Professional Documents
Culture Documents
Oee 4
Oee 4
Rest of Q1 –
o Needed training
finalize for Tech &
Equip Eng.
ww45 – ww48.1 – JAN end, 2019 – o Plan next level
Draft OEE initiatives Identified all the project leads o Key deliverables from the automation input with
Conceptualization from each sites. workshops will be shared IT/ITEC
Initial 1:1 discussion, on-boarding, with T&O GMs.
meet-greet and plan sharing done. o Propose to integrate it as
ITEC & IT shows their interest as key Site-KPI.
enabler for this initiative