Professional Documents
Culture Documents
Desig of Box Culvert For Railway
Desig of Box Culvert For Railway
3.5 m x 3.5 m
Materials
Grade of concrete
Grade of steel
Max aggregate size,mm
Soil , Degrees
Soil , Degrees
Soil density, Kn/m
M
Fe
Dimensions (Input)
Clear span of box, m
Clear height of box, m
Barrel Length of bridge
Ballast cushion
Earth cushion
Clear Cover top
Clear Cover side
Thickness of wearing coat
Dimensions (Output)
Thickness of top & Bottom slab
Thickness of side walls
Effective span
Effective height
Overall span of bridge
Overall height of bridge
Size of haunch
6.67
Dispersion width
2.745+Bst cu+le/2
35
415
20
30
10
18
3.50
3.50
6.85
m
m
m
mm
mm
mm
mm
mm
2000
50
60
100
Enter Value
B
0.35
0.35
3.85
3.95
4.2
4.3
350
DFC Loads
625.63
KN
843.03
KN
0.962
0.305
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
#DIV/0!
#DIV/0!
#DIV/0!
Case-I
8.75
8.75
8.18
0.40
43.20
43.20
0.00
0.00
12.25
1.11
73.44
86.80
86.80
E'
Earth pressure
Ka
22.91
1.11
24.02
Cos 2
Cos 2 Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
19.575
55.125
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-108.11
-111.32
-111.32
Top U R/c
MB
-85.71
-87.83
-87.83
-87.83
Btm I R/c
MF
97.23
102.12
102.12
Top I R/c
MG
75.12
81.10
81.10
Side O R/c
ME
0.00
-6.98
-6.98
-6.98
Side I R/c
ME'
11.69
9.02
9.02
11.69
81.10
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
81.10
102.12
111.32
6.98
87.83
11.69
NA
NA
NA
NA
Total
Ast Req
821.85
1046.02
570.97
700.00
525.00
700.00
420.00
420.00
523.01
523.01
6249.86
Dia req
10.23
11.54
12.06
13.35
11.56
13.35
8.96
8.96
11.54
11.54
Sheer-V
136.72
174.55
117.04
Asv Req
166.18
183.73
v
0.48
0.61
0.42
Dia Req
6.51
6.84
Pt
0.28
0.40
0.37
spacing
100
100
200
200
200
200
150
150
200
200
Dia pro
10
12
12
16
12
16
10
10
12
12
Total
Ast pro
785
1131
565
1005
565
1005
524
524
565
565
7236
spacing-L
150
150
vc
0.45
0.50
0.50
Spacing-W
200
200
s x vc
s
1.15
0.52
1.15
0.57
1.21
0.60
Dia Pro Ast Pro
8
251.33
8
251.33
g3
166.18
6.51
150
200
251.33
Per sqm
3440.61
Per sqm
5026.55
Joint
A
Mf AB
-72.95
Distribution Factors
Member Relative stiff Sum
AD
0.0111
0.0220
AB
0.0109
D.F
0.5064
0.4936
BA
BC
0.4936
0.5064
0.0109
0.0111
Mf CB
107.22
0.0220
Mf CD
-71.84
Mf DC
72.95
Mf DA
-136.89
Mf AD
136.89
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.5064
136.89
-32.38
16.19
-12.62
6.31
-6.29
3.14
-3.14
1.57
-1.57
108.11
B
0.4936
-72.95
-31.56
8.73
-12.30
6.11
-6.13
3.06
-3.06
1.53
-1.53
-108.11
0.4936
71.84
17.46
-15.78
12.21
-6.15
6.13
-3.06
3.06
-1.53
1.53
85.71
C
0.5064
-107.22
17.92
-8.96
12.53
-6.26
6.29
-3.14
3.14
-1.57
1.57
-85.71
0.5064
107.22
-17.92
8.96
-12.53
6.26
-6.29
3.14
-3.14
1.57
-1.57
85.71
D
0.4936
-71.84
-17.46
15.78
-12.21
6.15
-6.13
3.06
-3.06
1.53
-1.53
-85.71
MF
205.34
108.11
97.23
MG
160.83
85.71
75.12
ME
108.60
-96.91
ME'
108.60
-96.91
0.4936
72.95
31.56
-8.73
12.30
-6.11
6.13
-3.06
3.06
-1.53
1.53
108.11
(A)
0.5064
-136.89
32.38
-16.19
12.62
-6.31
6.29
-3.14
3.14
-1.57
1.57
-108.11
1
1
2
2
1
2
0
0
0
0
10
10
12
12
10
12
8
8
8
8
2
2
3
3
2
3
1
1
12
12
16
16
12
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
1
1
10
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
4
5
6
0.59
