = #REF! T / m2


Force for abutment = #REF! T

Bottom of Pier shaft #REF! m Moment= #REF! T-m


About Foundation #REF! m Moment= #REF! T-m

II. As per Cl. 212.4 of IRC - 6:2000


For Wind Force = 300 Kg/m on fully Loded Span acting at 1.5 m over Formation Level
Length of Live Loads
a. Class AA 7.2 m and next after 90m
b. 70R Tracked 4.57 m and next after 30m
c. 70R Wheel 14.92 m and next after 30m
d. Class A 20.3 m and next after 18.5m
Maximum Length of Live Load on Span = 10.760 m
Wind Force = 10.800 x / = 3.228 T
Formation level+1.5m 101.500

FOR HFL & Dry Condition

Bottom of Pier shaft at R.L. #REF! m Moment= #REF! T-m


About Foundation at R.L. #REF! m Moment= #REF! T-m

III. As per Cl. 212.5 of IRC - 6:2000


Wind velocity at 130 km/h with no live load on the Structure
Wind Velocity = V = 130 Km / h
Wind Pressure = P = 110 Kg / m2
FOR HFL

Bottom of Pier shaft Moment= #REF! T-m


About Foundation Moment= #REF! T-m
FOR DRY CONDITION

Bottom of Pier shaft Moment= #REF! T-m


About Foundation Moment= #REF! T-m

III. As per Cl. 212.6 of IRC - 6:2000


( Same for both HFL and Dry Condition)
Wind Force at 450 Kg/m on deck slab
Span Length = 10.740 m
Wind Force for Pier= 10.740 m x 0.450 / 2 T/m = 2.417 T
FOR HFL & Dry Condition

Bottom of Pier shaft #REF! m Moment= #REF! T-m


About Foundation #REF! m Moment= #REF! T-m

V. As per Cl. 212.7 of IRC - 6:2000

Wind Force of 240 Kg/m2 on the unloaded structure


FOR HFL

Bottom of Pier shaft Moment= #REF! T-m


About Foundation Moment= #REF! T-m

FOR DRY CONDITION

Bottom of Pier shaft Moment= #REF! T-m


About Foundation Moment= #REF! T-m

A. Moment Due to Combined wind Forces


as per Cl. 212.2& 212.3, Cl. 212.4 & Cl. 212.5

Cl. 212.2 & 212.3 + Cl. 212.4 + Cl. 212.5 =


HFL Dry

Bottom of Pier shaft #REF! Tm #REF! Tm


About Foundation #REF! Tm #REF! Tm
B. Moment Due to Wind Forces as per Cl. 212.6

Bottom of Pier shaft #REF! Tm #REF! Tm


About Foundation #REF! Tm #REF! Tm
C. Moment due to Wind Force as per Cl. 212.7

Bottom of Pier shaft #REF! Tm #REF! Tm


About Foundation #REF! Tm #REF! Tm

FINAL MOMENTS DUE TO HFL DRY


WIND PRESSURE ON Pier MLL MTT MLL MTT

Bottom of Pier Shaft #REF! #REF! #REF! #REF! t-m


About Foundation #REF! #REF! #REF! #REF! t-m
C. Force due to Water Current

C/s Area of Pier along the Flow AT = #VALUE! m2


C/s Area of Pier transverse to Flow AL = #VALUE! m2
Mean Water Velocity = #REF! m/sec
Max. Water Velocity - Ö 2 x V = Vmax = #REF! m/sec

Water Pressure
a. Perpendicular to Flow -PT =52. K. (Vmax.Sin 20o)2 = #REF! Kg /m2 for Rectagle K = 1.5
b. Parallel to Flow -PL = 52. K. (Vmax.Cos 20 ) =
o 2
#REF! Kg /m 2
for Circular K = 0.66
Ht. of Force above Founding = #VALUE! m
RL of Force = #VALUE! m
Lever Arm
FT = 0.5 PL x AT/1000= #VALUE! T #VALUE! m MLL #VALUE! T.m
FL = 0.5 PT x AL/1000= #VALUE! T MTT #VALUE! T.m
STABILITY ANALYSIS(PIER)
Vertical Forces
Dead Load of Pier
Sl. Description Length Width Area Depth Quantity
No. in m in m in m2 in m in m3
1 Pier Cap Rectangularportion #REF! #REF! #REF! #REF! #REF!

