CCB name
1. Project name: Optimize HC
2. Situation change: Kaizen Optimize HC project,…
3. Impact of the change: in term of quality, cost, delivery
4. Sponsor information and approval status: SLM reviewed and approved
5. Change type: Process / layout / materia;
6. Change area: NBB / FA / A11
1
Team information
No. Name Department Note
1 A IE CCB PIC / MIS,…
2 B AO
3 C QA-PQE Risk assessments
4 D Plan Make PON,..
5 E
2
Change details
1. Layout / Machine /…
Before
After
3
Change details
1. UPH / hand times details (Before/After): How to make sure OK after change
For CCB optime HC/Layout
Station Hand Station Hand
times times
A A
B B
C C
For CCB change process
Before: manual, Screw force,… After: Auto, Screw force,…
4
Risk assessment
No Risk point Action to cover Data need
collects / PIC
1 OP skip operation: CAPT/DL Can detect by tester/ follow A - MTE
tester results,..
2 Screw deformed/ uncompleted,… Add 1 HC Q after screw station AO- arrange HC,
QA training
3 Scrap
4 Hold PON
Need meeting with related team to do risk assessment, especial need PQE confirm risk related to quality
1. Evaluation the RPN point in pFMEA (Before – After)
5
Plan trial (CCB – Pre)
No Item Contents details Dealine PIC
follow/coll
ect
1 Meeting with related team Meeting minute before trial CCB PIC
2 Prepare Arrange 2 HC, Line, PON AO/Plan/WH
line/HC/Material/machine/jig 2000pcs,….
3 Prepare MIS/training Temporary MIS/Training OP/ IE/training
UPH RU 80%,…
4 Arrange HC VQ, 1 HC VQ after screw first AO arrange
200pcs,….. HC, QA
training
5 Handle FGs Ship normal for FGs OK, Scrap AO-..
FGs NG (For AO/IE,…)
6 Update MRF, NRF,… Update during trial, share after MTE,…
complete
7 Summary and Book Final CCB Show CCB – Pre results IE,…
6
Results trial
No Item Results PIC Status
1 UPH Achieve IE done
2 Cosmetic issue 1NG/2000 AO done
3 Yield Before 99%, After 99% MTE done
4 FGs Scrap 2pcs AO done
5 Material,…
Decisions: Trial OK, can apply for MP
Plan Apply for MP: from 08-Dec,…. (Send email official to all team)
7