7 QCGR RE ARRANGE KEEP IS SAMPLE SS & QCGR Reduce Cust Complaint and PSI
GOLD SEAL MORE PROPER Fail
8 QCGR TO IMPROVE PQV SKILL & DEFECT QCGR Reduce Customer Complaint
JUDGE TO HAVE SAME
PERCEPTION
Dec 2016 RFT (Standardize STD Work) 9.6% 50% 1. Eliminate wire usage only as
chart
2. Single Identification at CF
Wire-Reduce Confusing
Nov'16 %Pre sewing Quality Failure 0.17% 0.12% 1. Reduce Potensial Defect to
in Sewing Area Sewing
2. Improve Skill
Nov'16 % Competence Full Fillment/ 58% 75% Improve PSI Skill Capability
Gap Competence of Key
Position
Nov'16 % Availability of PP and SS 98.70% 100.00% On Time QCO
Sample
Nov'16 * 1ST Pass PP Sample 96.00% 99.00% 1. Reduce Potential Defect to PSI
N/A Quality
N/A Quality
N/A Quality
N/A Quality
16.5 Jt Quality
N/A Quality
N/A Quality
N/A Quality
N/A Quality
Moulding machine
Eliminate rework and improve
6 PRESEWING standardization & TPM Moulding
Improvement productivity
Material
12 PRESEWING Schedule accuracy Improvement Improve process flow
Handling
Practical
Project Project Project
Focus/Group Complexity (L,M,H) /Statistical
Type/Approach Code Duration
Problem
Trimstore, Spreading,
Medium Practical Kaikaku A 4 Months
Material Handling
Electrical, Pre-Ass,
Medium Practical Kaikaku B 6 Months
Production, QCGR
Material Handling,
Medium Practical Kaizen H 1 Month
Production, Packing
Material Handling,
Medium Statistical Yellow Belt D 1 Month
Production, Trimstore, PA
Investme
Project Start KPI Before After Benefit
nt
1. Spreading attainment
2. Op skill matrix 1. 90% 1. 90%
Nov-16 2. N/A 2. 100% Improved productivity
3. Stopped cutting due to no
3. 370 min 3. 0 min
input
1. Cutting attainment 1. 91% 1. 100%
Nov-16 Improved productivity
2. Op skill matrix 2. N/A 2. 100%
1. 91%
1. Cutting attainment 1. 100% Improved productivity, reduced
Nov-16 2. 1170
2. Production Lost Time min 2. 0 min production Lost Time
Clasification
Cost
Quality
Quality
Cost
Cost
Quality
Quality
Cost
Quality
Quality
Cost
Cost
Project Area
No. Dept/Divisi Project Name Project Goal
(Core)
OTD
OTD
Quali
ty -- Q
Chec
k1 OTD
Cost C
--
OTD
Chec
OTD
k2
OTD
--
Chec
k3
Practical Project
Project Area Complexity Project Project
No. Dept/Divisi Project Name Project Goal Focus/Group Project /Statistical Type/Appro Project Start KPI Before After Benefit Investment Clasification
(Core) (L,M,H) Code Duration
complexity & Problem ach
Project Headcount
Project Name Area Goal Focus Group Nature Type Duration Start Month KPI Before After Benefit Investment Clasification reduction
VMB Mismatch Report Plan- order monitroing and maintaining supply Brands health and
1 Planning management pipe PLAN Low practical Kaizen-CS K 1 month Sep-16 maximize Sales N/A OTD N
PBUG DIF 92% 98%
Create Weekly meeting all planning leader monitroing and maintaining supply
for mismatch and late order action Plan- order pipe Brands health and
2 Planning management PLAN Low Statistical White Belt K 1 month Oct-16 maximize Sales N/A OTD N
Create System alert for sample new style Plan- order Fulfill PBUG Quality standard on smoothing
3 Planning new colour management time PLAN, PDD, MKT Low Statistical Kaizen-CS K 2-3 months Nov-16 manufcture process N/A OTD N
Visibility of style/col with un std LT Plan- order to maintain supply stability smoothing
4 Planning (sodokan) management PBI/PBUG PLAN, PDD, MKT Medium Statistical Kaizen-CS K 4-5 months Jan-17 manufcture process N/A OTD N
Simplify process,
VSM Seasonal Order Consolidation and Avoiding human error when improve planning
Placement seasonal order raised accuracy and
OE Placed Inside LT 80% 95% ontime eliminate System
Plan- order waste/rework due to amendment in
9 Planning management PLAN High Practical kaikaku-CF D 6-12 months Sep-16 typo/error PBUG OTD N
Plan- Prod
Create MP for Machine schedulling, for machine req. plan PLAN, PROD, PDD, New system
14 Planning mechanic Mech Medium Statistical White Belt K 4-5 months Jul-16 Improve the visibility using SQL OTD N
Simplify process,
Automation Style change project Avoiding human error PLAN Jul-16 improve planning
accuracy and
Style Change eliminate
Plan- Prod Deviation 52 0 waste/rework due to New system
15 Planning schedulling Medium Practical Kaizen-CS D 4-5 months typo/error using SQL OTD N