Tappered Portion ### #REF! #VALUE! #REF! #VALUE!


2 Pier Shaft
From Cap bottom to FSL/HFL Rectanular #REF! #REF! #REF! ### #REF!
Semi Circular 0.00 #REF! #REF! ### #REF!
From FSL/HFL to Pier Base Rectangular #REF! #REF! #REF! ### #REF!
Semi Circular 0.00 #REF! #REF! ### #VALUE!
3 Footing Base #REF! #REF! #REF! #REF! #REF!

Sl. Description Quantity HFL Dry


No. in m3 Conditio
Density Weight Conditio
Density Weight
n n

From Top of Pier Cap to HFL/FSL #REF! 2.40 #REF! 2.40 #REF!
From HFL/FSL to Founding Level #REF! 1.40 #REF! 2.40 #REF!

Total Vertical Load (Span dislodged) #REF! #REF!

Dead load of Slab (Reaction) 184.580 184.580


Live Load on Slab (Reaction) 70.570 70.570

Total Vertical Load #REF! #REF!

Area of Footing = ### m2


ZLL = ### m3
ZTT = ### m3

Calculation of Stresses

HFL DRY HFL( SD) DRY (SD)


1 Total Vertical Load #REF! #REF! #REF! #REF!
2 Total Moments MLL(T-m) MTT(T-m) MLL(T-m) MTT(T-m) MLL(T-m) MTT(T-m) MLL(T-m) MTT(T-m)
a. Braking Force #REF! #REF!
b. Eccentricity of LL 13.76 81.51 13.76 81.51 35.99 35.99
c. Wind Force #REF! #REF! #REF! #REF!
d. Water Current ### #VALUE! #VALUE! ###
TOTAL #REF! #REF! #REF! #REF! #VALUE! ### 35.99 0.00

HFL DRY HFL( SD) DRY (SD)


Stress Max Min Max Min Max Min Max Min
P/ A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
MLL / ZLL #REF! #REF! #REF! #REF! #VALUE! ### #VALUE! ###
MTT / ZTT #REF! #REF! #REF! #REF! #VALUE! ### #VALUE! ###
Net Stress (T-m ) 2
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Check for stresses of pier at R.L.52.0m
Vertical Forces
Dead Load of Pier
Sl. Description Length Width Area Depth Quantity
No. in m in m in m2 in m in m3
1 Pier Cap Rectangularportion #REF! #REF! #REF! #REF! #REF!

Tappered portion ### #REF! #VALUE! #REF! #VALUE!


2 Pier Shaft
From Cap bottom to FSL/HFL Rectanular #REF! #REF! #REF! ### #REF!
Semi Circular 0.00 #REF! #REF! ### #REF!
From FSL/HFL to Pier Base Rectangular #REF! #REF! #REF! ### #REF!
Semi Circular 0.00 #REF! #REF! ### #VALUE!

Sl. Description Quantity HFL Dry


No. in m 3 Conditio
Density Weight Conditio
Density Weight
n n

From Top of Pier Cap to HFL/FSL #REF! 2.40 #REF! 2.40 #REF!
From HFL/FSL to Founding Level #REF! 1.40 #REF! 2.40 #REF!

Total Vertical Load (Span dislodged) #REF! #REF!

Dead load of Slab (Reaction) 184.580 184.580


Live Load on Slab (Reaction) 70.570 70.570

Total Vertical Load #REF! #REF!