0.74
0.85
2
3
2
a
b
0.0165232
0.0165232
0.0165232
0.0169393
0.0165232
0.0169393
c
-361.05
-361.05
-361.05
-361.05
-361.05
-361.05
285566.89
359586.87
401148.8
25135.355
305498.64
42117.293
30
0.36
0.42
0.53
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.63
0.8
0.91
0.67
0.85
0.97
0.7
0.89
1.01
0.74
0.93
1.06
0.25
0.50
0.25
0.44
0.56
0.44
0.45
0.50
10
0.50
0.56
2
3
0.25
0.50
0.44
0.56
0.50
Mf AB
-72.95
Mf CB
107.22
Mf CD
-46.08
Mf DC
55.78
Mf DA
-136.89
Mf AD
136.89
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach)
(D)
0.5064
136.89
-32.38
20.54
-14.82
7.92
-7.92
3.69
-3.69
1.98
-1.98
110.23
Non-Sway
1.09
Sway
111.32
Final M
B
0.4936
-72.95
-31.56
8.73
-14.45
7.71
-7.72
3.59
-3.59
1.93
-1.93
-110.23
-1.09
-111.32
0.4936
71.84
17.46
-15.78
15.43
-7.22
7.19
-3.86
3.86
-1.80
1.80
88.92
-1.09
87.83
C
0.5064
-107.22
17.92
-15.48
15.83
-7.34
7.37
-3.96
3.96
-1.84
1.84
-88.92
1.09
-87.83
0.5064
107.22
-30.96
8.96
-14.67
7.92
-7.92
3.69
-3.69
1.98
-1.98
70.54
1.09
71.63
D
0.4936
-46.08
-30.18
20.02
-14.30
7.72
-7.72
3.59
-3.59
1.93
-1.93
-70.54
-1.09
-71.63
0.4936
55.78
40.04
-15.09
15.44
-7.15
7.19
-3.86
3.86
-1.80
1.80
96.20
-1.09
95.12
MF
205.34
103.22
102.12
MG
160.83
79.73
81.10
ME
108.60
-99.57
ME'
76.40
-83.37
Hor Reaction at A
Hor Reaction at D
-5.54 R2L
6.67 L2R
1.13 R2L
(A)
0.5064
-136.89
41.08
-16.19
15.84
-7.41
7.37
-3.96
3.96
-1.84
1.84
-96.20
1.09
-95.12
Check:
Final Hor Rcn at A
-6.10 R2L
6.10 L2R
B
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5064
0.00
-1.52
-0.76
0.76
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.52
-1.09
0.5064
0.00
-1.52
-0.76
0.76
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.52
-1.09
0.79 L2R
0.79 L2R
1.58 R2L
D
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
(A)
0.5064
0.00
-1.52
-0.76
0.76
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.52
-1.09
Sway of 1.58
Sway of 1.13
Mf AB
-72.95
Mf CB
107.22
Mf CD
-46.08
Mf DC
55.78
Mf DA
-136.89
Mf AD
136.89
B
0.4936
-72.95
-31.56
8.73
-14.45
7.71
-7.72
3.59
-3.59
1.93
-1.93
-110.23
-1.09
-111.32
0.4936
71.84
17.46
-15.78
15.43
-7.22
7.19
-3.86
3.86
-1.80
1.80
88.92
-1.09
87.83
C
0.5064
-107.22
17.92
-15.48
15.83
-7.34
7.37
-3.96
3.96
-1.84
1.84
-88.92
1.09
-87.83
0.5064
107.22
-30.96
8.96
-14.67
7.92
-7.92
3.69
-3.69
1.98
-1.98
70.54
1.09
71.63
D
0.4936
-46.08
-30.18
20.02
-14.30
7.72
-7.72
3.59
-3.59
1.93
-1.93
-70.54
-1.09
-71.63
0.4936
55.78
40.04
-15.09
15.44
-7.15
7.19
-3.86
3.86
-1.80
1.80
96.20
-1.09
95.12
MF
205.34
103.22
102.12
MG
160.83
79.73
81.10
ME
108.60
-99.57
ME'
76.40
-83.37
Hor Reaction at A
Hor Reaction at D
-5.54 R2L
6.67 L2R
1.13 R2L
(A)
0.5064
-136.89
41.08
-16.19
15.84
-7.41
7.37
-3.96
3.96
-1.84
1.84
-96.20
1.09
-95.12
Check:
Hor Reaction at A
-6.10 R2L
6.10 L2R
Hor Reaction at D
B
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5064
0.00
-1.52
-0.76
0.76
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.52
-1.09
0.5064
0.00
-1.52
-0.76
0.76
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.52
-1.09
0.79 L2R
0.79 L2R
1.58 R2L
D
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
0.4936
3.00
-1.48
-0.74
0.74
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.52
