You are on page 1of 47

Doc No : CC-2022-DR-030

CALCULUS RCC UG TANK PROJECT


CONSULTANTS
DESIGN REPORT FOR RCC UNDER GROUND TANK AT Rev 0
MUZAFFARPUR AT BIHAR

DESIGN REPORT – PROPOSED RCC UNDER GROUND TANK PROJECT


-MUZAFFARPUR-BIHAR

PROJECT DESIGN REPORT FOR PROPOSED RCC UNDER GROUND TANK-


MUZAFFARPUR-BIHAR.

CLIENT M/s

CONSULTANT M/s CALCULUS CONSULTANTS

REVISION STATUS SHEET: CC-2022-DR-030

0 10/12/2022 R0 AS AS SK

PREPARED
REV NO. DATE DESCRIPTION REVIEWED APPROVED
BY
BY BY

Page 1of 47
Doc No : CC-2022-DR-030
CALCULUS RCC UG TANK PROJECT
CONSULTANTS
DESIGN REPORT FOR RCC UNDER GROUND TANK AT Rev 0
MUZAFFARPUR AT BIHAR

TABLE OF CONTENTS

S.NO INDEX
1 INTRODUCTION
2 LOADS & MATERIAL CONSIDERATION
2.1 LOADS &MATERIAL CONSIDERATION
2.1.1 Dead Load
2.1.2 Fluid Load
2.1.3 Soil Load
2.1.4 Vehicle Load
2.2 LOAD COMBINATIONS
2.3MATERIALS
2.3.1 Reinforcement steel
2.3.2 Concrete Grade
2.4 SOIL REPORT
3 DESIGN PHILOSOPHY
4 MODEL DESCRIPTION
4.1 LOAD APPLICATION
4.1.1 Dead Load
4.1.2 Fluid Load
4.1.3 Soil Load
4.1.4 Vehicle Load
5 ANALYSIS RESULTS
6 DESIGN RESULTS
7 CONCLUSION
APPENDIX-1

Page 2of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

1. INTRODUCTION

The Under Ground tank structure comprises of RC Base slab, Walls, Cover slabs. The scope of this
report is restricted to structural design of the members constituting the aforementioned structures.

The Dimension of the tank is mentioned below.

Clear Length of the Tank -6m


Clear Width of the tank - 2.5 m
Clear height of the tank - 2.1 m
Free Board Considered - 0.3 m

This Report contains Design of three Major parts,

1. RCC wall,
2. RCC Base Slab
3. RCC Cover Slab

2. LOADS& MATERIAL CONSIDERATION

2.1 LOAD CONSIDERATION


2.1.1 DEAD LOAD

1. Self weight of the material


Dead load includes weight of all structural and architectural components. Self-weight of the materials is
calculated on the basis of unit weights as specified IS: 875 Part-I: 1987.

1. Unit weight of Plain concrete : 24.0 kN/Cum


2. Unit weight of Reinforced concrete : 25.0 kN/Cum
3. Unit weight of Brick masonry : 20.0 kN/Cum
4. Unit weight of Steel : 78.5 kN/Cum
5. Floor finish : 2.50 kN/Sqm
6. Density of soil : 18.0 kN/m3
7. Density of water : 10.0 kN/m3
8. Landscape load, if any : as per architectural detail

2.1.2 FLUID LOAD (WATER)

Fluid Loads are considered while designing the structural elements apart from the dead loads
The RC wall and Base slab were subjected to fluid load .
Unit Weight of water : 10 kN/ Cum

Page 3of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

2.1.3 SOIL LOAD

Fluid Loads are considered while designing the structural elements apart from the dead loads .The RC wall and Base
slab were subjected to soil load .
Unit Weight of soil : 18 kN/ Cum

2.1.4 VEHICLE LOAD

Vehicle Loads are considered while designing the structural elements apart from the dead loads .The RC Cover Slab
subjected to vehicle load
Vehicle Load : 10 kN/ Sqm

2.2 LOAD COMBINATIONS

IS875: PART 5 LSD COMBINATIONS-STRENGTH COMBINATION


(FOR UG TANK)
LOAD COMB 101 [1.50 DL+1.50 VEHICLE LOAD]
LOAD COMB 102 [1.50 DL +1.50 VEHICLE LAOD+ 1.50 WATER]
LOAD COMB 103 [1.50 DL +1.50 VEHICLE LOAD+ 1.50 SOIL]

IS875:PART 5 LSD COMBINATIONS-SERVICEABILITY COMBINATION


(FOR UG TANK )
LOAD COMB 201 [1.0 DL+1.0 VEHICLE LOAD]
LOAD COMB 202 [1.0 DL +1.0 VEHICLE LAOD+ 1.0 WATER]
LOAD COMB 203 [1.0 DL +1.0 VEHICLE LOAD+ 1.0 SOIL]

2.3 MATERIALS
Materials specified will conform to latest edition of relevant Indian standard or other accepted standard.
Detailed material specifications will be included in the Technical Specifications.

2.3.1 REINFORCEMENT STEEL

All reinforcement steel shall confirm to IS: 1786: 2008 having minimum yield strength of 500 N/sqmm
and having elongation more than 14.5%
2.3.2 CONCRETE
All the cube test shall be confirmed to IS 456: 2000 and IS 516-1959 and Design mix to achieve the specified
grade of concrete shall be as per SP 23:1982.
M30 grade is used for liquid retaining structure (RC wall, Base Slab, Cover Slab)

Page 4of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

2.4 SOIL REPORT

The brief of soil Parameter based on the “Soil Investigation Report” submitted by M/s GLOBAL TESTING
AND RESEARCH LAB0RATORY, Patna is as follows: The Soil report for the building recommends the
Isolated footing at the depth of 3m below N.G.L with Recommended safe bearing capacity of 5.2
Tonnes/Sqm. Allowable load is suitably increased as per IS 1904-1986 for combination with Wind Load and
as per IS 1893 (Part 1)-2016 for combination with Seismic load.

SBC at 2.4m depth from NGL = 5Tonnes/sqm (Assumed)


Subgrade modulus = (SBC/Allowable Deflection) x F.O.S
= (50/0.025)x2.5
= 5000 kN/m2/m

FIGURE- 1: Subgrade Modulus input of a UG tank (Staad)

Page 5of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

3. DESIGN PHILOSOPHY

All water retaining structures will be designed as per IS 3370 (Part 1 and Part 2) – 2009 and IS 3370 (Part 3
and Part 4) – 1967. Limitation of deflection of structural members would be checked as per as per relevant
clauses in IS codes mentioned in section 11, for most unfavorable load combinations.

Page 6of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

4. MODEL DESCRIPTION
4.1 LOAD APPLICATION
The structure was created using FEA software (STAAD).The plan views and the 2-D views of the
structures are listed below:

FIGURE- 2: Elevation of a UG tank

FIGURE- 3: 3D view of a UG tank

Page 7of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE- 4: Plan view of UG Tank

FIGURE- 5: Rendering view of a UG Tank

Page 8of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

4.1 LOAD APPLICATION


4.1.1 DEAD LOAD

Dead load includes weight of all structural and architectural components. Self-weight of the
materials is calculated on the basis of structure.

FIGURE- 6: Dead load applied in the UG Tank

FIGURE- 7: Floor Finish load (Dead load) applied in the UG Tank

Page 9of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

4.1.2 FLUID LOAD (WATER)

Fluid Loads are considered while designing the structural elements apart from the dead loads The RC wall and
Base slab were subjected to fluid load.
Unit Weight of water : 10 kN/ Cum
The Load calculation is shown below:
Load on base slab
Fluid Load on Base Slab (Assuming Tank Overflow condition)
Tank Height : 2.4m
Pressure on baseslab : Tank Height considered x unit wt of water
: 24 kN/m2

Fig8:-Fluid load applied in the UG Tank

Load on Sidewalls
Fluid Load on Sidewall (Assuming Tank Overflow condition)
The Hydrostatic pressure applied in the side walls as trapezoidal load
Tank Height : 2.4m
Pressure on sidewall : Tank Height considered x unit wt of water
: 24 kN/m2 (at bottom) to 0 (at top)

Page 10of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

Fig9:-Fluid load applied in the UG Tank

4.1.3 SOIL LOAD

Soil Loads are considered while designing the structural elements apart from the dead loads The RC wall and
were subjected to Soil load.
Unit Weight of Soil (ϒ) : 18 kN/ Cum
The Load calculation is shown below:
Load on Sidewalls
Soil Load on Sidewall
The Soil pressure applied in the side walls as trapezoidal load
Tank Height : 2.4m

Soil Angle of Repose ø : 30

Ka : (1-sin ø)/ (1+sin ø)


: 0.333
Pressure on sidewall : 0.5x Ka x ϒ x H
: 7.12 kN/m2

Page 11of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

Fig10:-Soil load applied in the UG Tank


4.1.4 VEHICLE LOAD

Vehicle Loads are considered while designing the structural elements apart from the dead loads .The RC Cover
Slab subjected to vehicle load
Vehicle Load : 10 kN/ Sqm

Fig11:-Vehicle load applied in the UG Tank

Page 12of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

5. ANALYSIS RESULTS

FIGURE-12: Base Pressure results of UG tank

Base pressure = 0.046 N/mm2


SBC =0.05 N/mm2 > Base Pressure
Hence Safe

FIGURE-13: Uplift check results of UG tank

Result:-No upliftment

Page 13of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-14: Shear check results of UG Tank base slab (Xdirection)