Simplify process,
Create alignment process with related helping smoothing plan for every Jan-17 improve planning
dept for new style prod. Sch new style plan to run in production accuracy and
eliminate
Plan- Prod waste/rework due to New system
16 Planning schedulling PLAN, PDD, MKT Medium Practical Kaizen-CF D 4-5 months typo/error using SQL OTD N
Improve production
Product family project Plan- Prod to improve prod. Efficiency plan PLAN, PROD, PDD, eff, increase PBI New system
17 Planning schedulling, prod Mech High Statistical Yellow Belt B 6-12 months May-16 capacity and sales using SQL C N
Prod. Eff Plan 79.80% 84%
Set up std efficiency for each style to improve prod. Attaintment and Improve production
including learnig curve Plan- Prod DIFOT eff, increase PBI New system
18 Planning schedulling, prod PLAN, PROD, PDD Medium Statistical White Belt B 4-5 months Dec-16 capacity and sales using SQL C N
eliminate
Daily error checking process Plan- Prod to avoid waste due to human error PLAN Low practical Kaizen-CS Zero SKU error in waste/rework due to New system
19 Planning schedulling D 1 month Apr-16 system 96.15 0 error typo/error using SQL C N
Project
complexity & Project Headcount
Project Name Area Goal Focus Group Nature Type Duration Start Month KPI Before After Benefit Investment Clasification reduction
PLAN,Packing, Improve planning
PNP Accuracy and utilization Plan- Shipment to improve the PNP vol accuracy Exim Low Statistical Kaizen-CS accuracy and reduce New system
20 Planning schedulling, Exim D 1 month May-16 Shipment Utilization shipment cost using SQL C N
88% 95%
plan
Create std process for shipment utilization PLAN,Packing, Improve planning
plan Plan- Shipment to improve shipment utilization Exim Low practical White Belt accuracy and reduce
21 Planning schedulling, Exim B 1 month Oct-16 shipment cost N/A C N
Simplify process,
Output tracker for shipment to avoid shipment revision in ex fact PLAN, Prod Admin Low practical kaizen-cs improve planning
day accuracy and
eliminate
Plan- Shipment waste/rework due to New system
22 Planning schedulling, Exim D 2-3 months Dec-16 typo/error using SQL C N
automation and
Replace current capacity requirement online process
planning system to be more systematic, improve the accuracy, efficiency PLAN amongs processes and
connected with production output, and reducing people dependent depts, improve
easier/simple and accurate Loading vs Budget 100% 100%
company accuracy
and eliminate NEW ERP
Plan-Capacity waste/rework due to system (Euro Y (approx. 2 from
25 Planning Plan High Statistical Green Belt K 6-12 months Oct-16 typo/error 150K) C planning)
Plan-Capacity to improve the cpacity and improve planning
Seasonal volume monitoring budgeting plan accuracy
26 Planning Plan Plan, PBUG Ops High Statistical Yellow Belt D 6-12 months Dec-16 accuracy N/A C N
Trainings and improving skill matrix to improve capability and
27 Planning PLAN achievement PLAN High Statistical kaizen-cs B 6-12 months Jan-17 # of VPR 1 0 Improving skill matrix N/A Q N
to improve capability and # of Kaizen
Create Kaizen monitoring and rewarding achievement
28 Planning PLAN PLAN Low practical White Belt B 1 month Oct-16 Participation 100% 100% Improving skill matrix N/A Q N
Skill matrix monitoring and Gap to improve capability and
29 Planning competency improvement system PLAN achievement PLAN High Statistical Yellow Belt B 6-12 months Mar-17 # of Coaches 0 5 Improving skill matrix N/A Q N
Reduce 2-4 packs LT from 28/21 to 14 days PLAN, Prod, Average LT per
for all PLC (FMDS speed @28) to reduce PBUG safety stock
30 Planning Packing PLAN, Prod, MKT Medium Practical kaikaku-CF H 4-5 months Jul-17 category 28/19/14 26/17/12 LTR TBA C N
Improve process
Create cut actualise system and process Plan- Inventory to improve TS and Prod stability PLAN, Cutting stability among some New system
31 Planning control, TS Medium Practical Yellow Belt B 4-5 months Nov-16 WIP Stock 6 5 processes using SQL C N
Create Std reviewing MOQ based on BOD Plan- Inventory PBUG Stock Turn
process to reduce PBUG safety stock
32 Planning control, Prod PLAN, prod Medium Practical Yellow Belt B 4-5 months Sep-16 over<2 $1800K $500K improve ST N/A C N