1.09
(A)
0.5064
0.00
-1.52
-0.76
0.76
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.52
-1.09
Sway of 1.58
Sway of 1.13
Concrete
15
20
25
30
35
40
Steel
415
500
550
Agg size
10
12.5
20
25
40
Rails
52
60
3.50
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
9.5
1458.34
1458.34
1458.34
1458.34
9.5
1718.04
1718.04
1718.04
1718.04
10.0
1511.16
1511.16
1511.16
1511.16
10.0
1759.49
1759.49
1759.49
1759.49
819.67
878.08
843.03
3.5
4.0
572.12
648.56
625.63
4.0
4.5
6mx4m
M
Fe
35
415
20
30
10
18
Dimensions (Input)
Clear span of box, m
Clear height of box, m
Barrel Length of bridge
Ballast cushion
Earth cushion
Clear Cover top
Clear Cover side
Thickness of wearing coat
6.00
4.00
6.85
300
2000
50
60
150
m
m
m
mm
mm
mm
mm
mm
Dimensions (Output)
Thickness of top & Bottom slab
Thickness of side walls
Effective span
Effective height
Overall span of bridge
Overall height of bridge
Size of haunch
Dispersion width
2.745+Bst cu+le/2
0.6
0.5
6.50
4.75
7
5.35
600
8.30
Enter Value
DFC Loads
EUDL for bending moment fm table
1045.16
KN
1266.16
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Superimposed dead load (SIDL)
Rails & Sleepers
Ballast & Earth
0.790
0.211
Case-I
15
15
7.98
0.69
2.26
48.96
51.22
2.4.2.1 a & b
5.51
6.67
Earth pressure
36.73
44.50
Ka
21.00
1.94
87.08
73.46
11.02
110.02
194.50
22.35
1.94
24.28
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
23.4
66.15
At top
14.44
At Bottom
40.81
Earth pressure due to live & dead load surcharge
S, live t/m
162.50
V, dead t/m
43.68
Surcharge pressure
At top
21.20
At Bottom
12.00
Earth pressure (with load factors)
At top
24.54
At Bottom
69.38
Earth pressure & Surcharge Pressure (with load factors)
At top
60.58
At Bottom
89.78
kn/m2
kn/m2
Kn/m2
Kn/m2
233.78
273.02
Base
kn/m2
kn/m2
kn/m2
kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-432.13
-438.74
-307.30
Top U R/c
MB
-368.70
-374.45
-243.00
-374.45
Btm I R/c
MF
723.32
737.69
422.99
Top I R/c
MG
658.49
673.73
359.03
673.73
Side O R/c
ME
-188.38
-232.18
-100.73
-232.18
Side I R/c
ME'
0.00
0.00
0.00
0.00
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
Ast Req
673.73
3857.16
737.69
4270.86
438.74
2130.26
232.18
1580.35
374.45
1244.57
0.00
1000.00
NA
600.00
NA
720.00
NA
2135.43
NA
2135.43
Total 19674.06
Dia req
22.16
23.32
23.29
20.06
17.80
15.96
10.70
11.73
23.32
23.32
spacing
100
100
200
200
200
200
150
150
200
200
Dia pro
25
25
25
20
20
16
12
12
25
25
Total
Sheer-V
562.76
627.11
203.46
Asv Req
326.68
439.33
166.18
6214.63
v
1.05
1.17
0.48
Dia Req
9.12
10.58
6.51
Pt
0.92
0.92
0.37
spacing-L
150
150
150
vc
0.68
0.52
0.50
Spacing-W
200
200
200
s
0.98
0.98
1.11
Dia Pro
10
12
8
Per sqm
Joint
A
Distribution Factors
Member Relative stiff Sum
AD
0.0332
0.0595
AB
0.0263
D.F
0.5581
0.4419
BA
BC
0.4419
0.5581
0.0263
0.0332
Mf CB
684.79
0.0595
Mf CD
-135.86
Mf DC
146.84
Mf DA
-770.30
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
A
0.5581
0.4419
770.30
-146.84
-347.93
-275.53
173.96
121.30
-164.77
-130.49
82.39
64.29
-81.85
-64.82
40.93
32.35
-40.90
-32.39
20.45
16.19
-20.45
-16.19
432.13
-432.13
B
0.4419
135.86
242.59
-137.76
128.57
-65.24
64.71
-32.41
32.38
-16.19
16.19
368.70
C
0.5581
-684.79
306.34
-153.17
162.36
-81.18
81.71
-40.86
40.89
-20.44
20.45
-368.70
0.5581
684.79
-306.34
153.17
-162.36
81.18
-81.71
40.86
-40.89
20.44
-20.45
368.70
0.4419
-135.86
-242.59
137.76
-128.57
65.24
-64.71
32.41
-32.38
16.19
-16.19
-368.70
D
MF
1155.45
432.13
723.32
MG
1027.19
368.70
658.49
ME
212.03
-400.41
ME'
212.03
-400.41
0.4419
146.84
275.53
-121.30
130.49
-64.29
64.82
-32.35
32.39
-16.19
16.19
432.13
Ast pro
4909
4909
2454
1571
1571
1005
754
754
2454
2454
22835
a
4
4
4
4
3
2
1
1
20
20
20
20
16
12
10
10
s x vc
0.67
0.51
0.55
Ast Pro
392.70
565.49
251.33
8063.42
0
1
0
8
10
8
5
5
5
5
4
3
2
2
25
25
25
25
20
16
12
12
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
1
2
1
10
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.008802
0.008802
0.008802
0.011003
0.008802
0.011003
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
3
4
3
4
2
3
0.50
1.00
0.50
1.00
0.25
0.50
0.56
0.70
0.56
0.70
0.44
0.56
Mf AD
770.30
Mf CB
684.79
Mf CD
-79.86
Mf DC
96.72
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach)
D
(A)
0.5581
-770.30
347.93
-173.96
164.77
-82.39
81.85
-40.93
40.90
-20.45
20.45
-432.13
(D)
A
0.5581
0.4419
770.30
-146.84
-347.93
-275.53
187.95
121.30
-172.58
-136.67
85.84
67.74
-85.71
-67.87
42.70
33.72
-42.65
-33.77
21.42
16.96
-21.42
-16.96
437.92
-437.92
Non-Sway
0.82
-0.82
Sway
438.74
-438.74
Final M
B
0.4419
135.86
242.59
-137.76
135.48
-68.33
67.44
-33.94
33.93
-16.89
16.88
375.27
-0.82
374.45
C
0.5581
-684.79
306.34
-168.80
171.08
-84.27
85.16
-42.84
42.84
-21.32
21.32
-375.27
0.82
-374.45
0.5581
684.79
-337.59
153.17
-168.54
85.54
-85.67
42.58
-42.63
21.42
-21.42
331.65
0.82
332.47
0.4419
-79.86
-267.34
148.84
-133.47
67.98
-67.84
33.81
-33.76
16.97
-16.96
-331.65
-0.82
-332.47
MF
1155.45
417.76
737.69
MG
1027.19
353.46
673.73
ME
212.03
-406.60
ME'
132.44
-364.62
Hor Reaction at A
Hor Reaction at D
-9.64 R2L
10.14 L2R
0.50 R2L
Check:
Final Hor Rcn at A
Final Hor Rcn at D
B
0.4419
3.00
-1.33
0.4419
3.00
-1.33
C
0.5581
0.00
-1.67
0.5581
0.00
-1.67
0.4419
3.00
-1.33
0.4419
3.00
-1.33
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
0.52 L2R
0.52 L2R
1.03 R2L
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
c
-361.05
-361.05
-361.05
-361.05
-361.05
-361.05
1261673
1381441.4
1026303.6
543107.84
696647.49
0
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.68
0.52
0.50
Mf DA
-770.30
Mf AD
770.30
Mf CB
387.36
Mf CD
-79.86
0.5581
-770.30
375.90
-173.96
171.68
-86.29
85.40
-42.85
42.85
-21.32
21.32
-397.59
0.82
-396.77
(D)
A
0.5581
0.4419
472.86
-146.84
-181.94
-144.08
104.95
55.57
-89.58
-70.94
44.34
34.88
-44.21
-35.01
21.95
17.29
-21.90
-17.34
11.05
8.75
-11.05
-8.75
306.48
-306.48
Non-Sway
0.82
-0.82
Sway
307.30
-307.30
Final M
B
0.4419
135.86
111.15
-72.04
69.76
-35.47
34.58
-17.51
17.50
-8.67
8.67
243.82
-0.82
243.00
0.5581
-387.36
140.35
-85.80
88.09
-42.77
43.67
-22.09
22.10
-10.94
10.95
-243.82
0.82
-243.00
0.5581
387.36
-171.60
70.18
-85.55
44.04
-44.18
21.83
-21.88
11.05
-11.05
200.20
0.82
201.02
MF
709.29
286.31
422.99
MG
581.04
222.01
359.03
ME
212.03
-275.15
-63.12
ME'
132.44
-233.17
-100.73
Hor Reaction at A
Hor Reaction at D
-9.89 R2L
9.89 L2R
-9.64 R2L
10.14 L2R
0.50 R2L
(A)