Project:Under ground tank,Muzaffarpur


Check for Shear (Base Slab)
SQX (Ꚍvx) 0.124 N/mm2(From Staad)
Depth Overall (D) 250 mm
Effective depth (d) 200 mm
% Ast (Provided) 0.43
Grade of concrete M30
Design Shear Strength of concrete (Ꚍc ) 0.438 N/mm2 (Table 19:IS456-2000)
Ꚍc Max 3.5 N/mm2 (Table 20:IS456-2000)
Check for Ꚍv < Ꚍc < Ꚍc max Hence Safe

Page 14of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-15: Shear check results of UG Tank base slab(Y Direction)

Project:Under ground tank,Muzaffarpur


Check for Shear (Base Slab)
SQY (Ꚍvy) 0.127 N/mm2(From Staad)
Depth Overall (D) 250 mm
Effective depth (d) 200 mm
% Ast (Provided) 0.264
Grade of concrete M30
Design Shear Strength of concrete (Ꚍc ) 0.375 N/mm2 (Table 19:IS456-2000)
Ꚍc Max 3.5 N/mm2 (Table 20:IS456-2000)
Check for Ꚍv < Ꚍc < Ꚍc max Hence Safe

Page 15of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-16: Inplane Moment results of UG Tank base slab(Mx)

FIGURE-17: Inplane Moment results of UG Tank base slab(My)

Page 16of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-18: Inplane Moment results of UG Tank base slab(Mxy)

FIGURE-19: Inplane Moment results of UG Tank Long wall(Mx)

Page 17of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-20: Inplane Moment results of UG Tank Long wall(My)

FIGURE-21: Inplane Moment results of UG Tank Long wall(Mxy)

Page 18of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-22: Inplane Moment results of UG Tank Short wall(Mx)

FIGURE-23: Inplane Moment results of UG Tank Short wall(My)

Page 19of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-24: Inplane Moment results of UG Tank Short wall(Mxy)

FIGURE-25: Shear check results of UG Tank base slab (X direction)

Project:Under ground tank,Muzaffarpur


Check for Shear (RC Wall)
SQX (Ꚍvx) 0.131 N/mm2(From Staad)
Depth Overall (D) 200 mm
Effective depth (d) 150 mm
% Ast (Provided) 0.35
Grade of concrete M30
Design Shear Strength of concrete (Ꚍc ) 0.408 N/mm2 (Table 19:IS456-2000)
Ꚍc Max 3.5 N/mm2 (Table 20:IS456-2000)
Check for Ꚍv < Ꚍc < Ꚍc max Hence Safe

Page 20of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

FIGURE-26: Shear check results of UG Tank base slab (Y direction)

Project:Under ground tank,Muzaffarpur


Check for Shear (RC Wall)
SQY (Ꚍvy) 0.13 N/mm2(From Staad)
Depth Overall (D) 200 mm
Effective depth (d) 150 mm
% Ast (Provided) 0.576
Grade of concrete M30
Design Shear Strength of concrete (Ꚍc ) 0.492 N/mm2 (Table 19:IS456-2000)
Ꚍc Max 3.5 N/mm2 (Table 20:IS456-2000)
Check for Ꚍv < Ꚍc < Ꚍc max Hence Safe

Page 21of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

6. DESIGN RESULTS

DESIGN OF BASE SLAB:-


ANALYSIS RESULTS
Mx = 4.1 KN-M/M
My = 11 KN-M/M
Mxy = 4 KN-M/M
MATERIAL PROPERTIES
GRADE OF CONCRETE(Fck) = 30 N/mm2
DIA OF BAR = 10 mm
CLEAR COVER = 50 mm
GRADE OF STEEL REINFORCEMENT(Fy) = 500 N/mm2
(As per IS-3370 Part 2:2009 Clause 4.4.3.1 Crack width for reinforced concrete members in direct tension
and Flexural tension may be deemed to be satisfactory If steel stress under service condtion does not
130 N/mm2 for High Strength deformed bars )
Hence,
Fy = 130 N/mm2
OVERALL DEPTH(D) = 250 mm

DESIGN MOMENTS FOR AST


CALCULATION
Mx+Mxy = 8.10 KN-M/M
MY+Mxy = 15.0 KN-M/M
EFFECTIVE DEPTH CALCULATION
d = 195 mm
AST CALCULATION ALONG X DIRECTION
DESIGN MOMENT:-
(Mx+Mxy) = 8.10 KN-M/M
AST = {1-√1-[(M des x 4.598)/Fck x b x d²]} x [Fck x B x d / 2 x Fy]
AST = 370.3 mm2/m Required
AST = 438 mm2/m Minimum.Ast (0.35%)
Req 10 Mm Bar at 212 mm center to center(Design Ast)
Req 10 mm Bar at 200 mm center to center(Min ASt)
AST CALCULATION ALONG Y DIRECTION
DESIGN MOMENT:-
(MY+Mxy) = 10.82 KN-M/M
AST = {1-√1-[(M des x 4.598)/Fck x b x d²]} x [Fck x B x d / 2 x Fy]
AST = 673.37 mm2/m Required
AST = 438 mm2/m Minimum.Ast (0.35%)
Req 10 mm Bar at 114 mm center to center(Design Ast)
Req 10 mm Bar at 200 mm center to center(Min ASt)

Page 22of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

DESIGN OF WALL:-
ANALYSIS RESULTS
Mx = 5.13 KN-M/M
My = 8.12 KN-M/M
Mxy = 2.8 KN-M/M
MATERIAL PROPERTIES
GRADE OF CONCRETE(Fck) = 30 N/mm2
DIA OF BAR = 10 mm
CLEAR COVER = 50 mm
GRADE OF STEEL REINFORCEMENT(Fy) = 500 N/mm2
(As per IS-3370 Part 2:2009 Clause 4.4.3.1 Crack width for reinforced concrete members in direct tension
and Flexural tension may be deemed to be satisfactory If steel stress under service condtion does not
130 N/mm2 for High Strength deformed bars )
Hence,
Fy = 130 N/mm2
OVERALL DEPTH(D) = 200 mm

DESIGN MOMENTS FOR AST


CALCULATION
Mx+Mxy = 7.93 KN-M/M
MY+Mxy = 10.92 KN-M/M
EFFECTIVE DEPTH CALCULATION
d = 145 mm
AST CALCULATION ALONG X DIRECTION
DESIGN MOMENT:-
(Mx+Mxy) = 7.93 KN-M/M
AST = {1-√1-[(M des x 4.598)/Fck x b x d²]} x [Fck x B x d / 2 x Fy]
AST = 490.8 mm2/m Required
AST = 350 mm2/m Minimum.Ast (0.35%)
Req 10 Mm Bar at 160 mm center to center(Design Ast)
Req 10 mm Bar at 333 mm center to center(Min ASt)
AST CALCULATION ALONG Y DIRECTION
DESIGN MOMENT:-
(MY+Mxy) = 10.92 KN-M/M
AST = {1-√1-[(M des x 4.598)/Fck x b x d²]} x [Fck x B x d / 2 x Fy]
AST = 679.7 mm2/m Required
AST = 350 mm2/m Minimum.Ast (0.35%)
Req 10 mm Bar at 115 mm center to center(Design Ast)
Req 10 mm Bar at 333 mm center to center(Min Ast)

Page 23of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

7. CONCLUSION
From the Analysis and Design results, it can be found that the RCC Under ground tank satisfies the
codal requirements.

Page 24of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

APPENDIX-1

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 18-Sep-19
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 6.2 0 0; 3 0 0 2.7; 4 6.2 0 2.7; 5 0 0 -0.3; 6 6.2 0 -0.3; 7 0 0 3;
8 6.2 0 3; 9 6.5 0 0; 10 6.5 0 2.7; 11 6.5 0 -0.3; 12 6.5 0 3; 13 -0.3 0 0;
14 -0.3 0 2.7; 15 -0.3 0 -0.3; 16 -0.3 0 3; 17 0 2.4 0; 18 6.2 2.4 0;
19 0 2.4 2.7; 20 6.2 2.4 2.7; 21 0.31 0 0; 22 0.31 0 0.54; 23 0 0 0.54;
24 0.62 0 0; 25 0.62 0 0.54; 26 0.93 0 0; 27 0.93 0 0.54; 28 1.24 0 0;
29 1.24 0 0.54; 30 1.55 0 0; 31 1.55 0 0.54; 32 1.86 0 0; 33 1.86 0 0.54;
34 2.17 0 0; 35 2.17 0 0.54; 36 2.48 0 0; 37 2.48 0 0.54; 38 2.79 0 0;
39 2.79 0 0.54; 40 3.1 0 0; 41 3.1 0 0.54; 42 3.41 0 0; 43 3.41 0 0.54;
44 3.72 0 0; 45 3.72 0 0.54; 46 4.03 0 0; 47 4.03 0 0.54; 48 4.34 0 0;
49 4.34 0 0.54; 50 4.65 0 0; 51 4.65 0 0.54; 52 4.96 0 0; 53 4.96 0 0.54;
54 5.27 0 0; 55 5.27 0 0.54; 56 5.58 0 0; 57 5.58 0 0.54; 58 5.89 0 0;
59 5.89 0 0.54; 60 6.2 0 0.54; 61 0.31 0 1.08; 62 0 0 1.08; 63 0.62 0 1.08;
64 0.93 0 1.08; 65 1.24 0 1.08; 66 1.55 0 1.08; 67 1.86 0 1.08; 68 2.17 0 1.08;
69 2.48 0 1.08; 70 2.79 0 1.08; 71 3.1 0 1.08; 72 3.41 0 1.08; 73 3.72 0 1.08;
74 4.03 0 1.08; 75 4.34 0 1.08; 76 4.65 0 1.08; 77 4.96 0 1.08; 78 5.27 0 1.08;
79 5.58 0 1.08; 80 5.89 0 1.08; 81 6.2 0 1.08; 82 0.31 0 1.62; 83 0 0 1.62;
84 0.62 0 1.62; 85 0.93 0 1.62; 86 1.24 0 1.62; 87 1.55 0 1.62; 88 1.86 0 1.62;
89 2.17 0 1.62; 90 2.48 0 1.62; 91 2.79 0 1.62; 92 3.1 0 1.62; 93 3.41 0 1.62;
94 3.72 0 1.62; 95 4.03 0 1.62; 96 4.34 0 1.62; 97 4.65 0 1.62; 98 4.96 0 1.62;
99 5.27 0 1.62; 100 5.58 0 1.62; 101 5.89 0 1.62; 102 6.2 0 1.62;
103 0.31 0 2.16; 104 0 0 2.16; 105 0.62 0 2.16; 106 0.93 0 2.16;
107 1.24 0 2.16; 108 1.55 0 2.16; 109 1.86 0 2.16; 110 2.17 0 2.16;
111 2.48 0 2.16; 112 2.79 0 2.16; 113 3.1 0 2.16; 114 3.41 0 2.16;
115 3.72 0 2.16; 116 4.03 0 2.16; 117 4.34 0 2.16; 118 4.65 0 2.16;
119 4.96 0 2.16; 120 5.27 0 2.16; 121 5.58 0 2.16; 122 5.89 0 2.16;
123 6.2 0 2.16; 124 0.31 0 2.7; 125 0.62 0 2.7; 126 0.93 0 2.7; 127 1.24 0 2.7;
128 1.55 0 2.7; 129 1.86 0 2.7; 130 2.17 0 2.7; 131 2.48 0 2.7; 132 2.79 0 2.7;
133 3.1 0 2.7; 134 3.41 0 2.7; 135 3.72 0 2.7; 136 4.03 0 2.7; 137 4.34 0 2.7;
138 4.65 0 2.7; 139 4.96 0 2.7; 140 5.27 0 2.7; 141 5.58 0 2.7; 142 5.89 0 2.7;

