Professional Documents
Culture Documents
Website: www.searefico.com
SUBSIDIARIES
SUBSIDIARY
PHÓ TỔNG GIÁM ĐỐC PHÓ TỔNG GIÁM ĐỐC PHÓ TỔNG GIÁM ĐỐC
KINH DOANH KỸ THUẬT THI CÔNG GIÁM ĐỐC NHÂN SỰ KẾ TOÁN TRƯỞNG
BUSINESS DEPUTY TECHNICAL DEPUTY CONSTRUCTION DEPUTY HR & AD DEPT. CHIEF ACCOUNTANT
GENERAL DIRECTOR GENERAL DIRECTOR GENERAL DIRECTOR
BAN QUẢN LÝ DỰ ÁN PHÒNG QUẢN LÝ HỢP ĐỒNG PHÒNG VĂN PHÒNG ĐẠI DIỆN
PHÒNG KINH DOANH PHÒNG KỸ THUẬT PHÒNG SQA PROJECT MAN. UNITs PHÒNG MUA HÀNG & CHI PHÍ PHÒNG KẾ TOÁN MIỀN BẮC SEAREE ĐÀ NẴNG
CONTRACT & COST
HÀNH CHÍNH NHÂN SỰ
BUSINESS DEPT. TECHNICAL DEPT. SQA DEPT. (được thành lập khi bắt đầu PROCUREMENT DEPT. ACCOUNTING DEPT. REPRESENTATIVE OFFICE SEAREE
MANAGEMENT DEPT. HR & AD DEPT.
triển khai dự án) OF THE NORTH
BP. QUẢN LÝ
VẬT TƯ & THIẾT BỊ BP. KIỂM SOÁT BP. KẾ TOÁN
BP. AN TOÀN SỨC CÔNG TRÌNH KHỐI LƯỢNG BP. C&B TÀI CHÍNH
BP. ĐẤU THẦU
BP. BIM KHỎE & VỆ SINH MATERIAL & QUANTITY CONTROL C&B TEAM FINANCIAL
CƠ ĐIỆN EQUIPMENT MAN. TEAM
BIM TEAM MÔI TRƯỜNG ACCOUNTING TEAM
M&E TENDER TEAM TEAM
HSE TEAM
1448.71 1486.296
1500
1316.36
1185.608
1004.28
1000 930.44
500
0
2015 2016 2017 2018 2019 2020 2021 2022
-500
Revenue Profit
ISO CERTIFICATION CERTIFICATE OF MEMBERSHIP
VIETNAM GREEN BUILDING COUNCIL
ISO CERTIFICATION
Certificate of Construction Certificate of Fire Fighting
Activity Capability Activity Capability
2023
08
CONSTRUCT
240
FACTORY
280 317 192 06
SMART
LUXURY OFFICE
HOTELS & BUILDING WAREHOUSE
APARTMENT
RESORTS
2017 2018 2019
SCOPE OF WORK:
HVAC System;
Electrical System;
BMS,EMS System;
SCOPE OF WORK:
HVAC System;
Electrical System;
SCOPE OF WORK:
BMS,EMS System;
SCOPE OF WORK:
HVAC System;
Electrical System;
BMS System.
MEDIPHARCO PHARMACEUTICAL FACTORY
(WH0-GMP) – HUE
PHARMACEUTICAL JSC.
SCOPE OF WORK:
HVAC System;
Electrical System;
BMS System.
THE FACTORY PRODUCES 05 TYPES OF VACCINES
– DA NANG
SCOPE OF WORK:
HVAC System;
Plumbing System;
Fire Fighting System;
Compressed Air System;
Cold Storage System.
HOA LAM HOSPITAL - HCMC
EMPLOYER: VINCOM 2
CONTRUCTION LIMITED
SCOPE OF WORK:
Electrical System;
Fire Protection System;
Plumbing System;
HVAC System.
