1. Pre-pour checks
1. Pre-pour checks:
Toolbox talks should be conducted on regular basis for proper concreting procedure and
repairing procedures. During the toolbox talks, all the problems which is encountered
during the phase of project to be discussed. Also the checklist to be updated and
maintained during inspections. The checklist with do and don’ts shall be displayed at site
to keep the construction team updated.
Maintain the record of training with necessary photographs and attendance to monitor
the effectiveness.
Repair and Reworks
As of now there is no major repairing reported. The core wall verticality has been verified by
the ‘KONE’ elevator representative and found within acceptable limit. The major area of
concern is as described below: