Contractual Project Completion Date 14-Mar-2024
Revised Project Start Date 22-Sep-2022
Completed Value 11.37 Cr
Revised Project Completion Date
28-Apr-2024
Claimed Value up
Work Order Work Done Value up To Be Billed as on
S. No Works to 02.01.2023 (RAB Work in Progress
Value to jan 2023 25.01.2023
01)
Planned
S.No Description of work Value in Hindrance Responsible
Cr
Reinforcement steel On
2 Raft works 19.01.2023 and
26.01.2023
Labour/ Material Requirements – Feb ’23
3 Unskilled Nos 25 25 0
2 Fresher 01 Nos
DRAWING REQUIREMENTS
• 1)Section BB Slab Grade of concrete
• 2)Is there any M sand Filling, LDPE Sheet and PCC needed below the escalator base slab
• 3)Is there any Plinth beam at FFL for duct ,Shaft,Toilet outer walls ,In electrical
rooms,Service area ?
• 4)Service area floor level is (+)0.00 , whether FFL plinth beam is need or not,If needed
kindly give Section details
• 5)Inner plastering for brick walls at basement level is need or not
• 7)NGL Plinth beam top to FFL is 1.25 m only,but in the above drawing it was mentioned
as 1.35 m
• 8)RCW 1 Grade of concrete
• 9)Lift opening details
• 10)Staircase details
• 11)Section Details X1,X2,X4,Y1
• 12)Ground floor and typical floor roof beam and slab drawings
• 13)Arch Beam reinforcement lapping arrangement approval
Project Supply Requirements for Upcoming Month (Feb ’ 23 )
2 Steel Mt 0
6 Plywood Nos -
7 Runner Cft -
SRM KTR Delay Hindrance details
Tech Tower 2 Building
No of
Sl.N Work status as on
Description As per schedule Actual days Remarks
o delay 24.01.2023
TECH TOWER Start date Finish date Start date Finish date
1 Earth work 26-Sep-22 13-Oct-22 22-Sep-22 19-Nov-22 37
2 PCC for Raft 10-Oct-22 15-Oct-22 10-Oct-22 22-Nov-22 38
Pedastal and
Plinth beam final
GFC drawing
9 Back filling 15-Nov-22 20-Nov-22 05-Jan-23
Received on 05
jan and 11 jan
respectively
GFC Drawing
10 Grade slab 19-Nov-22 25-Nov-22 04-Mar-23 received on
19.01.2023
SRM KTR Delay Hindrance details
Tech Tower 2 Building
No of days Delay due to drawing
Sl.No Description Start Finish Drawing issue date Rain Client clearance Remarks
delay issue
ON 12.01.2023 ON 30.01.2023
PROGRESS STATUS
STATUS
South west corner Pour 1
ON 12.01.2023 ON 30.01.2023
North WEST
On 12.01.2023 On 30.01.2023
•.
NORTH EAST corner
ON 12.01.2023 ON 30.01.2023
South East corner
ON 12.01.2023 ON 30.01.2023
QA&QC – Slide presentation
Quality Tracker – NC open Vs Closed
S.No Description Total NC Closed Opened
1 Total No.of NC - - -
Cube Register
S.No Description Total Set Passed Failed Balance to
of cube be tested
1 M40 Trial Mix 1 1 - -
2 M40 SCC Trial Mix 1 1 - -
3 M40 Grade
7 days 65 65 - 0
14 days 65 48 - 17
28 Days 65 30 - 35
4 M40 SCC Grade
7 days 15 15 - -
14 days 15 15 - -
28 Days 15 15 - -
Total Nos 240 188 - 52
QC– Slide presentation
SAFETY SLIDE
TECH TOWER 2
Tactive – status