0.5581
0.00
-1.67
(D)
0.5581
0.00
-1.67
B
0.4419
3.00
-1.33
0.4419
3.00
-1.33
C
0.5581
0.00
-1.67
0.5581
0.00
-1.67
0.4419
3.00
-1.33
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
Sway of 1.03
Sway of 0.50
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
0.52 L2R
0.52 L2R
1.03 R2L
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
96.72
Mf DA
-472.86
D
0.4419
-79.86
-135.89
83.11
-67.74
35.12
-34.98
17.38
-17.33
8.75
-8.75
-200.20
-0.82
-201.02
0.4419
96.72
166.23
-67.95
70.23
-33.87
34.76
-17.49
17.50
-8.67
8.67
266.14
-0.82
265.32
Agg size
10
12.5
20
25
40
(A)
0.5581
-472.86
209.91
-90.97
88.69
-44.79
43.90
-22.11
22.10
-10.95
10.95
-266.14
0.82
-265.32
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
6.5
7.0
-9.89 R2L
9.89 L2R
Hor Reaction at D
D
0.4419
3.00
-1.33
(A)
0.5581
0.00
-1.67
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
Check:
Hor Reaction at A
Rails
52
60
Mf AD
472.86
Steel
415
500
550
1045.16
1113.95
1045.16
-0.66
0.66
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.67
0.82
-0.84
0.84
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.67
-0.82
Sway of 1.03
Sway of 0.50
Haunch
200
300
350
400
450
500
550
600
6.00
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
1266.16
1348.29
1266.16
4 m x 5.5 m
30
500
20
30
10
18
Dimensions (Input)
Clear span of box, m
Clear height of box, m
Barrel Length of bridge
Ballast cushion
Earth cushion
Clear Cover top
Clear Cover side
Thickness of wearing coat
4.00
5.50
6.85
300
1000
50
60
150
m
m
m
mm
mm
mm
mm
mm
Dimensions (Output)
Thickness of top & Bottom slab
Thickness of side walls
Effective span
Effective height
Overall span of bridge
Overall height of bridge
Size of haunch
Dispersion width
2.745+Bst cu+le/2
0.5
0.55
4.55
6.15
5.1
6.65
550
6.32
M
Fe
Enter Value
DFC Loads
EUDL for bending moment fm table
718.21
KN
976.71
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
0.908
0.394
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Superimposed dead load (SIDL)
Rails & Sleepers
Ballast & Earth
Superimposed live load (SILL) (with CDA)
For BM
Case-I
12.5
12.5
17.07
0.83
2.26
29.76
32.02
41.50
E'
For Shear
56.44
Derailment Load
For BM
For Shear
6.23
8.47
Earth pressure
Ka
17.50
2.33
54.44
83.01
12.45
74.27
169.73
47.81
2.33
50.13
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
13.95
69.3
At top
8.61
At Bottom
42.75
Earth pressure due to live & dead load surcharge
S, live t/m
162.50
V, dead t/m
43.68
Surcharge pressure
At top
21.20
At Bottom
12.00
Earth pressure (with load factors)
At top
14.63
At Bottom
72.68
Earth pressure & Surcharge Pressure (with load factors)
At top
50.67
At Bottom
93.08
kn/m2
kn/m2
Kn/m2
Kn/m2
232.36
286.32
Base
kn/m2
kn/m2
kn/m2
kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-316.57
-328.27
-246.56
Top U R/c
MB
-245.19
-255.64
-173.93
-255.64
Btm I R/c
MF
252.39
274.18
108.85
Top I R/c
MG
194.04
217.07
51.74
217.07
Side O R/c
ME
0.00
-18.60
0.00
-18.60
Side I R/c
ME'
58.93
47.86
129.57
129.57
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
217.07
274.18
328.27
18.60
255.64
129.57
NA
NA
NA
NA
Total
Ast Req
1211.65
1554.08
1099.39
1100.00
926.74
1100.00
660.00
600.00
777.04
777.04