Area of Footing = ### m2


ZLL = ### m3
ZTT = ### m3

Calculation of Stresses

HFL DRY HFL( SD) DRY (SD)


1 Total Vertical Load #REF! #REF! #REF! #REF!
2 Total Moments MLL(T-m) MTT(T-m) MLL(T-m) MTT(T-m) MLL(T-m) MTT(T-m) MLL(T-m) MTT(T-m)
a. Braking Force #REF! #REF!
b. Eccentricity of LL 13.76 81.51 13.76 81.51 35.99 35.99
c. Wind Force #REF! #REF! #REF! #REF!
d. Water Current ### #VALUE! #VALUE! ###
TOTAL #REF! #REF! #REF! #REF! #VALUE! ### 35.99 0.00
Check for Shaft Thickness

Length of Abutment Shaft at Base


a. Straight portion #VALUE! mm
Maximum Moment MLL = #REF! T.m
MTT = #REF! T.m
Maximum Vertical Load N #REF! T.

Assume following Reinforcments in critical section


Overall depth of Section 0.76 m
Size of Main reinforcement 25 mm
Size of stirrups 12 mm
Cover 50 mm
Hence, Effecive depth of Section de 68.6 cm

Grade of Concrete M25


Permissible Bending Stress of concrete scbc 83.3 Kg/cm2 Ref. Table - 9 of IRC : 21 - 2000
Permissible Tensile Strength of Reinf. sst 2000 Kg/cm2
Modular Ratio m 10.00
k 0.29
j 0.90
Q 11.05 Kg/cm2

Maximum Bending Moment in LL Direction = #REF! T.m


MLL = #REF! Kg.cm
b= #VALUE! cm

Effective depth required = d =


Effective depth provided = d =
d =
√ M
Qb
= #VALUE! cm
68.6 cm #VALUE!

Provision of Main Reinforcements A st = M

At centre
σ st . j. d
Maximum Bending Moment B.M. = #REF! T.m. ( Tension )
Overall depth of Shaft = 76 cm
Overall length of Shaft = Straight = #VALUE! cm
Effective depth = d= 68.6 cm
Effective length = b= #VALUE! cm
sst = 2000 Kg/cm2
Reinforcement Required = Ast = #REF! cm2
Minimum Reinforcement = 0.3% = #VALUE! cm2
No. of Main Reinforcement for #REF! cm2
Using 25 mm F = #REF! Nos.
Let us provide 25 mm F #REF! Nos. on each face

Spacing of each bar in the pier #VALUE! 20.00 cm

Similarly, for the TT face let us Provide 5.97 6.00 Nos on either side
Let us provide 25 mm F 6 Nos. on either side of Semi -Circular faces
Hence, Reinforcement Provided = #REF!
25 mm F #REF! Nos. = #REF! cm2
#REF!

Calculation of Direct Stress


Reinforcement Provided = 25 mm F #REF! Nos.
Asp = #REF! cm2
Effective depth = d= 68.6 cm
Effective length = b= #VALUE! cm

Ac=bxd - Asp #VALUE! cm2


Modular Ratio a= 10
Total Vertical Load N= #REF! T
N
Direct Stress = σ co ,cal = = #REF! Kg/cm2
A +α . A
c sp
Maximum Moment MLL = #REF! T.m
MTT = #REF! T.m
Section Modulus ZLL = #VALUE! cm3
ZTT = #VALUE! cm3
Bending Stress =
LL Direction scc,cal = #REF! Kg/cm2
TT Direction scc,cal = #REF! Kg/cm2
For Grade of Concrete M25
sc 83.3 Kg/cm2
sco 62.5 Kg/cm2

Check as per Cl. 306.5.3 of IRC - 21:2000

(i) sco,cal sc,cal


+ =
sco sc
#REF! #REF!
+ =
62.5 83.3
= #REF! #REF!

