Professional Documents
Culture Documents
CONTENT
1. 94 Ki Summary
94 Ki Tree Diagram & Action Plan
94 Ki PDCA Summary
2. 94 Ki 2Q PDCA Activities
Enhance alignment between associates key performance indicator (KPI) with
company target
Improve effectiveness and efficiency of organizational design
Enhance implementation of individual career & development
Develop associates capabilities throughout training program
Enhance Honda Philosophy Training for all associates
Enhance awareness campaign about Honda Philosophy implementation in
daily operation
Career Planning Implementation
P D C A
Strategy 94 Ki 2Q
Control Item 94 Ki 2Q Actual Eva Gap Analysis Countermeasure
Implementation Target
Enhance % associates 100% Pada bulan nov sudah dilakukan sosialisasi Beberapa dept lupa untuk Correction
individual given pada tanggal kepada 42 dept yang pengumpulan IDP. 1. Melakukan Follow up by
training based development memiliki star kandidat untuk di siapkan email personal dan telp
training (4
on ICDP & naik jabatan ke level ACT. untuk pengumpulan IDP
associates per
assessment serta melanjutkan proses
month)
Dari 42 dept baru 11 Dept(11%) yang monitoring tahap pertama
sudah submit ke pod. Masih ada ada 31 menanyakan untuk kendala
dept lagi yang belum submit. dan dukungan yang
diberikan kepada yang
Buat Tabel bersangkutan.
targe
Actual Diff eva
t
Strategy 94 Ki 2Q
Control Item 94 Ki 2Q Actual Eva Gap Analysis Countermeasure
Implementation Target
Enhance % associates 100% Pengumpulan ICDP sudah mencapai 78 Masih belum mendapatkan tanda Correction
individual given dept (82%). Dan masih ada 17Dept yang tangan dari pak Jonfis. 1. Mengingatkan kembali
training based development masih belum mengumpulkan ICDP hard Dokumen masih tertahan di pak pak Billy melalui email
training (4
on ICDP & copy dengan tanda Direktur. Yusak Billy. untuk memintakan
associates per
assessment Pak billy belum meminta tanda tanda tangan pak
month)
17 Dept tersebut merupakan dibawahnya tangan Pak Jonfis jonfis.
dari divisi pak jonfis.
targe
Actual Diff eva
t
Strategy 94 Ki 2Q
Control Item 94 Ki 2Q Actual Eva Gap Analysis Countermeasure
Implementation Target
Enhance % associates 100% 1. No associates (0%) had been facilitated PD section failed to achieve the Countermeasure / aspect
individual given in development training in November target set on November 2017. that can be improved for
training based development 2017. next month:
training (4
on ICDP & The gap analysis for next month
associates per
assessment 2. Regarding monthly target, PD sect had improvement were as follows: Correction Action :
month)
conduted discussion with POD dept 1. No associates had been 1. Set a new training date
head. facilitated. with the vendor
Why Reason (Result: training will be
Discussion Result
held on 4 – 5 Dec ’17).
For next ICDP Root The lead trainer had a
(2017-2018), PD sect Cause schedule clash with 2. PD section already
will adjust the target another training on the collected each dept
by applying filter to same date.
ICDP softcopy (except
reduce the overall
2. Adjusting target by applying Service dept.), and use
number of
associate. filter. STAR category
Disrepancy employee as filter;
between number Why Reason
Filter used were: resulted in 48 associate
of associates that
- Associate Why 1 Number of associates that fulfill the criteria
need to be that needed facilitation
training history for next year ICDP.
facilitated with the way exceed PD monthly
- Employee with
current monthly target.
STAR category Corrective Action :
target.
Root PD section haven’t set 1. Follow-up on the
For November –
Cause filter to determine rescheduled training
December 2017, PD
section still use the
which associate to be and other training in
prioritized for training. December ‘17.