HCM UNIVERSITY MEDICAL CENTER HOSPITAL
EMPLOYER: VINAMILK
SCOPE OF WORK: EPC contractor
AS/ RS system (15,000 pallets);
Electrical power;
Fire Alarm & Fire Protection System;
Plumbing System;
Cold StoSystem;
Steel Structure rage System (4,600 m2);
ELV & Constructions.
COLD SMART WAREHOUSE – TIEN SON MILK
– BAC NINH
EMPLOYER: VINAMILK
SCOPE OF WORK: EPC contractor
Construction & Steel Structure Works;
AS/RS system (3500 pallets);
Cold storage;
Mechanical & Electrical system;
Control system (WMS);
Fire Alarm & Fire Protection System;
Electrical System;
Plumbing System.
COLD SMART WAREHOUSE – SAI GON MILK - HCMC
EMPLOYER: VINAMILK
SCOPE OF WORK: EPC contractor
Construction & Steel Structure Works;
AS/RS system (3500 pallets);
Cold storage;
Mechanical & Electrical System;
Control system (WMS);
Fire Alarm & Fire Protection System;
Electrical System;
Plumbing System.
VINAMILK BINH DINH SMART WAREHOUSE
EMPLOYER: VINAMILK
SCOPE OF WORK: D&B contractor
FRS system (5000 pallets);
Ambient storage
Mechanical & Electrical System;
Control system (WMS);
Fire Alarm & Fire Protection System;
Electrical System;
Plumbing System.
VINAMILK DAIRY FACTORY - BINH DUONG
EMPLOYER: VINAMILK
SCOPE OF WORK:
NH3 central refrigeration
System;
Chilled water System;
HVAC System;
Cooling Tower System;
Utilities piping System.
DIELAC II POWDER MILK- BINH DUONG
EMPLOYER: VINAMILK
SCOPE OF WORK:
NH3 central refrigeration system;
Chilled water system;
HVAC system;
Cooling Tower system ;
Utilities piping system;
Control system (SCADA);
Electrical system;
Cold Storage system.
VINAMILK LAM SON DAIRY FACTORY – THANH HOA
EMPLOYER: VINAMILK
SCOPE OF WORK:
NH3 central refrigeration system;
Chilled water system;
HVAC system;
Cooling Tower system;
Electrical system;
Cold Storage system.
VINAMILK DAIRY FACTORY – DA NANG
EMPLOYER: VINAMILK
SCOPE OF WORK:
NH3 central refrigeration system;
Chilled water system;
HVAC system;
Cooling Tower system;
Electrical system;
Electrical system;
Cold Storage system;
Fuel system;
Technological piping system.
VINASOY MANUFACTURING FACTORY – BINH DUONG
EMPLOYER: ARC
SCOPE OF WORK: Main contractor
ASRS system (37000 pallets);
Cold storage (-250 C);
Mechanical & Electrical system;
Control system (WMS);
Fire Alarm & Fire Protection system;
Electrical system;
Plumbing system.
NUMBER ONE HA NAM BEVERAGE FACTORY - HA NAM
(LEEDS-USGBC)
EMPLOYER: HANESBRANDS INC.
SCOPE OF WORK:
MVAC System (Packaged AC system)
Fire Alarm & Fire Protection System
Plumbing System
Compressed Air, LPG and Fuel System
Medium & Low Voltage System
External and Internal Lighting System
Earthling and Lightning Protection System
ELV System: Telephone & Data, Emergency
Warning & PA
Building Management and Factory Control
System (BMS)
VNG RESEARCH, DEVELOPMENT AND PRODUCING
SOFWARE CENTER
EMPLOYER: MEYLAND
SCOPE OF WORK:
Low voltage electricity
Communication system
MEPF Infrastructure
Plumbing System
OCEAN VALLEY TOURIST AREA – BINH THUAN
EMPLOYER: NOVALAND
SCOPE OF WORK:
Electrical System
Communication system
Lightning system.