(ii) Resultant Tension due to Direct compression and Flexure =

Direct Stress Compression = #REF! Kg/cm2


Flexure - LL Tension = #REF! Kg/cm2
Flexure - TT Tension = #REF! Kg/cm2
Resultant #REF! Kg/cm2

#REF!
Permissible Tensile Stress for M25 Concrete = 6.1 Kg/cm2
Distribution steel
Provide distribution reinforcements @0.12%=0.12/100*760*1000= #VALUE! mm2
Spacing of 12mm distribution reinforcements= 22/7*12*12/4*1000*2/912= 248.12 mm

Provide distribution reinforcements of12 mm dia @200mm C/c both faces


Checking of Section using Cracked Section Analysis (For Pier Shaft)
Data
1. Effective Width of Section B #VALUE! cm
2. Overall Depth of Section D 76.00 cm
3. Vertical Load on Section V #REF! T B
4. Applied Moments MLL #REF! T.m
MTT #REF! T.m
5. No. of Compression Reinforcement ### #REF! mm F L Asc L
Area of Compression Reinforcement Asc #REF! cm2 D Ast
B
6. No. of Tension Reinforcement ### #REF! mm F
Area of Tension Reinforcement Ast #REF! cm2
7. Size of Transverse Reinforcement 12 mm F
8. Grade of Concrete = #REF!
Permissible Bending Stress of concrete scbc #REF! Kg/cm2 Ref. Table - 9 of IRC : 21 - 2000
Permissible flexural Stress of steel sst 2000 Kg/cm2

Assume
1. Cover dc 5.0 cm
2. Modular Ratio m 10 Ref. IRC 21
Hence
1. Effective Cover in Compression side dc #REF! cm
2. Effective Depth of Section de #REF! cm

From the Equation


Qna = ( Bn2/ 2 ) + ( m - 1) Asc ( n - dc ) - m Ast ( de - n )
Qna = #VALUE! n2+ ( #REF! n)+( #REF! )

From the Equation


Ina = ( Bn3/ 3 ) + ( m - 1) Asc ( n - dc )2 + m Ast ( de - n )2 Eqn. 1
Ina = #VALUE! n +( 3
#REF! n )+(
2
#REF! n)+( #REF! )

From the Equation


H = e + n - ( D / 2) where, e = Moment / Vertical Load = #REF! cm
H= n- #REF!

From the Equation Eqn. 2


Ina = Qna x H = #VALUE! n +( 3
#VALUE! n )+(
2
#REF! n)+( #REF! )

Equating Equation No. 1 and Equation No. 2, we get


#VALUE! n3 + ( #VALUE! n2)+( #REF! n)+( #REF! ) = 0
Solving for n,
we get, n= 52.94 cm
Qna = #VALUE! Ina = #VALUE!
Stress in LL Direction
Stress in Concrete = s c = ( V x n ) / Qna = #REF! Kg/cm2
Stress in Steel = s t = [ sc x (de - n ) x m ] / n = #REF! Kg/cm2
Stress in TT Direction
ZTT = (nB2/ 6)+[(m - 1)( Ast + Asc)( B - 2dc)2 / ( 2D )] = #VALUE! cm3
Stress in Concrete = s c = MTT / ZTT = #REF! Kg/cm2
Stress in Steel = s t = [ sc x m ] = #REF! Kg/cm2
Total Stress Check with Premissible Limits
Stress in Concrete = s c = LL + TT = #REF! Kg/cm2 #REF!
Stress in Steel = s t = LL + TT = #REF! Kg/cm2 #REF!
FOOTING DESIGN PIER
Net pressure =
Stress in the end of the heel = #REF! T/m2

Stress near stem on heel side = #REF! T/m2

Stress near stem on Toe side = #REF! T/m2


Stress in the end of the toe = #REF! T/m2

Stress Diagram at the Base

### #REF!

#REF! + #REF! +
#REF! #REF!


Design of Toe Slab MA st = M
d =
Mmax = ### T.m
Qb
σ st . j. d
Smax = ### T

Assume following Reinforcments in Footing


Overall depth of Section #REF! m
Size of Main reinforcement 20 mm
Size of stirrups 12 mm
Cover 75 mm
Hence, Effecive depth of Section de #REF! cm
Tensile stress of Steel sst = 2000 Kg/cm2

Grade of Concrete M25


Permissible Bending Stress of concrete scbc 83.3 Kg/cm2 Ref. Table - 9 of IRC : 21 - 2000
Permissible Tensile Strength of Reinf. sst 2000 Kg/cm2
Modular Ratio m 10
k 0.2940
j 0.9020
Q 11.0462 Kg/cm2

b= 100 cm

Effective depth required = d =

Effective depth provided = d =


=
d =
√ M
Qb #REF! cm
#REF! cm

#REF!
M
Provision of Main Reinforcements A st =
σ st . j. d
Reinforcement Required = Ast = #REF! cm2
Minimum reinforcement required = 0.12%= #REF! cm2
Spacing of reinforcement 20 mm bar

#REF! cm c/c

Provide 20 mm HYSD bar at 20.000 cm c/c


Actual Reinforcement provided 18.850 cm2

Maximum shear stress #REF! Kg/cm2


100xAst = #REF!
bd
so, permissible shear stress = #REF! N/sqmm or = #REF! Kg/cm2
>2.13
Nominal minimum shear reinforcements to be provided

Provide four legged shear reinforcement of 12mm dia at 300mm c/c

Summary
Heel portion

In upper layer 20 30 cm c/c


In lower layer 20 20 cm c/c

Toe portion

In upper layer 20 30 cm c/c


In lower layer 20 20 cm c/c

Provide four legged 12mm stirrup at 300mm c/c


Design of Corbel for HL Bridge over CHIPLIMA NALLAH

0.76

0.9
0.3
0.76

Data for the Short cantilever 1.87

Overall Span = L = 1870.00 mm length of shaft 2.935


Overall Depth = d = 900 mm
Width = b = 760 mm
Shear Span = a = 3738.5325 mm
Effective Cover = 55 mm
Effective Depth = d' = 845 mm
Depth of Bracket = S = 300 mm
28-day strength of conc = fc' = 25 N/mm2
Yield Stress of Steel = fsy = 415 N/mm2

Design:
Shear span 3739
= = 4.424 > 1
Depth 845

So, the design shall be for cantilevers .


Loads on Corbel:

A Dead Load on cantelever


1 DL of Superstructure = #VALUE! T/m
2 DL of Pier cap & Corbel
a. Pier Cap = 1.293 T/m
b. Corbel i) 2.046 T/m
532.5 (refer SD-306,S-3)
Total #VALUE! T/m

B Live Load = 35.285 T From pier shaft 1.140 m

C Wind Load

The load combination due to clause No.212.2 and 212.3, 212.4 and 212.5 given the maximum moment
Moment at bottom of pier cap due to wind load

RL of Top of Road Formation = 100 m


RL of CG of Wind Force = #REF! m
RL of Cap Level = #REF! m

113 of 30
I #REF! x ( #REF! - #REF! ) = #REF! tm
I 3.228 x ( 100.000 + 1.500 - #REF! )= #REF! tm
III 1.184 x ( #REF! - #REF! ) = #REF! tm
#REF! T #REF! tm

Maximum Moment MLL =Mw/3= #REF! tm


MTT =2Mw/3 #REF! tm
Horizontal Force
#REF!
From Wind Moment = = #REF! T
#REF! - #REF!

Braking Force = 10.120 T

Total Horizontal Force = 10.120 + #REF! = #REF! T

Total Horizontal Force /m Span = #REF! / 7.500 = #REF! T/m

Vertical Force

Dead Load on one side= DL = #VALUE! T/m


Live Load on one side = LL = 35.285 T Critical Load Condition on one side
#REF! tm
From Wind Moment = = #REF! T/m
3.738533 m

B.M near pier shaft= #VALUE! T.m


Shear Force= #VALUE! T

B.M at 1.14m from pier shaft= #VALUE! T.m


Shear Force= #VALUE! T

Maximum Moment MLL = #VALUE! T.m


MTT = #REF! T.m
Maximum Vertical Load N #VALUE! T.