Create visible diagram parking root cause Plan- Inventory To reduce parking in stock
33 Planning control PLAN Low practical White Belt K 1 month Nov-16 improve ST N/A C N
parking in stock 3694 1200
Create std process in action plan reviewing
and close reraise cuts monitoring Plan- Inventory To reduce parking in stock PLAN, Pur and
34 Planning control, packing MKT Medium Statistical kaizen-CS B 4-5 months Jan-17 improve ST N/A C N
Amend the std process of dummy Plan- Inventory To reduce RM stock and or RM RM stock
automation to link it with capacity plan control, shortage PLAN, purchasing collaboration
36 Planning purchasing Medium Practical Kaizen-CS K 4-5 months Oct-16 project in purchasing in purchasing improve ST N/A C N
Collaboration with DA to improve forecast Plan, Inventory To reduce RM stock and or RM PLAN, purchasing
RM stock
accuracy Control, shortage collaboration
38 Planning Purchasing High Statistical Yellow Belt D 4-5 months Mar-17 project in purchasing in purchasing improve ST N/A C N
Project Area
No. Dept/Divisi Project Name Project Goal
(Core)
12 PDD Set up std packing size set sample PDD Keep the sample tidy and secure
pack
19 PDD Develop new bullet for sample PDD Improve sample quaility
Practical
Project Project Project
Focus/Group Complexity (L,M,H) /Statistical
Type/Approach Code Duration
Problem
6 months/
PDD sampe marker Medium Statistic Yellow belt B
batch
PDD, Electrical, MD, TS, MEC, Medium Statistic Yellow belt K 4 Months
IT, QCGR
100% accuracy
Dec-16 Std work workablity na No rework
and ontime
Nov-16 Handover ontime and 94% 100% Dev product feasible style
quality to production
N/A OTD
N/A Quality
N/A Cost
Quality
Man power,
machine, OTD
space
N/A Quality
N/A Quality
N/A Quality
N/A Quality
N/A Quality
N/A Quality
N/A Quality
N/A Quality
N/A Quality
N/A Cost
N/A Quality
OTD
Database for
sample OTD
planning, TV.
$50.00 Quality
Project Area
No. Dept/Divisi Project Name Project Goal
(Core)
1 HRGA, SM, ELEC Training BEI (Behaviour Event Recruitment Adding interview skill
Interview)
2 HRGA, SM, ELEC Referal Program Recruitment Gain more potential Candidate
3 HRGA, SM, ELEC Sourcing Project Recruitment Gain more potential Candidate
4 HRGA, SM, ELEC Maintenance Doc. Update All Dept Using Right Document
5 HRGA, SM, ELEC Optimize First Aider Responbillity SMS Reduce Time
6 HRGA, SM, ELEC HRIS Integration HRGA SMS On time Up to Date & System
Integration
7 HRGA, SM, ELEC Maintenance Test Lab By SMS On Time Test Lab
System(MOU)
8 HRGA, SM, ELEC Create Check List Preventing Cutting Reduce Down Time
Maintenance Process Machine
9 HRGA, SM, ELEC Create Complete Parts Machine Electrical Reduce Down Time
10 HRGA, SM, ELEC Create Check List For Lighting Electrical Support Quality & Health Issue
11 HRGA, SM, ELEC Simplify & Kanban System For L&D Reduce:
Training Material -Time
-Cost
12 HRGA, SM, ELEC Train The trainers (For Operator L&D -Reduce Time
Induction Training)(One Trainer -Keep In Quality
For All Topic)
13 HRGA, SM, ELEC Training Master Plan & Yearly L&D -Reduce Time
Calendar -Control Budget
14 HRGA, SM, ELEC Evaluation Training System L&D -Keep In Quality
-Reduce Time
-Reduce Cost
15 HRGA, SM, ELEC Grading Structure & Salary All Dept Easier To Define Salary Level
Grading
16 HRGA, SM, ELEC Improving Utility & Facility, All Dept Emp Satisfaction
Services
17 HRGA, SM, ELEC Building Competency All Dept Improve:
-Working On Time
-Working Quality
-Saving Cost
Practical
Project Project Project
Focus/Group Complexity (L,M,H) /Statistical
Type/Approach Code Duration
Problem
All Dept. (Manager Level) High Practical Kaikaku B 4 Months
Dec-16 - Lead time 91,11% 95,89% Increasing user interview skill for
- Quality N/A N/A selecting the right candidate
Nov-16 -Percetage of Execution 100% 100% -As Career Path for People Dev
Training -Improve Quality of Material
-Percentage Achievement Delivery
Target Evaluation Target N/A 100% -Saving Time For Current Trainer
Score -OTD Induction Trainer
N/A Quality
N/A On time
Delivery
N/A On time
Delivery
N/A Quality
N/A On time
Delivery
N/A Quality
N/A On time
Delivery
N/A Quality
N/A Quality
N/a Quality
N/a Cost
N/a Quality
N/A Cost
N/a Quality
N/A Quality
N/A Quality
N/A Quality