DYNAM I C G ROU P PR O J E CT
ー dargchoco
Arranged by:
• Fadila Zurli 2017710132
• Aisyah Nur Fauziyyah 2017710085
• Fini Cahyani 2017710090
• Adzhani Khanza 2017710105
• Savira Fadilah 2017710108
• Annisa Aulia 2017710120
• Lintang Anindita Putri 2017710121
• Ananda Cahyani 2017710145
FR
Trash Bin
Trash bin is a bin that holds rubbish until it is collected. Its container that
ussualy has a lid. Trash can is an essential requirement in human life.
Almost every day we produce garbage. Its all food waste, vegetables,
and electronic waste. garbage accumulates The more the amount of
waste, the bigger the size of the trash that is needed. All goods must be
collected into one in a special container for waste and then disposed of to
another shelter and after some selection process may be possible
recycling process.
Add a footer 3
FR
Activity Goals
Making a trash can with a special chopper inside it aims to:
Add a footer 4
FR
Target
The target from the activities of making
crushing bin for organic trash is the
Theme of
society in jalan Poncol Indah III
Activity
especially around ratih boarding house. The Crushing bins as a tool to facilitate
Add a footer 5
FR
Name of the Activity Form of the Activity
PLACE OF ACTIVITY:
Place : Jl. Poncol Indah III RT 05/02 No. 16a Cirendeu Ciputat Timur
Add a footer 7
FR
Evaluation!
The things we will divide • Support Factors:
– Communication between fellow members is very good
to the different group
such as in contributing ideas to create activities that
which that is support benefit to the society.
factors and inhibitor – All members work together diligently, carefully and are
Add a footer 8
FR
• Inhibitor Factors
– The equipment in this activity is not according to plan
because initially it was planned to enumerate inorganic
waste in the end only in organic waste that can be
enumerated by this tool.
MATERIALS Others
Unit
Needs Amount TOTAL
Needs Amount Unit Price TOTAL Price
Square Wood 2 Rp.17.000,- Rp. 34.000,- Delivery 1 Rp. Rp.
fee (go- 38.000,- 38.000,-
Cutter Blade 9 Rp.7.000,- Rp.63.000,-
send)
Thick Plywood 1 Rp.60.000,- Rp. 60.000,- Welding 1 Rp. Rp.
Fan Dynamo 1 Rp.57.500,- Rp. 57.500,- 10.000,- 10.000,-
Total Of Others Rp.
Iron Sheeting 2 Rp.30.000,- Rp. 60.000,-
48.000,-
Glue Sticks 5 Rp.2.000,- Rp. 10.000,-
Korean Glue 1 Rp.7.000,- Rp. 7.000,-
Iron Glue 5 Rp.6.000,- Rp. 30.000,-
Nail ¼ Rp.6.000,- Rp. 6.000,-
Light Switch 1 Rp.10.000,- Rp. 10.000,-
Cable 1 Rp.14.500,- Rp. 14.500,-
Total Of Materials Rp. 352.000,-
Add a footer 10
FR
Budget Recapitulation
NO. TOTAL
Rp. 352.000,-
1. Material
2. Others Rp. 48.000,-
TOTAL Rp. 400.000,-
Add a footer 11
FR
Add a footer 12
FR
One of the society collecting waste Organic waste before being chopped
Add a footer 13
FR
The trials to processing waste in to the The picture of waste alraeady being
crushing bin chopped
Add a footer 14
FR
Documentation of ‘Crashing Bin’
Add a footer 15
FR