9805.95
Dia req
12.42
14.07
16.73
16.74
15.36
16.74
11.23
10.70
14.07
14.07
Sheer-V
352.05
438.53
254.36
Asv Req
319.85
411.60
211.19
6284.28
v
0.81
1.01
0.53
Dia Req
9.02
10.24
7.33
Pt
0.26
0.46
0.21
spacing
100
100
200
200
200
200
150
150
200
200
Dia pro
12
16
16
16
16
16
12
12
16
16
Total
Ast pro
1131
2011
1005
1005
1005
1005
754
754
1005
1005
10681
Per sqm
spacing-L
150
150
150
vc
s x vc
s
1.04
0.44
1.04
0.42
1.07
0.42
Spacing-W Dia Pro Ast Pro
200
10
392.70
200
12
565.49
200
8
251.33
8063.42
Per sqm
0.42
0.40
0.40
Joint
A
Mf AB
-239.91
Distribution Factors
Member Relative stiff Sum
AD
0.0275
0.0545
AB
0.0271
D.F
0.5038
0.4962
BA
BC
0.4962
0.5038
0.0271
0.0275
Mf CB
292.82
0.0545
Mf CD
-213.18
Mf DC
239.91
Mf DA
-379.31
Mf AD
379.31
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.5038
379.31
-70.24
35.12
-27.65
13.82
-13.80
6.90
-6.90
3.45
-3.45
316.57
B
0.4962
-239.91
-69.16
19.76
-27.23
13.56
-13.59
6.79
-6.79
3.40
-3.40
-316.57
0.4962
213.18
39.52
-34.58
27.11
-13.61
13.58
-6.79
6.79
-3.40
3.40
245.19
MF
568.97
MG
ME
ME'
C
0.5038
-292.82
40.13
-20.06
27.53
-13.77
13.80
-6.90
6.90
-3.45
3.45
-245.19
0.5038
292.82
-40.13
20.06
-27.53
13.77
-13.80
6.90
-6.90
3.45
-3.45
245.19
D
0.4962
-213.18
-39.52
34.58
-27.11
13.61
-13.58
6.79
-6.79
3.40
-3.40
-245.19
316.57
252.39
439.23
245.19
194.04
339.81
-280.88
339.81
-280.88
0.4962
239.91
69.16
-19.76
27.23
-13.56
13.59
-6.79
6.79
-3.40
3.40
316.57
(A)
0.5038
-379.31
70.24
-35.12
27.65
-13.82
13.80
-6.90
6.90
-3.45
3.45
-316.57
a
2
2
3
3
2
3
1
1
0
1
0
12
12
16
16
12
16
10
10
8
10
8
3
3
4
4
3
4
2
2
16
16
20
20
16
20
12
12
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
1
2
1
10
12
10
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.018333
0.018333
0.018333
0.016684
0.018333
0.016684
-435
-435
-435
-435
-435
-435
c
500153.12
631748.49
687476.85
38945.931
584328.23
271346.65
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
35
0.37
0.44
0.56
40
0.39
0.47
0.59
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
0.7
0.89
1.01
0.74
0.93
1.06
2
3
2
3
1
2
0.25
0.50
0.25
0.50
0.15
0.25
0.42
0.53
0.42
0.53
0.36
0.42
0.42
8
10
12
16
20
25
32
40
0.40
0.40
Mf AB
-239.91
Mf CB
292.82
Mf CD
-119.30
Mf DC
155.89
Mf DA
-379.31
Mf AD
379.31
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach)
(D)
0.5038
379.31
-70.24
56.28
-38.31
19.69
-19.71
9.54
-9.54
4.93
-4.93
327.03
Non-Sway
1.24
Sway
328.27
Final M
B
0.4962
-239.91
-69.16
19.76
-37.73
19.42
-19.41
9.40
-9.40
4.85
-4.85
-327.03
-1.24
-328.27
0.4962
213.18
39.52
-34.58
38.85
-18.86
18.79
-9.70
9.70
-4.70
4.70
256.89
-1.24
255.64
MF
568.97
MG
ME
ME'
C
0.5038
-292.82
40.13
-43.71
39.45
-19.02
19.09
-9.85
9.85
-4.77
4.77
-256.89
1.24
-255.64
0.5038
292.82
-87.43
20.06
-38.03
19.72
-19.71
9.54
-9.54
4.93
-4.93
187.44
1.24
188.68
D
0.4962
-119.30
-86.09
55.42
-37.45
19.39
-19.41
9.40
-9.40
4.85
-4.85
-187.44
-1.24
-188.68
0.4962
155.89
110.85
-43.05
38.78
-18.73
18.80
-9.70
9.70
-4.70
4.70
262.55
-1.24
261.31
294.79
274.18
439.23
222.16
217.07
339.81
-291.96
206.40
-224.99
-15.42 R2L
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
16.51 L2R
1.09 R2L
(A)
0.5038
-379.31
112.57
-35.12
39.38
-19.16
19.09
-9.85
