You are on page 1of 4

01 Mech work

BC 01 BC01 BC01

Loading unloading pulley Leveling Condition finish continue to


On Position after check Centering
leg support of Frame BC installation
tolerance

0.00%
02 Mechanical work

Limestone Hopper 100m3 Limestone Hopper 100m3


Clay Hopper 50m3 Cap
Cap Cap
Install embedded Plate t = 16 mm 1 stage embedded Plate Installation
Hole Preparation for Pouring concrete and
Notbeyet
will start again after finish
covering
after finish pouring than welding Rail
43kg/m Spec
03 Mechanical work

BC02 TUNNEL BC02 TUNNEL BC02 TUNNEL


Installation of frame structure and 2 welder execute for Welding work Pulley already install on position
Not yet start
roller support
04 Mechanical work

DISCHARGE CHUTE LOWER CRUSHER LOWER CRUSHER


Ready to install liner plate before Open the front wall of lower parts Check item of lower crusher
Not yet start
install lower part of crusher crusher