PRE-ACTIVITY TRAINING AND ORIENTATION ON

QUALITY
CONCRETE WORKS
CONCRETE WORKS

Agenda

• Scope of Work Background and Description


• Procedure
CONCRETE WORKS

In pouring/placing of ready mixed concrete make sure all the equipment such as pump
crete, tower crane, vibrator and other accessories needed are functionally accordingly. As our
requirements from the batching plant all ready mixed concrete shall be placed and poured on
or before 3.5 hours Testing of concrete shall be required for seven (7) days and twenty eight
(28) days until it attained the required strength. Hence there are some items of to be
considered hereunder
CONCRETE WORKS
1. Approved rebar checklist
Procedure 2. Approved formworks checklist
3. Structural slab / Finish floor line reference and Floor level depression
4. Floor finish (rough or straight to finish)
5. Construction joint location should be established
6. Required Beam & slab shear bars
7. Provide Concrete accessories
Concrete epoxy bond
Water stop
Curing compound
Integral waterproofing
Sufficient quantity of tools / equipment / manpower
Concrete vibrator
Shovels and pails
Trowel / power trowel / floats / spreaders
Manpower (skilled and labor)
Leveling laser equipment
CONCRETE WORKS

CEMENT FACTOR TO BE CONSIDERED

SAND (S1) AND


CEMENT FACTOR
REQUIRED STRENGTH GRAVEL(3/5’’) PER
(BAGS)
CU.M

3000 PSI  11.0  11.0 : 2 : 4

4000 PSI  12.5  12.5 : 2 : 4

CLEANING CLEARING THE AREA

After stripping the areas, all material for rebars and formworks shall be
sorting and segregates accordingly. All unsuitable materials shall be spread
or removed at the proposed building. The contractor should assigned
sufficient manpower for cleaning on this matter.