Page 25of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

143 0.31 2.4 0; 144 0.31 2.4 0.54; 145 0 2.4 0.54; 146 0.62 2.4 0;
147 0.62 2.4 0.54; 148 0.93 2.4 0; 149 0.93 2.4 0.54; 150 1.24 2.4 0;
151 1.24 2.4 0.54; 152 1.55 2.4 0; 153 1.55 2.4 0.54; 154 1.86 2.4 0;
155 1.86 2.4 0.54; 156 2.17 2.4 0; 157 2.17 2.4 0.54; 158 2.48 2.4 0;
159 2.48 2.4 0.54; 160 2.79 2.4 0; 161 2.79 2.4 0.54; 162 3.1 2.4 0;
163 3.1 2.4 0.54; 164 3.41 2.4 0; 165 3.41 2.4 0.54; 166 3.72 2.4 0;
167 3.72 2.4 0.54; 168 4.03 2.4 0; 169 4.03 2.4 0.54; 170 4.34 2.4 0;
171 4.34 2.4 0.54; 172 4.65 2.4 0; 173 4.65 2.4 0.54; 174 4.96 2.4 0;
175 4.96 2.4 0.54; 176 5.27 2.4 0; 177 5.27 2.4 0.54; 178 5.58 2.4 0;
179 5.58 2.4 0.54; 180 5.89 2.4 0; 181 5.89 2.4 0.54; 182 6.2 2.4 0.54;
183 0.31 2.4 1.08; 184 0 2.4 1.08; 185 0.62 2.4 1.08; 186 0.93 2.4 1.08;
187 1.24 2.4 1.08; 188 1.55 2.4 1.08; 189 1.86 2.4 1.08; 190 2.17 2.4 1.08;
191 2.48 2.4 1.08; 192 2.79 2.4 1.08; 193 3.1 2.4 1.08; 194 3.41 2.4 1.08;
195 3.72 2.4 1.08; 196 4.03 2.4 1.08; 197 4.34 2.4 1.08; 198 4.65 2.4 1.08;
199 4.96 2.4 1.08; 200 5.27 2.4 1.08; 201 5.58 2.4 1.08; 202 5.89 2.4 1.08;
203 6.2 2.4 1.08; 204 0.31 2.4 1.62; 205 0 2.4 1.62; 206 0.62 2.4 1.62;
207 0.93 2.4 1.62; 208 1.24 2.4 1.62; 209 1.55 2.4 1.62; 210 1.86 2.4 1.62;
211 2.17 2.4 1.62; 212 2.48 2.4 1.62; 213 2.79 2.4 1.62; 214 3.1 2.4 1.62;
215 3.41 2.4 1.62; 216 3.72 2.4 1.62; 217 4.03 2.4 1.62; 218 4.34 2.4 1.62;
219 4.65 2.4 1.62; 220 4.96 2.4 1.62; 221 5.27 2.4 1.62; 222 5.58 2.4 1.62;
223 5.89 2.4 1.62; 224 6.2 2.4 1.62; 225 0.31 2.4 2.16; 226 0 2.4 2.16;
227 0.62 2.4 2.16; 228 0.93 2.4 2.16; 229 1.24 2.4 2.16; 230 1.55 2.4 2.16;
231 1.86 2.4 2.16; 232 2.17 2.4 2.16; 233 2.48 2.4 2.16; 234 2.79 2.4 2.16;
235 3.1 2.4 2.16; 236 3.41 2.4 2.16; 237 3.72 2.4 2.16; 238 4.03 2.4 2.16;
239 4.34 2.4 2.16; 240 4.65 2.4 2.16; 241 4.96 2.4 2.16; 242 5.27 2.4 2.16;
243 5.58 2.4 2.16; 244 5.89 2.4 2.16; 245 6.2 2.4 2.16; 246 0.31 2.4 2.7;
247 0.62 2.4 2.7; 248 0.93 2.4 2.7; 249 1.24 2.4 2.7; 250 1.55 2.4 2.7;
251 1.86 2.4 2.7; 252 2.17 2.4 2.7; 253 2.48 2.4 2.7; 254 2.79 2.4 2.7;
255 3.1 2.4 2.7; 256 3.41 2.4 2.7; 257 3.72 2.4 2.7; 258 4.03 2.4 2.7;
259 4.34 2.4 2.7; 260 4.65 2.4 2.7; 261 4.96 2.4 2.7; 262 5.27 2.4 2.7;
263 5.58 2.4 2.7; 264 5.89 2.4 2.7; 265 0.31 0 -0.3; 266 0.62 0 -0.3;
267 0.93 0 -0.3; 268 1.24 0 -0.3; 269 1.55 0 -0.3; 270 1.86 0 -0.3;
271 2.17 0 -0.3; 272 2.48 0 -0.3; 273 2.79 0 -0.3; 274 3.1 0 -0.3;
275 3.41 0 -0.3; 276 3.72 0 -0.3; 277 4.03 0 -0.3; 278 4.34 0 -0.3;
279 4.65 0 -0.3; 280 4.96 0 -0.3; 281 5.27 0 -0.3; 282 5.58 0 -0.3;
283 5.89 0 -0.3; 284 0.31 0 3; 285 0.62 0 3; 286 0.93 0 3; 287 1.24 0 3;
288 1.55 0 3; 289 1.86 0 3; 290 2.17 0 3; 291 2.48 0 3; 292 2.79 0 3;
293 3.1 0 3; 294 3.41 0 3; 295 3.72 0 3; 296 4.03 0 3; 297 4.34 0 3;
Page 26of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

298 4.65 0 3; 299 4.96 0 3; 300 5.27 0 3; 301 5.58 0 3; 302 5.89 0 3;
303 0 1.92 0.54; 304 0 1.92 0; 305 0 1.92 1.08; 306 0 1.92 1.62;
307 0 1.92 2.16; 308 0 1.92 2.7; 309 0 1.44 0.54; 310 0 1.44 0;
311 0 1.44 1.08; 312 0 1.44 1.62; 313 0 1.44 2.16; 314 0 1.44 2.7;
315 0 0.96 0.54; 316 0 0.96 0; 317 0 0.96 1.08; 318 0 0.96 1.62;
319 0 0.96 2.16; 320 0 0.96 2.7; 321 0 0.48 0.54; 322 0 0.48 0;
323 0 0.48 1.08; 324 0 0.48 1.62; 325 0 0.48 2.16; 326 0 0.48 2.7;
327 6.2 1.92 0.54; 328 6.2 1.92 0; 329 6.2 1.92 1.08; 330 6.2 1.92 1.62;
331 6.2 1.92 2.16; 332 6.2 1.92 2.7; 333 6.2 1.44 0.54; 334 6.2 1.44 0;
335 6.2 1.44 1.08; 336 6.2 1.44 1.62; 337 6.2 1.44 2.16; 338 6.2 1.44 2.7;
339 6.2 0.96 0.54; 340 6.2 0.96 0; 341 6.2 0.96 1.08; 342 6.2 0.96 1.62;
343 6.2 0.96 2.16; 344 6.2 0.96 2.7; 345 6.2 0.48 0.54; 346 6.2 0.48 0;
347 6.2 0.48 1.08; 348 6.2 0.48 1.62; 349 6.2 0.48 2.16; 350 6.2 0.48 2.7;
351 0.31 1.92 2.7; 352 0.62 1.92 2.7; 353 0.93 1.92 2.7; 354 1.24 1.92 2.7;
355 1.55 1.92 2.7; 356 1.86 1.92 2.7; 357 2.17 1.92 2.7; 358 2.48 1.92 2.7;
359 2.79 1.92 2.7; 360 3.1 1.92 2.7; 361 3.41 1.92 2.7; 362 3.72 1.92 2.7;
363 4.03 1.92 2.7; 364 4.34 1.92 2.7; 365 4.65 1.92 2.7; 366 4.96 1.92 2.7;
367 5.27 1.92 2.7; 368 5.58 1.92 2.7; 369 5.89 1.92 2.7; 370 0.31 1.44 2.7;
371 0.62 1.44 2.7; 372 0.93 1.44 2.7; 373 1.24 1.44 2.7; 374 1.55 1.44 2.7;
375 1.86 1.44 2.7; 376 2.17 1.44 2.7; 377 2.48 1.44 2.7; 378 2.79 1.44 2.7;
379 3.1 1.44 2.7; 380 3.41 1.44 2.7; 381 3.72 1.44 2.7; 382 4.03 1.44 2.7;
383 4.34 1.44 2.7; 384 4.65 1.44 2.7; 385 4.96 1.44 2.7; 386 5.27 1.44 2.7;
387 5.58 1.44 2.7; 388 5.89 1.44 2.7; 389 0.31 0.96 2.7; 390 0.62 0.96 2.7;
391 0.93 0.96 2.7; 392 1.24 0.96 2.7; 393 1.55 0.96 2.7; 394 1.86 0.96 2.7;
395 2.17 0.96 2.7; 396 2.48 0.96 2.7; 397 2.79 0.96 2.7; 398 3.1 0.96 2.7;
399 3.41 0.96 2.7; 400 3.72 0.96 2.7; 401 4.03 0.96 2.7; 402 4.34 0.96 2.7;
403 4.65 0.96 2.7; 404 4.96 0.96 2.7; 405 5.27 0.96 2.7; 406 5.58 0.96 2.7;
407 5.89 0.96 2.7; 408 0.31 0.48 2.7; 409 0.62 0.48 2.7; 410 0.93 0.48 2.7;
411 1.24 0.48 2.7; 412 1.55 0.48 2.7; 413 1.86 0.48 2.7; 414 2.17 0.48 2.7;
415 2.48 0.48 2.7; 416 2.79 0.48 2.7; 417 3.1 0.48 2.7; 418 3.41 0.48 2.7;
419 3.72 0.48 2.7; 420 4.03 0.48 2.7; 421 4.34 0.48 2.7; 422 4.65 0.48 2.7;
423 4.96 0.48 2.7; 424 5.27 0.48 2.7; 425 5.58 0.48 2.7; 426 5.89 0.48 2.7;
427 0.31 1.92 0; 428 0.62 1.92 0; 429 0.93 1.92 0; 430 1.24 1.92 0;
431 1.55 1.92 0; 432 1.86 1.92 0; 433 2.17 1.92 0; 434 2.48 1.92 0;
435 2.79 1.92 0; 436 3.1 1.92 0; 437 3.41 1.92 0; 438 3.72 1.92 0;
439 4.03 1.92 0; 440 4.34 1.92 0; 441 4.65 1.92 0; 442 4.96 1.92 0;
443 5.27 1.92 0; 444 5.58 1.92 0; 445 5.89 1.92 0; 446 0.31 1.44 0;
447 0.62 1.44 0; 448 0.93 1.44 0; 449 1.24 1.44 0; 450 1.55 1.44 0;
Page 27of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

451 1.86 1.44 0; 452 2.17 1.44 0; 453 2.48 1.44 0; 454 2.79 1.44 0;
455 3.1 1.44 0; 456 3.41 1.44 0; 457 3.72 1.44 0; 458 4.03 1.44 0;
459 4.34 1.44 0; 460 4.65 1.44 0; 461 4.96 1.44 0; 462 5.27 1.44 0;
463 5.58 1.44 0; 464 5.89 1.44 0; 465 0.31 0.96 0; 466 0.62 0.96 0;
467 0.93 0.96 0; 468 1.24 0.96 0; 469 1.55 0.96 0; 470 1.86 0.96 0;
471 2.17 0.96 0; 472 2.48 0.96 0; 473 2.79 0.96 0; 474 3.1 0.96 0;
475 3.41 0.96 0; 476 3.72 0.96 0; 477 4.03 0.96 0; 478 4.34 0.96 0;
479 4.65 0.96 0; 480 4.96 0.96 0; 481 5.27 0.96 0; 482 5.58 0.96 0;
483 5.89 0.96 0; 484 0.31 0.48 0; 485 0.62 0.48 0; 486 0.93 0.48 0;
487 1.24 0.48 0; 488 1.55 0.48 0; 489 1.86 0.48 0; 490 2.17 0.48 0;
491 2.48 0.48 0; 492 2.79 0.48 0; 493 3.1 0.48 0; 494 3.41 0.48 0;
495 3.72 0.48 0; 496 4.03 0.48 0; 497 4.34 0.48 0; 498 4.65 0.48 0;
499 4.96 0.48 0; 500 5.27 0.48 0; 501 5.58 0.48 0; 502 5.89 0.48 0;
503 6.5 0 0.54; 504 6.5 0 1.08; 505 6.5 0 1.62; 506 6.5 0 2.16;
507 -0.3 0 0.54; 508 -0.3 0 1.08; 509 -0.3 0 1.62; 510 -0.3 0 2.16;
ELEMENT INCIDENCES SHELL
12 6 11 9 2; 14 4 10 12 8; 15 15 5 1 13; 17 14 3 7 16; 27 1 21 22 23;
28 21 24 25 22; 29 24 26 27 25; 30 26 28 29 27; 31 28 30 31 29; 32 30 32 33 31;
33 32 34 35 33; 34 34 36 37 35; 35 36 38 39 37; 36 38 40 41 39; 37 40 42 43 41;
38 42 44 45 43; 39 44 46 47 45; 40 46 48 49 47; 41 48 50 51 49; 42 50 52 53 51;
43 52 54 55 53; 44 54 56 57 55; 45 56 58 59 57; 46 58 2 60 59; 47 23 22 61 62;
48 22 25 63 61; 49 25 27 64 63; 50 27 29 65 64; 51 29 31 66 65; 52 31 33 67 66;
53 33 35 68 67; 54 35 37 69 68; 55 37 39 70 69; 56 39 41 71 70; 57 41 43 72 71;
58 43 45 73 72; 59 45 47 74 73; 60 47 49 75 74; 61 49 51 76 75; 62 51 53 77 76;
63 53 55 78 77; 64 55 57 79 78; 65 57 59 80 79; 66 59 60 81 80; 67 62 61 82 83;
68 61 63 84 82; 69 63 64 85 84; 70 64 65 86 85; 71 65 66 87 86; 72 66 67 88 87;
73 67 68 89 88; 74 68 69 90 89; 75 69 70 91 90; 76 70 71 92 91; 77 71 72 93 92;
78 72 73 94 93; 79 73 74 95 94; 80 74 75 96 95; 81 75 76 97 96; 82 76 77 98 97;
83 77 78 99 98; 84 78 79 100 99; 85 79 80 101 100; 86 80 81 102 101;
87 83 82 103 104; 88 82 84 105 103; 89 84 85 106 105; 90 85 86 107 106;
91 86 87 108 107; 92 87 88 109 108; 93 88 89 110 109; 94 89 90 111 110;
95 90 91 112 111; 96 91 92 113 112; 97 92 93 114 113; 98 93 94 115 114;
99 94 95 116 115; 100 95 96 117 116; 101 96 97 118 117; 102 97 98 119 118;
103 98 99 120 119; 104 99 100 121 120; 105 100 101 122 121;
106 101 102 123 122; 107 104 103 124 3; 108 103 105 125 124;
109 105 106 126 125; 110 106 107 127 126; 111 107 108 128 127;
112 108 109 129 128; 113 109 110 130 129; 114 110 111 131 130;
115 111 112 132 131; 116 112 113 133 132; 117 113 114 134 133;
Page 28of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

118 114 115 135 134; 119 115 116 136 135; 120 116 117 137 136;
121 117 118 138 137; 122 118 119 139 138; 123 119 120 140 139;
124 120 121 141 140; 125 121 122 142 141; 126 122 123 4 142;
127 17 143 144 145; 128 143 146 147 144; 129 146 148 149 147;
130 148 150 151 149; 131 150 152 153 151; 132 152 154 155 153;
133 154 156 157 155; 134 156 158 159 157; 135 158 160 161 159;
136 160 162 163 161; 137 162 164 165 163; 138 164 166 167 165;
139 166 168 169 167; 140 168 170 171 169; 141 170 172 173 171;
142 172 174 175 173; 143 174 176 177 175; 144 176 178 179 177;
145 178 180 181 179; 146 180 18 182 181; 147 145 144 183 184;
148 144 147 185 183; 149 147 149 186 185; 150 149 151 187 186;
151 151 153 188 187; 152 153 155 189 188; 153 155 157 190 189;
154 157 159 191 190; 155 159 161 192 191; 156 161 163 193 192;
157 163 165 194 193; 158 165 167 195 194; 159 167 169 196 195;
160 169 171 197 196; 161 171 173 198 197; 162 173 175 199 198;
163 175 177 200 199; 164 177 179 201 200; 165 179 181 202 201;
166 181 182 203 202; 167 184 183 204 205; 168 183 185 206 204;
169 185 186 207 206; 170 186 187 208 207; 171 187 188 209 208;
172 188 189 210 209; 173 189 190 211 210; 174 190 191 212 211;
175 191 192 213 212; 176 192 193 214 213; 177 193 194 215 214;
178 194 195 216 215; 179 195 196 217 216; 180 196 197 218 217;
181 197 198 219 218; 182 198 199 220 219; 183 199 200 221 220;
184 200 201 222 221; 185 201 202 223 222; 186 202 203 224 223;
187 205 204 225 226; 188 204 206 227 225; 189 206 207 228 227;
190 207 208 229 228; 191 208 209 230 229; 192 209 210 231 230;
193 210 211 232 231; 194 211 212 233 232; 195 212 213 234 233;
196 213 214 235 234; 197 214 215 236 235; 198 215 216 237 236;
199 216 217 238 237; 200 217 218 239 238; 201 218 219 240 239;
202 219 220 241 240; 203 220 221 242 241; 204 221 222 243 242;
205 222 223 244 243; 206 223 224 245 244; 207 226 225 246 19;
208 225 227 247 246; 209 227 228 248 247; 210 228 229 249 248;
211 229 230 250 249; 212 230 231 251 250; 213 231 232 252 251;
214 232 233 253 252; 215 233 234 254 253; 216 234 235 255 254;
217 235 236 256 255; 218 236 237 257 256; 219 237 238 258 257;
220 238 239 259 258; 221 239 240 260 259; 222 240 241 261 260;
223 241 242 262 261; 224 242 243 263 262; 225 243 244 264 263;
226 244 245 20 264; 227 5 265 21 1; 228 265 266 24 21; 229 266 267 26 24;
230 267 268 28 26; 231 268 269 30 28; 232 269 270 32 30; 233 270 271 34 32;
Page 29of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