9.85
-4.77
4.77
-262.55
1.24
-261.31
Check:
Final Hor Rcn at A
Non-Sway
Sway
Final M
-15.96 R2L
15.96 L2R
B
0.4962
3.00
-1.49
-0.74
0.74
0.4962
3.00
-1.49
-0.74
0.74
C
0.5038
0.00
-1.51
-0.76
0.76
0.5038
0.00
-1.51
-0.76
0.76
D
0.4962
3.00
-1.49
-0.74
0.74
0.4962
3.00
-1.49
-0.74
0.74
(A)
0.5038
0.00
-1.51
-0.76
0.76
(D)
0.5038
0.00
-1.51
-0.76
0.76
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
0.66 L2R
0.66 L2R
1.33 R2L
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
Sway of 1.33
Sway of 1.09
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
Hor Reaction at A
Hor Reaction at D
Value of P preventing side
Concrete
15
20
25
30
35
40
Mf AB
-239.91
Mf CB
128.13
Mf CD
-119.30
Mf DC
155.89
Mf DA
-214.62
Mf AD
214.62
B
0.4962
-239.91
12.55
-21.10
3.13
-1.00
1.02
-0.82
0.82
-0.26
0.26
-245.32
-1.24
-246.56
0.4962
213.18
-42.20
6.27
-2.01
1.56
-1.63
0.51
-0.51
0.41
-0.41
175.17
-1.24
173.93
C
0.5038
-128.13
-42.85
-2.22
-2.04
1.73
-1.66
0.52
-0.52
0.41
-0.41
-175.17
1.24
-173.93
0.5038
128.13
-4.45
-21.43
3.45
-1.02
1.04
-0.83
0.83
-0.26
0.26
105.73
1.24
106.97
D
0.4962
-119.30
-4.38
14.57
3.40
-1.04
1.02
-0.82
0.82
-0.26
0.26
-105.73
-1.24
-106.97
0.4962
155.89
29.14
-2.19
-2.07
1.70
-1.63
0.51
-0.51
0.41
-0.41
180.84
-1.24
179.59
Steel
415
500
550
(A)
0.5038
-214.62
29.59
6.37
-2.11
1.59
-1.66
0.52
-0.52
0.41
-0.41
-180.84
1.24
-179.59
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
MF
321.93
213.08
108.85
9.5
1458.34
MG
192.19
140.45
51.74
10.0
1511.16
ME
339.81
-210.25
ME'
206.40
-143.28
-15.42 R2L
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
16.51 L2R
1.09 R2L
4.5
5.0
Check:
Hor Reaction at A
-15.96 R2L
15.96 L2R
Hor Reaction at D
B
0.4962
3.00
-1.49
-0.74
0.74
0.4962
3.00
-1.49
-0.74
0.74
C
0.5038
0.00
-1.51
-0.76
0.76
0.5038
0.00
-1.51
-0.76
0.76
D
0.4962
3.00
-1.49
-0.74
0.74
0.4962
3.00
-1.49
-0.74
0.74
(A)
0.5038
0.00
-1.51
-0.76
0.76
710.30
789.39
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
0.66 L2R
0.66 L2R
1.33 R2L
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
0.37
-0.37
-0.19
0.19
0.09
-0.09
1.51
1.24
0.38
-0.38
-0.19
0.19
0.09
-0.09
-1.51
-1.24
Sway of 1.33
Sway of 1.09
Agg size
10
12.5
20
25
40
Rails
52
60
5.50
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1458.34
1458.34
1458.34
9.5
1718.04
1718.04
1718.04
1718.04
1511.16
1511.16
1511.16
10.0
1759.49
1759.49
1759.49
1759.49
959.42
1045.86
976.71
718.21
5.0
5.5
M
Fe
2mx2m
30
500
20
30
10
18
2.00
2.00
4.80
300
1000
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
2.35
2.50
2.7
2.85
200
5.22
DFC Loads
EUDL for bending moment fm table
520.05
KN
595.29
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.433
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
8.01
0.21
2.50
29.76
32.26
66.08
75.64
Derailment Load
For BM
For Shear
9.91
11.35
Earth pressure
Ka
12.25
0.60
54.84
132.16
19.82
67.69
219.68
22.41
0.60
23.01
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
13.275
35.775
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
60.05 kn/m2
251.44
271.06
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-70.36
-72.33
-38.44
Top U R/c
MB
-62.27
-64.05
-30.16
-64.05
Btm I R/c
MF
97.17
101.00