Plumbing System
Fire Fighting System
MEPF Infrastructure
NOVAWORLD HO TRAM - THE TROPICANA
EMPLOYER: NOVALAND
SCOPE OF WORK:
Medium Voltage Power System
Power Supply System.
Communication system
Lightning system.
Plumbing System
Fire Fighting System
MEPF Infrastructure
SUN WORLD HON THOM NATURE PARK – PHU QUOC
EMPLOYER: SUNGROUP
SCOPE OF WORK:
Electrical System
Plumbing System
MEP Infrastructure
SUN PREMIER VILLAGE KEM BEACH RESORT
- PHU QUOC
EMPLOYER: SUNGROUP
SCOPE OF WORK:
HVAC System
Electrical System
Low Voltage System
Plumbing System
Fire Fighting System
MEPF Infrastructure
SUN PREMIER VILLAGE HA LONG BAY - QUANG NINH
EMPLOYER: SUNGROUP
SCOPE OF WORK:
HVAC System
Electrical System
Low Voltage System
Plumbing System
Fire Fighting System
MEPF Infrastructure
LANDSCAPE & FAÇADE LIGHTING – BA NA
EMPLOYER: SUNGROUP
SCOPE OF WORK:
• Landscape Lighting
• Façade Lighting
PREMIER RESIDENCES PHU QUOC EMERALD BAY - PQ
EMPLOYER: SUNGROUP
SCOPE OF WORK:
Electrical power
External and Internal Lighting System
HVAC system
Plumbing system
Sprinkler & Hydrant Fire Sprinkler System
PREMIER VILLAGE – PHU QUOC
EMPLOYER: APOLLO
CONSTRUCTION CONSULTANT LLC
SCOPE OF WORK:
HVAC system ;
Electrical System;
Fire Fighting System
Plumbing System;
MEPF Infrastructure.
CASTE GOLF CENTER – DESIGN PACKAGE(C/S & MEPF)
EMPLOYER: AB GROUP
SCOPE OF WORK:
Electrical power,
ELV system (CCTV, Tel & Data, Satellite
Master Arena,
HVAC system
Kitchen Equipment
Plumbing system (Cold & Hot)
Sprinkler & Hydrant Fire Sprinkler System
MEP for Lanscape
SONASEA VILLAS CONDOTEL – PHU QUOC
EMPLOYER : GELEX
SCOPE OF WORK:
HVAC system (VRV);
Fire Fighting System;
Electrical System;
ELV System;
Plumbing System;
Doors;
GATEWAY THAO DIEN - HCMC
EMPLOYER: NOVALAND.
SCOPE OF WORK:
Electrical System;
ELV System;
Air conditioning and ventilating
system;
Plumbing System.
GARDEN GATE- HCMC
CLIENT: NOVALAND.
SCOPE OF WORK:
• MEP system
WILTON- HCMC
CLIENT: NOVALAND.
SCOPE OF WORK:
Electrical System
ELV System
HVAC System
Plumbing System
SUN AVENUE- HCMC
CLIENT: NOVALAND.
SCOPE OF WORK:
Civil Work
FUSION PASTEUR – RENOVATION - HCMC
EMPLOYER: VINGROUP
SCOPE OF WORK:
Electrical power (MVSG & Genset)
Fire Alarm & Fire Protection System
Plumbing System
Lighting System
Air conditioning and ventilating
system
ELV System: Telephone & Data,
CCTV system, IPTV & PA
DIAMOND ISLAND - ZONE B - HCMC
EMPLOYER: VINAMILK
CAPACITY: 77 KWP
ROOFTOP SOLAR POWER – HEAD OFFICE – BAC LIEU
EMPLOYER: ARICO
CAPACITY: 1 MWP (Phase 1) + 600 Kwp (Phase 2)
ROOFTOP SOLAR POWER WORKSHOP
SEAREE DANANG
CLIENT: SEAREE
CAPACITY: 750 KWP
Thank you