Q3 – Q4 criteria (4
associate facilitated
per month). 2. Held meeting with POD
dept head regarding
future PD section KPI’s
& the result from
filtering associates with
said filter (est. at 2nd
week of December ‘17)
Skill Matrix
P D C A
Strategy Control
94 Ki Target 93 Ki 1-3Q Actual Eva Gap Analysis Countermeasure
Implementation Item
Corrective Action :
1. Start sending emails to
each dept to update
their Skill Matrix PIC
est. to be sent 7th
December 2017.
2. Follow up each
department new PIC
for socialization (by
sending emails & other
forms of
communication).
Workshop Coaching Program
P D C A
Strategy 94 Ki 1Q
Develop
Implementation associates
Control Item
Target capabilities throughout
94 Ki 1Q Actual training
Eva program
Gap Analysis Countermeasure
Corrective Action
1. Follow-up the
participants for the
next Coaching Café
(sending reminder
mail during the second
week of December
2017).
Training Program
P D C A
Strategy 94 Ki
Control Item 94 Ki 31 Actual Eva Gap Analysis Countermeasure
Implementation Target
Conduct media Number of 5 As of November 2017, the video campaign has PD section failed to follow the Countermeasure for next
campaign about media used media not been played (0% completion). timeline for video campaign. socialization:
Honda Philosophy for (100%)
in daily operation campaign PD section already tested the CD player at The gap analysis were as follows: Correction Action :
Sunter plant canteen – only need to replace the 1. PD section already
cables (Issue resolved). 1. Feedback regarding involved Mr. Deris, Mr.
video/translation. Rais & Ms. Betsy to
Overall, PD section failed to follow the Why proof-read and check
Reason
scheduled plans. Failure were caused by: the translation (1 video
1. The translation provided were hard to Why 1 Several lines of the video done out of 5).
understand (still have technical terms; translation were hard to
understand. Held the second
literal translation from English to Bahasa,
etc). Root The video translation meeting with Mr.
2. No clear timeline regarding video campaign Cause quality have not been Adji for video checking
reviewed by experts & & approval (still
(still unclear – have not been discussed). POD dept head for their
accuracy. waiting for
confimation)
2. No clear timeline regarding video
campaign. 2. PD section scheduled
Why Reason
to discuss w/ dept
head & HP team
Why 1 Honda Philosophy video regarding the newest
campaign does not have a timeline at 2nd week of
clear timeline
December 2017.
Root PD section have not
Cause discuss regarding the Corrective Action :
newest timeline with
Honda Philosophy team &
1. Submit every video
POD dept. head. campaign done to Mr.
Adji for approval
(expected to be done
before January 2018).
2. Stick with the new
timeline discussed to
make sure the video
can be played on time.
Training Program
P D C A
Strategy 94 Ki Ev
Control Item 94 Ki 31 Actual Gap Analysis Countermeasure
Implementation Target a
Create Honda’s Number of 1 meeting As of November 2017, Honda Philosophy Based on evaluation results and Based on the gap analysis,
Corner informal training training to staff-chief level have been held 2 remarks, the gap analysis were as following countermeasure
group sharing held times. follows: as follows:
discussion 1. No modules/handbook given.
The result of the training as follows: Correction Action :
Why Reason
1. For the next training,
No Training Date Participants Evaluation
Root Facilitator forgot to PD sect will double-
1 9 Nov ‘17 14 staff-chief MS 4.2 Cause bring the Honda check the items
2 27 Nov '17 13 staff-chief IT. 4.1 Philosophy handbook needed at least H-3
to be given to the
before training
participants.
Training Material Evaluation Result: (utilizing training
Training Training
checklist form).
Date Evaluation Result (avg) 2. Add audio/video during training. 2. PD sect will try to
Pre-Test 65.58 include video/audio to
9 November Why Reason
2017 complement the next
Post-Test 87.90 ( 22.3 )
Root There is no audio/video training (est. will be
27 Pre-Test 58.74 Cause that present during the
November
held on 3rd week of
Post-Test 93.71 ( 34.97 ) training. January 2018)
2017