234 271 272 36 34; 235 272 273 38 36; 236 273 274 40 38; 237 274 275 42 40;
238 275 276 44 42; 239 276 277 46 44; 240 277 278 48 46; 241 278 279 50 48;
242 279 280 52 50; 243 280 281 54 52; 244 281 282 56 54; 245 282 283 58 56;
246 283 6 2 58; 247 3 124 284 7; 248 124 125 285 284; 249 125 126 286 285;
250 126 127 287 286; 251 127 128 288 287; 252 128 129 289 288;
253 129 130 290 289; 254 130 131 291 290; 255 131 132 292 291;
256 132 133 293 292; 257 133 134 294 293; 258 134 135 295 294;
259 135 136 296 295; 260 136 137 297 296; 261 137 138 298 297;
262 138 139 299 298; 263 139 140 300 299; 264 140 141 301 300;
265 141 142 302 301; 266 142 4 8 302; 267 17 145 303 304; 268 145 184 305 303;
269 184 205 306 305; 270 205 226 307 306; 271 226 19 308 307;
272 304 303 309 310; 273 303 305 311 309; 274 305 306 312 311;
275 306 307 313 312; 276 307 308 314 313; 277 310 309 315 316;
278 309 311 317 315; 279 311 312 318 317; 280 312 313 319 318;
281 313 314 320 319; 282 316 315 321 322; 283 315 317 323 321;
284 317 318 324 323; 285 318 319 325 324; 286 319 320 326 325;
287 322 321 23 1; 288 321 323 62 23; 289 323 324 83 62; 290 324 325 104 83;
291 325 326 3 104; 292 18 182 327 328; 293 182 203 329 327;
294 203 224 330 329; 295 224 245 331 330; 296 245 20 332 331;
297 328 327 333 334; 298 327 329 335 333; 299 329 330 336 335;
300 330 331 337 336; 301 331 332 338 337; 302 334 333 339 340;
303 333 335 341 339; 304 335 336 342 341; 305 336 337 343 342;
306 337 338 344 343; 307 340 339 345 346; 308 339 341 347 345;
309 341 342 348 347; 310 342 343 349 348; 311 343 344 350 349;
312 346 345 60 2; 313 345 347 81 60; 314 347 348 102 81; 315 348 349 123 102;
316 349 350 4 123; 317 19 246 351 308; 318 246 247 352 351;
319 247 248 353 352; 320 248 249 354 353; 321 249 250 355 354;
322 250 251 356 355; 323 251 252 357 356; 324 252 253 358 357;
325 253 254 359 358; 326 254 255 360 359; 327 255 256 361 360;
328 256 257 362 361; 329 257 258 363 362; 330 258 259 364 363;
331 259 260 365 364; 332 260 261 366 365; 333 261 262 367 366;
334 262 263 368 367; 335 263 264 369 368; 336 264 20 332 369;
337 308 351 370 314; 338 351 352 371 370; 339 352 353 372 371;
340 353 354 373 372; 341 354 355 374 373; 342 355 356 375 374;
343 356 357 376 375; 344 357 358 377 376; 345 358 359 378 377;
346 359 360 379 378; 347 360 361 380 379; 348 361 362 381 380;
349 362 363 382 381; 350 363 364 383 382; 351 364 365 384 383;
352 365 366 385 384; 353 366 367 386 385; 354 367 368 387 386;
Page 30of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

355 368 369 388 387; 356 369 332 338 388; 357 314 370 389 320;
358 370 371 390 389; 359 371 372 391 390; 360 372 373 392 391;
361 373 374 393 392; 362 374 375 394 393; 363 375 376 395 394;
364 376 377 396 395; 365 377 378 397 396; 366 378 379 398 397;
367 379 380 399 398; 368 380 381 400 399; 369 381 382 401 400;
370 382 383 402 401; 371 383 384 403 402; 372 384 385 404 403;
373 385 386 405 404; 374 386 387 406 405; 375 387 388 407 406;
376 388 338 344 407; 377 320 389 408 326; 378 389 390 409 408;
379 390 391 410 409; 380 391 392 411 410; 381 392 393 412 411;
382 393 394 413 412; 383 394 395 414 413; 384 395 396 415 414;
385 396 397 416 415; 386 397 398 417 416; 387 398 399 418 417;
388 399 400 419 418; 389 400 401 420 419; 390 401 402 421 420;
391 402 403 422 421; 392 403 404 423 422; 393 404 405 424 423;
394 405 406 425 424; 395 406 407 426 425; 396 407 344 350 426;
397 326 408 124 3; 398 408 409 125 124; 399 409 410 126 125;
400 410 411 127 126; 401 411 412 128 127; 402 412 413 129 128;
403 413 414 130 129; 404 414 415 131 130; 405 415 416 132 131;
406 416 417 133 132; 407 417 418 134 133; 408 418 419 135 134;
409 419 420 136 135; 410 420 421 137 136; 411 421 422 138 137;
412 422 423 139 138; 413 423 424 140 139; 414 424 425 141 140;
415 425 426 142 141; 416 426 350 4 142; 417 17 143 427 304;
418 143 146 428 427; 419 146 148 429 428; 420 148 150 430 429;
421 150 152 431 430; 422 152 154 432 431; 423 154 156 433 432;
424 156 158 434 433; 425 158 160 435 434; 426 160 162 436 435;
427 162 164 437 436; 428 164 166 438 437; 429 166 168 439 438;
430 168 170 440 439; 431 170 172 441 440; 432 172 174 442 441;
433 174 176 443 442; 434 176 178 444 443; 435 178 180 445 444;
436 180 18 328 445; 437 304 427 446 310; 438 427 428 447 446;
439 428 429 448 447; 440 429 430 449 448; 441 430 431 450 449;
442 431 432 451 450; 443 432 433 452 451; 444 433 434 453 452;
445 434 435 454 453; 446 435 436 455 454; 447 436 437 456 455;
448 437 438 457 456; 449 438 439 458 457; 450 439 440 459 458;
451 440 441 460 459; 452 441 442 461 460; 453 442 443 462 461;
454 443 444 463 462; 455 444 445 464 463; 456 445 328 334 464;
457 310 446 465 316; 458 446 447 466 465; 459 447 448 467 466;
460 448 449 468 467; 461 449 450 469 468; 462 450 451 470 469;
463 451 452 471 470; 464 452 453 472 471; 465 453 454 473 472;
466 454 455 474 473; 467 455 456 475 474; 468 456 457 476 475;
Page 31of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

469 457 458 477 476; 470 458 459 478 477; 471 459 460 479 478;
472 460 461 480 479; 473 461 462 481 480; 474 462 463 482 481;
475 463 464 483 482; 476 464 334 340 483; 477 316 465 484 322;
478 465 466 485 484; 479 466 467 486 485; 480 467 468 487 486;
481 468 469 488 487; 482 469 470 489 488; 483 470 471 490 489;
484 471 472 491 490; 485 472 473 492 491; 486 473 474 493 492;
487 474 475 494 493; 488 475 476 495 494; 489 476 477 496 495;
490 477 478 497 496; 491 478 479 498 497; 492 479 480 499 498;
493 480 481 500 499; 494 481 482 501 500; 495 482 483 502 501;
496 483 340 346 502; 497 322 484 21 1; 498 484 485 24 21; 499 485 486 26 24;
500 486 487 28 26; 501 487 488 30 28; 502 488 489 32 30; 503 489 490 34 32;
504 490 491 36 34; 505 491 492 38 36; 506 492 493 40 38; 507 493 494 42 40;
508 494 495 44 42; 509 495 496 46 44; 510 496 497 48 46; 511 497 498 50 48;
512 498 499 52 50; 513 499 500 54 52; 514 500 501 56 54; 515 501 502 58 56;
516 502 346 2 58; 517 2 9 503 60; 518 60 503 504 81; 519 81 504 505 102;
520 102 505 506 123; 521 123 506 10 4; 522 13 1 23 507; 523 507 23 62 508;
524 508 62 83 509; 525 509 83 104 510; 526 510 104 3 14;
START GROUP DEFINITION
ELEMENT
_SHORTWALL 267 TO 316
_LONGWALL 317 TO 516
_BASESLAB 27 TO 126
_HEEL 12 14 15 17 227 TO 266 517 TO 526
_COVERSLAB 127 TO 226
END GROUP DEFINITION
ELEMENT PROPERTY
12 14 15 17 27 TO 126 227 TO 266 517 TO 526 THICKNESS 0.25
267 TO 516 THICKNESS 0.2
127 TO 226 THICKNESS 0.15
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 27579
Page 32of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