#REF! mm f Anchor Bar


Not less than 600.0 mm

5 layers
mm f 5 L/m Framing Bars for caging of Ah Bars
Ah Bars in 12 mm f at #REF! mm c/c
12

Vertical Stirrups in 200 mm Pitch and of size


12 mm f 5 L/m
Reinforcement from PIER

(B. B. Padhy ) (P.K.Mohapatra) (N.K.Pradhan)


Asst. Engineer, D&P Executive Engineer, Designs - I Superintending Engineer, (P&D) Chief Engineer,
DPI & Roads, Orissa

114 of 30
Check for Thickness

Breadth of cantilever
a. Straight portion 760 mm
Maximum Moment MLL = #VALUE! T.m
MTT = #REF! T.m
Maximum Vertical Load N #VALUE! T.

Assume following Reinforcments in critical section


Overall depth of Section 1.20 m
Size of Main reinforcement 25 mm
Size of stirrups 12 mm
Cover 50 mm
Hence, Effecive depth of Section de 112.6 cm

Grade of Concrete M25


Permissible Bending Stress of concrete scbc 83.3 Kg/cm2 Ref. Table - 9 of IRC : 21 - 2000
Permissible Tensile Strength of Reinf. sst 2000 Kg/cm2
Modular Ratio m 10.00
k 0.29
j 0.90
Q 11.05 Kg/cm2

Maximum Bending Moment in LL Direction = #VALUE! T.m


MLL = #VALUE! Kg.cm
b= 76 cm

Effective depth required = d =


Effective depth provided = d =
d =
√ M
Qb
= #VALUE! cm
112.6 cm #VALUE!

Provision of Main Reinforcements A st = M

At centre
σ st . j. d
Maximum Bending Moment B.M. = #VALUE! T.m. ( Compression )
Overall depth of Shaft = 120 cm
Overall length of Shaft = Straight = 76 cm
Effective depth = d= 112.6 cm
Effective length = b= 76.0 cm
sst = 2000 Kg/cm2
Reinforcement Required = Ast = #VALUE! cm2
Minimum Reinforcement = 0.3% = 25.673 cm2
No. of Main Reinforcement for #VALUE! cm2
Using 25 mm F = #VALUE! Nos.
Let us provide 25 mm F #VALUE! Nos. on pier cap top
Provide 25 mm F #VALUE! no on pier cap bottom

Spacing of each bar in the LL face #VALUE! 7.00 cm


on the earth side shall be

Spacing of bar on the river side 14.00 cm

Similarly, for the TT face let us Provide 8.57 9.00 Nos on either side
Let us provide 25 mm F 9 Nos. on either side of Semi -Circular faces
Hence, Reinforcement Provided = #VALUE!
25 mm F #VALUE! Nos. = #VALUE! cm2
#VALUE!

Calculation of Direct Stress


Reinforcement Provided = 25 mm F #VALUE! Nos.
Asp = #VALUE! cm2

Ac=bxd - Asp #VALUE! cm2


Modular Ratio a= 10
Total Vertical Load N= #VALUE! T
N
Direct Stress = σ co ,cal = = #VALUE! Kg/cm2
A +α . A
c sp
Maximum Moment MLL = #VALUE! T.m
MTT = #REF! T.m
Section Modulus ZLL = 160597.62667 cm3
ZTT = 108396.26667 cm3
Bending Stress =
LL Direction scc,cal = #VALUE! Kg/cm2
TT Direction scc,cal = #REF! Kg/cm2
For Grade of Concrete M25
sc 83.3 Kg/cm2
sco 62.5 Kg/cm2

Check as per Cl. 306.5.3 of IRC - 21:2000

(i) sco,cal sc,cal


+ =
sco sc
#VALUE! #REF!
+ =
62.5 83.3
= #VALUE! #VALUE!

