Professional Documents
Culture Documents
Civil Engineering: Date: 20XX - XX
Civil Engineering: Date: 20XX - XX
01 02 03 04 05
Project Overview Architectural design Structural design Design summary
Introduction
Theme color makes Theme color makes Theme color makes Theme color makes Theme color makes
PPT more convenient. PPT more convenient. PPT more convenient. PPT more convenient. PPT more convenient.
Plastering
is a process of applying one or more coats of mortar to a concrete surface, brickwork, stone masonry or lathing.
It must be durable such that it resists the penetration of moisture and should be able to weather uniformly. It
should also be pleasing in appearance. These properties depend upon materials used, composition of mix, and
degree of mechanical bond between the plaster and the backing surface and workmanship.
One
STEPS FOR PLASTERING :
STEP 1 : PREPARATION OF SURFACE:-
Keep all the mortar joint of wall rough.
Brush out all the dust and loose mortar
Surface should be properly cured and dry surface.
STEP 2: HACKING :-
Hacking of concrete surface can start after curing for 1
day. It is easier to hack at this stage.
The Hacking hammer is brought in contact with the
concrete surface with an impact, such that only a small
portion of well finished concrete surface is chipped off.
Also we can use a mechanical device instead of
hammer.
The indent caused by such an action should be
approximately 25 mm in length by visual observation
and not more than 2 to 3 mm in depth. Very deep
indents on concrete member can affects its strength.
NOTE * : INDENT – mark caused during hacking on
concrete surface due to impact.
•STEP 3: INSTALLATION OF BUTTON MARKS:-
• Button marks for Plastering should be fixed and checked. The button mark should be at
not more than 2m from each other in both horizontal and vertical direction.
• Button marks are installed using right angle triangle 📐 and string .
• Button marks on opposite wall should be fixed exactly opposite of each other.
• Vitrified tiles
• Kota Stone
• Ceramic tiles
• Pegasus Beige
• Terracotta tiles
• Terrazzo Eton Beige
• STEPS FOR TILING :-
• Generally , the mix prepared for tiling can be 1:4 ,1:5 or 1:6 , as per the
• requirements.
• Mechanical mixing ( Mixer) is preferred for mixing instead of hand
• mixing as proper mixing of cement + sand + water takes place in the
• mixer.
• Also , cement slurry ( 0.6/0.8 – 1 ) is prepared and used during tile
• fixing by spreading between mix and tile. This cement slurry acts as a
• thin , smooth layer that fills gaps and enhances tile adhesion.
• These materials ensure proper alignment and provide a strong base for
• tiling application.
• For the floor tiles ( 600*600) , cover – up-to 40 mm and 3 mm spacer
• are used.
The tiles along the border will be fixed after the full tiles have been fixed.
The level of tiles should be checked every time a tile is laid using spirit level. Any
undulation can be leveled using a rubber hammer.
A skirting of 10-12 cm height is provided with the tiles , on the walls as per the
requirements.
At the end , the floor tile grouting is done and different – different chemicals are used.
Example : Tile joint filler and tile joint additive ( ROFF).
After the Grouting , sufficient curing should be done for a minimum of 3 days and then
protection sheets are laid to prevent the tiles from damaging .
Introduction
01
Your content is hit here, or by copying your text, in this box Your content is hit here, or by copying your text, in this box
After you hit your content here, or by copying your text, After you hit your content here, or by copying your text,
choose to paste your content in this box By copying your choose to paste your content in this box By copying your
text, choose to paste text, choose to paste
02
Your content is hit here, or by copying your text, in this box Your content is hit here, or by copying your text, in this box
After you hit your content here, or by copying your text, After you hit your content here, or by copying your text,
choose to paste your content in this box By copying your choose to paste your content in this box By copying your
text, choose to paste text, choose to paste
Introduction
Title text
Your content is hit here, or by copying your text, in this box After you hit your content here, or by
copying your text, choose to paste your content in this box By copying your text, choose to paste your
content in this box after hitting here, or by copying your text, choose to paste your content in this box
after hitting here, or by copying your text, in this box Choose Paste in this box After you hit your content
here, or by copying your text, choose
01. 02.
Please enter your Please enter your
Your content is hit here, or by copying your text, in this box After you hit your Your content is hit here, or by copying your text, in this box After you hit your
content here, or by copying your text, choose to content here, or by copying your text, choose to
Project Overview
01 02 03
Title text Title text Title text
After you hit your content here, or by copying your After you hit your content here, or by copying After you hit your content here, or by copying
text, choose paste in this box your text, choose paste in this your text, choose paste in this
Project Overview
Please enter
your
Your content is hit here, or by copying your text, 20XX - 20XX - 20XX - 20XX -
in this box After you hit your content here, or by
copying your text, choose to paste your content After you hit your content here, or by After you hit your content here, or by After you hit your content here, or by After you hit your content here, or by
in this box After copying your text, select Paste copying your text, choose copying your text, choose copying your text, choose copying your text, choose
in this box
Architectural design
Title text
Title text
Your content is hit here, or by copying your text, in this box After
you hit your content here, or by copying your text, choose to paste
your content in this box By copying your text, choose to paste
your content in this box after hitting here, or by copying your text,
choose to paste your content in this box after hitting here, or by
copying your text, in this box Select Paste in this box
Please enter Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying
your text, choose to paste your content in this box By copying your text, select Paste in this box After
Your title text hitting your content here, or by copying your text, Select
Title text Title text Title text Title text Title text
After you hit your After you hit your After you hit your After you hit your After you hit your
content here, or by content here, or by content here, or by content here, or by content here, or by
copying your text copying your text copying your text copying your text copying your text
Structural design
Title text
After you hit your content here, or by copying your text,
Please enter
choose paste in this box
Your content is hit here, or by copying your text, in this box After you hit your
content here, or by copying your text, choose to paste your content in this box By
copying your text, select Paste in this box After hitting your content here, or by
copying your text, Select Paste in this
Design summary
Please enter your title text
When you copy & paste, choose "keep text only" option.
Design summary
Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your content in this
box After copying your text, select Paste in this box
Your content is hit here, or by copying your text, in this box choose paste After you hit your content here,
or by copying your text, choose paste in this box
Design summary
Your content is hit here, or by copying your text, in this box Title text Title text