END DEFINE MATERIAL


CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
12 14 15 17 27 TO 126 227 TO 266 517 TO 525 -
526 PLATE MAT DIRECT Y SUBGRADE 5000 PRINT
LOAD 9 LOADTYPE Dead TITLE DEAD
SELFWEIGHT Y -1
LOAD 10 LOADTYPE Dead TITLE FF
ELEMENT LOAD
127 TO 226 PR GY -2.5
LOAD 11 LOADTYPE Dead TITLE WALL LOAD
LOAD 12 LOADTYPE Live TITLE LIVE
LOAD 13 LOADTYPE Fluids TITLE WATER FULL
ELEMENT LOAD
318 TRAP GZ JT 0 0 4.8 4.8
319 TRAP GZ JT 0 0 4.8 4.8
320 TRAP GZ JT 0 0 4.8 4.8
321 TRAP GZ JT 0 0 4.8 4.8
322 TRAP GZ JT 0 0 4.8 4.8
323 TRAP GZ JT 0 0 4.8 4.8
324 TRAP GZ JT 0 0 4.8 4.8
325 TRAP GZ JT 0 0 4.8 4.8
326 TRAP GZ JT 0 0 4.8 4.8
327 TRAP GZ JT 0 0 4.8 4.8
328 TRAP GZ JT 0 0 4.8 4.8
329 TRAP GZ JT 0 0 4.8 4.8
330 TRAP GZ JT 0 0 4.8 4.8
331 TRAP GZ JT 0 0 4.8 4.8
332 TRAP GZ JT 0 0 4.8 4.8
333 TRAP GZ JT 0 0 4.8 4.8
334 TRAP GZ JT 0 0 4.8 4.8
335 TRAP GZ JT 0 0 4.8 4.8
336 TRAP GZ JT 0 0 4.8 4.8
337 TRAP GZ JT 4.8 4.8 9.6 9.6
338 TRAP GZ JT 4.8 4.8 9.6 9.6
339 TRAP GZ JT 4.8 4.8 9.6 9.6
340 TRAP GZ JT 4.8 4.8 9.6 9.6
Page 33of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

341 TRAP GZ JT 4.8 4.8 9.6 9.6


342 TRAP GZ JT 4.8 4.8 9.6 9.6
343 TRAP GZ JT 4.8 4.8 9.6 9.6
344 TRAP GZ JT 4.8 4.8 9.6 9.6
345 TRAP GZ JT 4.8 4.8 9.6 9.6
346 TRAP GZ JT 4.8 4.8 9.6 9.6
347 TRAP GZ JT 4.8 4.8 9.6 9.6
348 TRAP GZ JT 4.8 4.8 9.6 9.6
349 TRAP GZ JT 4.8 4.8 9.6 9.6
350 TRAP GZ JT 4.8 4.8 9.6 9.6
351 TRAP GZ JT 4.8 4.8 9.6 9.6
352 TRAP GZ JT 4.8 4.8 9.6 9.6
353 TRAP GZ JT 4.8 4.8 9.6 9.6
354 TRAP GZ JT 4.8 4.8 9.6 9.6
355 TRAP GZ JT 4.8 4.8 9.6 9.6
356 TRAP GZ JT 4.8 4.8 9.6 9.6
357 TRAP GZ JT 9.6 9.6 14.4 14.4
358 TRAP GZ JT 9.6 9.6 14.4 14.4
359 TRAP GZ JT 9.6 9.6 14.4 14.4
360 TRAP GZ JT 9.6 9.6 14.4 14.4
361 TRAP GZ JT 9.6 9.6 14.4 14.4
362 TRAP GZ JT 9.6 9.6 14.4 14.4
363 TRAP GZ JT 9.6 9.6 14.4 14.4
364 TRAP GZ JT 9.6 9.6 14.4 14.4
365 TRAP GZ JT 9.6 9.6 14.4 14.4
366 TRAP GZ JT 9.6 9.6 14.4 14.4
367 TRAP GZ JT 9.6 9.6 14.4 14.4
368 TRAP GZ JT 9.6 9.6 14.4 14.4
369 TRAP GZ JT 9.6 9.6 14.4 14.4
370 TRAP GZ JT 9.6 9.6 14.4 14.4
371 TRAP GZ JT 9.6 9.6 14.4 14.4
372 TRAP GZ JT 9.6 9.6 14.4 14.4
373 TRAP GZ JT 9.6 9.6 14.4 14.4
374 TRAP GZ JT 9.6 9.6 14.4 14.4
375 TRAP GZ JT 9.6 9.6 14.4 14.4
376 TRAP GZ JT 9.6 9.6 14.4 14.4
377 TRAP GZ JT 14.4 14.4 19.2 19.2
378 TRAP GZ JT 14.4 14.4 19.2 19.2
Page 34of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

379 TRAP GZ JT 14.4 14.4 19.2 19.2


380 TRAP GZ JT 14.4 14.4 19.2 19.2
381 TRAP GZ JT 14.4 14.4 19.2 19.2
382 TRAP GZ JT 14.4 14.4 19.2 19.2
383 TRAP GZ JT 14.4 14.4 19.2 19.2
384 TRAP GZ JT 14.4 14.4 19.2 19.2
385 TRAP GZ JT 14.4 14.4 19.2 19.2
386 TRAP GZ JT 14.4 14.4 19.2 19.2
387 TRAP GZ JT 14.4 14.4 19.2 19.2
388 TRAP GZ JT 14.4 14.4 19.2 19.2
389 TRAP GZ JT 14.4 14.4 19.2 19.2
390 TRAP GZ JT 14.4 14.4 19.2 19.2
391 TRAP GZ JT 14.4 14.4 19.2 19.2
392 TRAP GZ JT 14.4 14.4 19.2 19.2
393 TRAP GZ JT 14.4 14.4 19.2 19.2
394 TRAP GZ JT 14.4 14.4 19.2 19.2
395 TRAP GZ JT 14.4 14.4 19.2 19.2
396 TRAP GZ JT 14.4 14.4 19.2 19.2
397 TRAP GZ JT 19.2 19.2 24 24
398 TRAP GZ JT 19.2 19.2 24 24
399 TRAP GZ JT 19.2 19.2 24 24
400 TRAP GZ JT 19.2 19.2 24 24
401 TRAP GZ JT 19.2 19.2 24 24
402 TRAP GZ JT 19.2 19.2 24 24
403 TRAP GZ JT 19.2 19.2 24 24
404 TRAP GZ JT 19.2 19.2 24 24
405 TRAP GZ JT 19.2 19.2 24 24
406 TRAP GZ JT 19.2 19.2 24 24
407 TRAP GZ JT 19.2 19.2 24 24
408 TRAP GZ JT 19.2 19.2 24 24
409 TRAP GZ JT 19.2 19.2 24 24
410 TRAP GZ JT 19.2 19.2 24 24
411 TRAP GZ JT 19.2 19.2 24 24
412 TRAP GZ JT 19.2 19.2 24 24
413 TRAP GZ JT 19.2 19.2 24 24
414 TRAP GZ JT 19.2 19.2 24 24
415 TRAP GZ JT 19.2 19.2 24 24
416 TRAP GZ JT 19.2 19.2 24 24
Page 35of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

317 TRAP GZ JT 0 0 4.8 4.8


417 TRAP GZ JT 0 0 -4.8 -4.8
418 TRAP GZ JT 0 0 -4.8 -4.8
419 TRAP GZ JT 0 0 -4.8 -4.8
420 TRAP GZ JT 0 0 -4.8 -4.8
421 TRAP GZ JT 0 0 -4.8 -4.8
422 TRAP GZ JT 0 0 -4.8 -4.8
423 TRAP GZ JT 0 0 -4.8 -4.8
424 TRAP GZ JT 0 0 -4.8 -4.8
425 TRAP GZ JT 0 0 -4.8 -4.8
426 TRAP GZ JT 0 0 -4.8 -4.8
427 TRAP GZ JT 0 0 -4.8 -4.8
428 TRAP GZ JT 0 0 -4.8 -4.8
429 TRAP GZ JT 0 0 -4.8 -4.8
430 TRAP GZ JT 0 0 -4.8 -4.8
431 TRAP GZ JT 0 0 -4.8 -4.8
432 TRAP GZ JT 0 0 -4.8 -4.8
433 TRAP GZ JT 0 0 -4.8 -4.8
434 TRAP GZ JT 0 0 -4.8 -4.8
435 TRAP GZ JT 0 0 -4.8 -4.8
436 TRAP GZ JT 0 0 -4.8 -4.8
437 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
438 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
439 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
440 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
441 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
442 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
443 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
444 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
445 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
446 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
447 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
448 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
449 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
450 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
451 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
452 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
453 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
Page 36of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

454 TRAP GZ JT -4.8 -4.8 -9.6 -9.6


455 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
456 TRAP GZ JT -4.8 -4.8 -9.6 -9.6
457 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
458 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
459 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
460 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
461 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
462 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
463 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
464 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
465 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
466 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
467 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
468 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
469 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
470 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
471 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
472 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
473 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
474 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
475 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
476 TRAP GZ JT -9.6 -9.6 -14.4 -14.4
477 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
478 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
479 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
480 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
481 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
482 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
483 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
484 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
485 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
486 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
487 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
488 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
489 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
490 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
491 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
Page 37of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