(ii) Resultant Tension due to Direct compression and Flexure =

Direct Stress Compression = #VALUE! Kg/cm2


Flexure - LL Tension = #VALUE! Kg/cm2
Flexure - TT Tension = #REF! Kg/cm2
Resultant #VALUE! Kg/cm2

#VALUE!
Permissible Tensile Stress for M25 Concrete = 6.1 Kg/cm2
Shear reinforcements
Shear force= #VALUE! T
Shear stress= #VALUE! N/mm2
As/(b*d)x100= #VALUE! %

permissible shear stress in concrete= 0.5 N/mm2 <1.07


shear force to be registed by shear reinforcements= #VALUE! N
Provide 12mm dia 10 legged stirrups at #VALUE! mm say 100 mm c/c

Effective depth = d= 112.6 cm


Effective length = b= 76 cm
Checking of Section using Cracked Section Analysis (For pier cap cantilever)
Data
1. Effective Width of Section B 760 cm
2. Overall Depth of Section D 120.0 cm
3. Vertical Load on Section V #VALUE! T B
4. Applied Moments MLL #VALUE! T.m
MTT #REF! T.m
5. No. of Compression Reinforcement ### #REF! mm F L Asc L
Area of Compression Reinforcement Asc #REF! cm2 D Ast
B
6. No. of Tension Reinforcement ### #REF! mm F
Area of Tension Reinforcement Ast #REF! cm2
7. Size of Transverse Reinforcement 12 mm F
8. Grade of Concrete = #REF!
Permissible Bending Stress of concrete scbc #REF! Kg/cm2 Ref. Table - 9 of IRC : 21 - 2000
Permissible flexural Stress of steel sst 2000 Kg/cm2

Assume
1. Cover dc 5.0 cm
2. Modular Ratio m 10 Ref. IRC 21
Hence
1. Effective Cover in Compression side dc #REF! cm
2. Effective Depth of Section de #REF! cm

From the Equation


Qna = ( Bn2/ 2 ) + ( m - 1) Asc ( n - dc ) - m Ast ( de - n )
Qna = 380.000 n2+ ( #REF! n)+( #REF! )

From the Equation


Ina = ( Bn3/ 3 ) + ( m - 1) Asc ( n - dc )2 + m Ast ( de - n )2 Eqn. 1
Ina = 253.333 n +( 3
#REF! n )+(
2
#REF! n)+( #REF! )

From the Equation


H = e + n - ( D / 2) where, e = Moment / Vertical Load = ### cm
H= n- #VALUE!

From the Equation Eqn. 2


Ina = Qna x H = 380.000 n +( 3
#VALUE! n )+(
2
#REF! n)+( #REF! )

Equating Equation No. 1 and Equation No. 2, we get


126.667 n3 + ( #VALUE! n2)+( #REF! n)+( #REF! ) = 0
Solving for n,
we get, n= 19.45 cm
Qna = #REF! Ina = #REF!
Stress in LL Direction
Stress in Concrete = s c = ( V x n ) / Qna = #VALUE! Kg/cm2
Stress in Steel = s t = [ sc x (de - n ) x m ] / n = #REF! Kg/cm2
Stress in TT Direction
ZTT = (nB2/ 6)+[(m - 1)( Ast + Asc)( B - 2dc)2 / ( 2D )] = #REF! cm3
Stress in Concrete = s c = MTT / ZTT = #REF! Kg/cm2
Stress in Steel = s t = [ sc x m ] = #REF! Kg/cm2
Total Stress Check with Premissible Limits
Stress in Concrete = s c = LL + TT = #VALUE! Kg/cm2 #VALUE!
Stress in Steel = s t = LL + TT = #REF! Kg/cm2 #REF!