Professional Documents
Culture Documents
Basics
Basics
0.3m
10.6 m
CENTRE LINE METHOD
0.3m 0.3m
5.3 m Total Centre line length of walls = 2 ( 10.3 + 5.3 ) = 31.2 m
0.3m 5m
Area of walls = 31.2 * 0.3 = 9.36 m2
Volume of walls = 9.36 *3 = 28.08 m3
10m
0.3m
10.3 m
Area=0.15*0.3
area=0.15*0.2
area=0.1*0.2
• L junction
• T junction
TYPES OF T JUNCTIONS
1. Main wall to main wall
2. Main wall to partition wall
3. Partition wall to partition wall
CENTRE LINE METHOD
30cm wall to 30 cm wall
0.3m 0.3m 0.3m Total Centre line length 30cm of walls = (13.2 + 15.9) –
5.3 m 4m*5m 2m*5m
0.3m 2*(0.3/2) = 28.8 m
6.6 m
CENTRE LINE METHOD • Centre line Length of 30cm wall along X axis = 2(0.3/2 +4+0.3
30cm wall to 20 cm wall +2 + 0.3/2) = 13.2 m
• Centre line Length of 30cm wall along Y axis = 2( 0.3/2 + 5 +
0.3/2) = 10.6 m
• Centre line Length of 20cm wall along Y axis = 0.3/2 + 5 +
0.3/2 = 5.3 m
0.3m
0.2m 0.2m Total Centre line length of 20cm walls = 12.8 +15.4 = 28.2m
5.2 m 4m*5m 2m*5m
0.3m
Area of 20cm walls = 28.2 * 0.2 = 5.64 m2
6.4 m
CENTRE LINE METHOD
0.3m
0.3m 0.3m
5.3 m 4m*5m 0.3m 2m*5m
0.3m
6.6 m