492 TRAP GZ JT -14.4 -14.4 -19.2 -19.2


493 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
494 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
495 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
496 TRAP GZ JT -14.4 -14.4 -19.2 -19.2
497 TRAP GZ JT -19.2 -19.2 -24 -24
498 TRAP GZ JT -19.2 -19.2 -24 -24
499 TRAP GZ JT -19.2 -19.2 -24 -24
500 TRAP GZ JT -19.2 -19.2 -24 -24
501 TRAP GZ JT -19.2 -19.2 -24 -24
502 TRAP GZ JT -19.2 -19.2 -24 -24
503 TRAP GZ JT -19.2 -19.2 -24 -24
504 TRAP GZ JT -19.2 -19.2 -24 -24
505 TRAP GZ JT -19.2 -19.2 -24 -24
506 TRAP GZ JT -19.2 -19.2 -24 -24
507 TRAP GZ JT -19.2 -19.2 -24 -24
508 TRAP GZ JT -19.2 -19.2 -24 -24
509 TRAP GZ JT -19.2 -19.2 -24 -24
510 TRAP GZ JT -19.2 -19.2 -24 -24
511 TRAP GZ JT -19.2 -19.2 -24 -24
512 TRAP GZ JT -19.2 -19.2 -24 -24
513 TRAP GZ JT -19.2 -19.2 -24 -24
514 TRAP GZ JT -19.2 -19.2 -24 -24
515 TRAP GZ JT -19.2 -19.2 -24 -24
516 TRAP GZ JT -19.2 -19.2 -24 -24
292 TRAP GX JT 0 0 4.8 4.8
293 TRAP GX JT 0 0 4.8 4.8
294 TRAP GX JT 0 0 4.8 4.8
295 TRAP GX JT 0 0 4.8 4.8
296 TRAP GX JT 0 0 4.8 4.8
297 TRAP GX JT 4.8 4.8 9.6 9.6
298 TRAP GX JT 4.8 4.8 9.6 9.6
299 TRAP GX JT 4.8 4.8 9.6 9.6
300 TRAP GX JT 4.8 4.8 9.6 9.6
301 TRAP GX JT 4.8 4.8 9.6 9.6
302 TRAP GX JT 9.6 9.6 14.4 14.4
303 TRAP GX JT 9.6 9.6 14.4 14.4
304 TRAP GX JT 9.6 9.6 14.4 14.4
Page 38of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

305 TRAP GX JT 9.6 9.6 14.4 14.4


306 TRAP GX JT 9.6 9.6 14.4 14.4
307 TRAP GX JT 14.4 14.4 19.2 19.2
308 TRAP GX JT 14.4 14.4 19.2 19.2
309 TRAP GX JT 14.4 14.4 19.2 19.2
310 TRAP GX JT 14.4 14.4 19.2 19.2
311 TRAP GX JT 14.4 14.4 19.2 19.2
312 TRAP GX JT 19.2 19.2 24 24
313 TRAP GX JT 19.2 19.2 24 24
314 TRAP GX JT 19.2 19.2 24 24
315 TRAP GX JT 19.2 19.2 24 24
316 TRAP GX JT 19.2 19.2 24 24
267 TRAP GX JT 0 0 -4.8 -4.8
268 TRAP GX JT 0 0 -4.8 -4.8
269 TRAP GX JT 0 0 -4.8 -4.8
270 TRAP GX JT 0 0 -4.8 -4.8
271 TRAP GX JT 0 0 -4.8 -4.8
272 TRAP GX JT -4.8 -4.8 -9.6 -9.6
273 TRAP GX JT -4.8 -4.8 -9.6 -9.6
274 TRAP GX JT -4.8 -4.8 -9.6 -9.6
275 TRAP GX JT -4.8 -4.8 -9.6 -9.6
276 TRAP GX JT -4.8 -4.8 -9.6 -9.6
277 TRAP GX JT -9.6 -9.6 -14.4 -14.4
278 TRAP GX JT -9.6 -9.6 -14.4 -14.4
279 TRAP GX JT -9.6 -9.6 -14.4 -14.4
280 TRAP GX JT -9.6 -9.6 -14.4 -14.4
281 TRAP GX JT -9.6 -9.6 -14.4 -14.4
282 TRAP GX JT -14.4 -14.4 -19.2 -19.2
283 TRAP GX JT -14.4 -14.4 -19.2 -19.2
284 TRAP GX JT -14.4 -14.4 -19.2 -19.2
285 TRAP GX JT -14.4 -14.4 -19.2 -19.2
286 TRAP GX JT -14.4 -14.4 -19.2 -19.2
287 TRAP GX JT -19.2 -19.2 -24 -24
288 TRAP GX JT -19.2 -19.2 -24 -24
289 TRAP GX JT -19.2 -19.2 -24 -24
290 TRAP GX JT -19.2 -19.2 -24 -24
291 TRAP GX JT -19.2 -19.2 -24 -24
27 TO 126 PR GY -24
Page 39of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

LOAD 14 LOADTYPE Soil TITLE SOIL PRESSURE


ELEMENT LOAD
268 TRAP GX JT 0 0 1.44 1.44
269 TRAP GX JT 0 0 1.44 1.44
270 TRAP GX JT 0 0 1.44 1.44
271 TRAP GX JT 0 0 1.44 1.44
272 TRAP GX JT 1.44 1.44 2.88 2.88
273 TRAP GX JT 1.44 1.44 2.88 2.88
274 TRAP GX JT 1.44 1.44 2.88 2.88
275 TRAP GX JT 1.44 1.44 2.88 2.88
276 TRAP GX JT 1.44 1.44 2.88 2.88
277 TRAP GX JT 2.88 2.88 4.32 4.32
278 TRAP GX JT 2.88 2.88 4.32 4.32
279 TRAP GX JT 2.88 2.88 4.32 4.32
280 TRAP GX JT 2.88 2.88 4.32 4.32
281 TRAP GX JT 2.88 2.88 4.32 4.32
282 TRAP GX JT 4.32 4.32 5.76 5.76
283 TRAP GX JT 4.32 4.32 5.76 5.76
284 TRAP GX JT 4.32 4.32 5.76 5.76
285 TRAP GX JT 4.32 4.32 5.76 5.76
286 TRAP GX JT 4.32 4.32 5.76 5.76
287 TRAP GX JT 5.76 5.76 7.2 7.2
288 TRAP GX JT 5.76 5.76 7.2 7.2
289 TRAP GX JT 5.76 5.76 7.2 7.2
290 TRAP GX JT 5.76 5.76 7.2 7.2
291 TRAP GX JT 5.76 5.76 7.2 7.2
267 TRAP GX JT 0 0 1.44 1.44
292 TRAP GX JT 0 0 -1.44 -1.44
293 TRAP GX JT 0 0 -1.44 -1.44
294 TRAP GX JT 0 0 -1.44 -1.44
295 TRAP GX JT 0 0 -1.44 -1.44
296 TRAP GX JT 0 0 -1.44 -1.44
297 TRAP GX JT -1.44 -1.44 -2.88 -2.88
298 TRAP GX JT -1.44 -1.44 -2.88 -2.88
299 TRAP GX JT -1.44 -1.44 -2.88 -2.88
300 TRAP GX JT -1.44 -1.44 -2.88 -2.88
301 TRAP GX JT -1.44 -1.44 -2.88 -2.88
302 TRAP GX JT -2.88 -2.88 -4.32 -4.32
Page 40of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

303 TRAP GX JT -2.88 -2.88 -4.32 -4.32


304 TRAP GX JT -2.88 -2.88 -4.32 -4.32
305 TRAP GX JT -2.88 -2.88 -4.32 -4.32
306 TRAP GX JT -2.88 -2.88 -4.32 -4.32
307 TRAP GX JT -4.32 -4.32 -5.76 -5.76
308 TRAP GX JT -4.32 -4.32 -5.76 -5.76
309 TRAP GX JT -4.32 -4.32 -5.76 -5.76
310 TRAP GX JT -4.32 -4.32 -5.76 -5.76
311 TRAP GX JT -4.32 -4.32 -5.76 -5.76
312 TRAP GX JT -5.76 -5.76 -7.2 -7.2
313 TRAP GX JT -5.76 -5.76 -7.2 -7.2
314 TRAP GX JT -5.76 -5.76 -7.2 -7.2
315 TRAP GX JT -5.76 -5.76 -7.2 -7.2
316 TRAP GX JT -5.76 -5.76 -7.2 -7.2
417 TRAP GZ JT 0 0 1.44 1.44
418 TRAP GZ JT 0 0 1.44 1.44
419 TRAP GZ JT 0 0 1.44 1.44
420 TRAP GZ JT 0 0 1.44 1.44
421 TRAP GZ JT 0 0 1.44 1.44
422 TRAP GZ JT 0 0 1.44 1.44
423 TRAP GZ JT 0 0 1.44 1.44
424 TRAP GZ JT 0 0 1.44 1.44
425 TRAP GZ JT 0 0 1.44 1.44
426 TRAP GZ JT 0 0 1.44 1.44
427 TRAP GZ JT 0 0 1.44 1.44
428 TRAP GZ JT 0 0 1.44 1.44
429 TRAP GZ JT 0 0 1.44 1.44
430 TRAP GZ JT 0 0 1.44 1.44
431 TRAP GZ JT 0 0 1.44 1.44
432 TRAP GZ JT 0 0 1.44 1.44
433 TRAP GZ JT 0 0 1.44 1.44
434 TRAP GZ JT 0 0 1.44 1.44
435 TRAP GZ JT 0 0 1.44 1.44
436 TRAP GZ JT 0 0 1.44 1.44
437 TRAP GZ JT 1.44 1.44 2.88 2.88
438 TRAP GZ JT 1.44 1.44 2.88 2.88
439 TRAP GZ JT 1.44 1.44 2.88 2.88
440 TRAP GZ JT 1.44 1.44 2.88 2.88
Page 41of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

441 TRAP GZ JT 1.44 1.44 2.88 2.88


442 TRAP GZ JT 1.44 1.44 2.88 2.88
443 TRAP GZ JT 1.44 1.44 2.88 2.88
444 TRAP GZ JT 1.44 1.44 2.88 2.88
445 TRAP GZ JT 1.44 1.44 2.88 2.88
446 TRAP GZ JT 1.44 1.44 2.88 2.88
447 TRAP GZ JT 1.44 1.44 2.88 2.88
448 TRAP GZ JT 1.44 1.44 2.88 2.88
449 TRAP GZ JT 1.44 1.44 2.88 2.88
450 TRAP GZ JT 1.44 1.44 2.88 2.88
451 TRAP GZ JT 1.44 1.44 2.88 2.88
452 TRAP GZ JT 1.44 1.44 2.88 2.88
453 TRAP GZ JT 1.44 1.44 2.88 2.88
454 TRAP GZ JT 1.44 1.44 2.88 2.88
455 TRAP GZ JT 1.44 1.44 2.88 2.88
456 TRAP GZ JT 1.44 1.44 2.88 2.88
457 TRAP GZ JT 2.88 2.88 4.32 4.32
458 TRAP GZ JT 2.88 2.88 4.32 4.32
459 TRAP GZ JT 2.88 2.88 4.32 4.32
460 TRAP GZ JT 2.88 2.88 4.32 4.32
461 TRAP GZ JT 2.88 2.88 4.32 4.32
462 TRAP GZ JT 2.88 2.88 4.32 4.32
463 TRAP GZ JT 2.88 2.88 4.32 4.32
464 TRAP GZ JT 2.88 2.88 4.32 4.32
465 TRAP GZ JT 2.88 2.88 4.32 4.32
466 TRAP GZ JT 2.88 2.88 4.32 4.32
467 TRAP GZ JT 2.88 2.88 4.32 4.32
468 TRAP GZ JT 2.88 2.88 4.32 4.32
469 TRAP GZ JT 2.88 2.88 4.32 4.32
470 TRAP GZ JT 2.88 2.88 4.32 4.32
471 TRAP GZ JT 2.88 2.88 4.32 4.32
472 TRAP GZ JT 2.88 2.88 4.32 4.32
473 TRAP GZ JT 2.88 2.88 4.32 4.32
474 TRAP GZ JT 2.88 2.88 4.32 4.32
475 TRAP GZ JT 2.88 2.88 4.32 4.32
476 TRAP GZ JT 2.88 2.88 4.32 4.32
477 TRAP GZ JT 4.32 4.32 5.76 5.76
478 TRAP GZ JT 4.32 4.32 5.76 5.76
Page 42of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

479 TRAP GZ JT 4.32 4.32 5.76 5.76


480 TRAP GZ JT 4.32 4.32 5.76 5.76
481 TRAP GZ JT 4.32 4.32 5.76 5.76
482 TRAP GZ JT 4.32 4.32 5.76 5.76
483 TRAP GZ JT 4.32 4.32 5.76 5.76
484 TRAP GZ JT 4.32 4.32 5.76 5.76
485 TRAP GZ JT 4.32 4.32 5.76 5.76
486 TRAP GZ JT 4.32 4.32 5.76 5.76
487 TRAP GZ JT 4.32 4.32 5.76 5.76
488 TRAP GZ JT 4.32 4.32 5.76 5.76
489 TRAP GZ JT 4.32 4.32 5.76 5.76
490 TRAP GZ JT 4.32 4.32 5.76 5.76
491 TRAP GZ JT 4.32 4.32 5.76 5.76
492 TRAP GZ JT 4.32 4.32 5.76 5.76
493 TRAP GZ JT 4.32 4.32 5.76 5.76
494 TRAP GZ JT 4.32 4.32 5.76 5.76
495 TRAP GZ JT 4.32 4.32 5.76 5.76
496 TRAP GZ JT 4.32 4.32 5.76 5.76
497 TRAP GZ JT 5.76 5.76 7.2 7.2
498 TRAP GZ JT 5.76 5.76 7.2 7.2
499 TRAP GZ JT 5.76 5.76 7.2 7.2
500 TRAP GZ JT 5.76 5.76 7.2 7.2
501 TRAP GZ JT 5.76 5.76 7.2 7.2
502 TRAP GZ JT 5.76 5.76 7.2 7.2
503 TRAP GZ JT 5.76 5.76 7.2 7.2
504 TRAP GZ JT 5.76 5.76 7.2 7.2
505 TRAP GZ JT 5.76 5.76 7.2 7.2
506 TRAP GZ JT 5.76 5.76 7.2 7.2
507 TRAP GZ JT 5.76 5.76 7.2 7.2
508 TRAP GZ JT 5.76 5.76 7.2 7.2
509 TRAP GZ JT 5.76 5.76 7.2 7.2
510 TRAP GZ JT 5.76 5.76 7.2 7.2
511 TRAP GZ JT 5.76 5.76 7.2 7.2
512 TRAP GZ JT 5.76 5.76 7.2 7.2
513 TRAP GZ JT 5.76 5.76 7.2 7.2
514 TRAP GZ JT 5.76 5.76 7.2 7.2
515 TRAP GZ JT 5.76 5.76 7.2 7.2
516 TRAP GZ JT 5.76 5.76 7.2 7.2
Page 43of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

317 TRAP GZ JT 0 0 -1.44 -1.44


318 TRAP GZ JT 0 0 -1.44 -1.44
319 TRAP GZ JT 0 0 -1.44 -1.44
320 TRAP GZ JT 0 0 -1.44 -1.44
321 TRAP GZ JT 0 0 -1.44 -1.44
322 TRAP GZ JT 0 0 -1.44 -1.44
323 TRAP GZ JT 0 0 -1.44 -1.44
324 TRAP GZ JT 0 0 -1.44 -1.44
325 TRAP GZ JT 0 0 -1.44 -1.44
326 TRAP GZ JT 0 0 -1.44 -1.44
327 TRAP GZ JT 0 0 -1.44 -1.44
328 TRAP GZ JT 0 0 -1.44 -1.44
329 TRAP GZ JT 0 0 -1.44 -1.44
330 TRAP GZ JT 0 0 -1.44 -1.44
331 TRAP GZ JT 0 0 -1.44 -1.44
332 TRAP GZ JT 0 0 -1.44 -1.44
333 TRAP GZ JT 0 0 -1.44 -1.44
334 TRAP GZ JT 0 0 -1.44 -1.44
335 TRAP GZ JT 0 0 -1.44 -1.44
336 TRAP GZ JT 0 0 -1.44 -1.44
337 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
338 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
339 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
340 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
341 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
342 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
343 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
344 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
345 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
346 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
347 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
348 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
349 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
350 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
351 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
352 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
353 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
354 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
Page 44of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

355 TRAP GZ JT -1.44 -1.44 -2.88 -2.88


356 TRAP GZ JT -1.44 -1.44 -2.88 -2.88
357 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
358 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
359 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
360 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
361 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
362 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
363 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
364 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
365 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
366 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
367 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
368 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
369 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
370 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
371 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
372 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
373 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
374 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
375 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
376 TRAP GZ JT -2.88 -2.88 -4.32 -4.32
377 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
378 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
379 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
380 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
381 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
382 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
383 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
384 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
385 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
386 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
387 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
388 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
389 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
390 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
391 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
392 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
Page 45of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

393 TRAP GZ JT -4.32 -4.32 -5.76 -5.76


394 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
395 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
396 TRAP GZ JT -4.32 -4.32 -5.76 -5.76
397 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
398 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
399 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
400 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
401 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
402 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
403 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
404 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
405 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
406 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
407 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
408 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
409 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
410 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
411 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
412 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
413 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
414 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
415 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
416 TRAP GZ JT -5.76 -5.76 -7.2 -7.2
LOAD 63 LOADTYPE Dead TITLE VEHICLE LOAD
ELEMENT LOAD
127 TO 226 PR GY -10
LOAD 64 LOADTYPE Dead TITLE EQUIPMENT LOAD
LOAD 65 LOADTYPE Dead TITLE SOIL AT HEEL PORTION
ELEMENT LOAD
12 14 15 17 227 TO 266 517 TO 526 PR GY -43.2
LOAD COMB 100 1.5(DL+VEHICLE+EQUIP+LL+SOIL)
9 1.5 12 1.5 14 1.5 10 1.5 11 1.5 63 1.5 64 1.5
LOAD COMB 101 1.5(DL+VEHICLE+EQUIP+WATER FULL+LIVE)
9 1.5 12 1.5 13 1.5 10 1.5 11 1.5 63 1.5 64 1.5
LOAD COMB 102 DL+VEHICLE+EQUIP+SOIL+LIVE
9 1.0 14 1.0 12 1.0 10 1.0 11 1.0 63 1.0 64 1.0
LOAD COMB 103 DEAD+ WF+ LIVE
Page 46of 47
RCC UG TANK PROJECT Doc No : CC-2022-DR-030

CALCULUS
Rev 0
CONSULTANTS DESIGN REPORT FOR RCC UNDER GROUND
TANK AT MUZAFFARPUR AT BIHAR

9 1.0 10 1.0 11 1.0 13 1.0 12 1.0 63 1.0 64 1.0


LOAD COMB 104 DD +VEHICLE+EQUIP+SOIL+ WF +LIVE
9 1.0 10 1.0 11 1.0 12 1.0 14 1.0 13 1.0 63 1.0 64 1.0
LOAD COMB 105 DEAD +VEHICLE+EQUIP+LIVE
9 1.0 10 1.0 11 1.0 12 1.0 63 1.0 64 1.0
PERFORM ANALYSIS PRINT ALL
FINISH

Page 47of 47

You might also like