29.98
Top I R/c
MG
89.37
93.40
22.37
93.40
Side O R/c
ME
-23.35
-36.49
-2.59
-36.49
Side I R/c
ME'
0.00
0.00
8.67
8.67
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
93.40
101.00
72.33
36.49
64.05
8.67
NA
NA
NA
NA
Total
Ast Req
796.85
865.81
525.00
700.00
525.00
700.00
420.00
420.00
432.90
432.90
5818.46
Dia req
11.48
11.97
13.18
15.22
13.18
15.22
8.96
8.96
11.97
11.97
Sheer-V
235.62
258.06
74.09
Asv Req
297.22
334.98
166.18
5322.54
v
0.83
0.91
0.27
Dia Req
9.92
10.53
7.42
Pt
0.31
0.31
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
12
12
16
16
16
16
10
10
12
12
Total
spacing-L
150
150
150
vc
0.44
0.43
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
10
12
8
Per sqm
Joint
A
Mf AB
-29.17
Distribution Factors
Member Relative stiff Sum
AD
0.0182
0.0354
AB
0.0172
D.F
0.5155
0.4845
BA
BC
0.4845
0.5155
0.0172
0.0182
Mf CB
101.10
0.0354
Mf CD
-28.12
Mf DC
29.17
Mf DA
-111.69
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.5155
111.69
-42.53
21.27
-20.08
10.04
-10.02
5.01
-5.01
2.50
-2.50
70.36
B
0.4845
-29.17
-39.98
17.68
-18.87
9.40
-9.42
4.71
-4.71
2.35
-2.35
-70.36
0.4845
28.12
35.36
-19.99
18.80
-9.44
9.42
-4.71
4.71
-2.35
2.35
62.27
C
0.5155
-101.10
37.62
-18.81
20.00
-10.00
10.02
-5.01
5.01
-2.50
2.50
-62.27
0.5155
101.10
-37.62
18.81
-20.00
10.00
-10.02
5.01
-5.01
2.50
-2.50
62.27
0.4845
-28.12
-35.36
19.99
-18.80
9.44
-9.42
4.71
-4.71
2.35
-2.35
-62.27
D
MF
167.53
70.36
97.17
MG
151.64
62.27
89.37
ME
42.97
-66.32
ME'
42.97
-66.32
0.4845
29.17
39.98
-17.68
18.87
-9.40
9.42
-4.71
4.71
-2.35
2.35
70.36
Ast pro
870
870
773
773
773
773
524
524
435
435
6750
s x vc
0.51
0.50
0.56
Ast Pro
302.08
434.99
193.33
6202.63
a
1
1
2
2
2
2
0
0
0
1
0
10
10
12
12
12
12
8
8
8
10
8
2
2
3
3
3
3
1
1
12
12
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
1
2
1
10
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
2
3
2
3
0.25
0.50
0.25
0.50
0.25
0.50
0.42
0.53
0.42
0.53
0.42
0.53
Mf AD
111.69
Mf AB
-29.17
Mf CB
101.10
Mf CD
-12.17
Mf DC
14.63
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.5155
-111.69
42.53
-21.27
20.08
-10.04
10.02
-5.01
5.01
-2.50
2.50
-70.36
(D)
0.5155
111.69
-42.53
25.02
-22.01
11.03
-11.05
5.48
-5.48
2.76
-2.76
72.15
Non-Sway
0.18
Sway
72.33
Final M
B
0.4845
-29.17
-39.98
17.68
-20.69
10.40
-10.38
5.15
-5.15
2.60
-2.60
-72.15
-0.18
-72.33
0.4845
28.12
35.36
-19.99
20.79
-10.34
10.30
-5.19
5.19
-2.57
2.57
64.24
-0.18
64.05
C
0.5155
-101.10
37.62
-22.92
22.12
-10.91
10.95
-5.52
5.52
-2.74
2.74
-64.24
0.18
-64.05
0.5155
101.10
-45.84
18.81
-21.82
11.06
-11.05
5.48
-5.48
2.76
-2.76
52.26
0.18
52.44
0.4845
-12.17
-43.09
23.51
-20.51
10.37
-10.38
5.15
-5.15
2.60
-2.60
-52.26
-0.18
-52.44
MF
167.53
66.53
101.00
MG
151.64
58.25
93.40
ME
42.97
-68.19
ME'
20.09
-56.58
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-3.37 R2L
3.68 L2R
0.31 R2L
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
B
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
1.32 L2R
1.32 L2R
2.63 R2L
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
c
-435
-435
-435
-435
-435
-435
328861.36
355649.39
260653.4
131479.36
222798.57
31243.626
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.43
0.43
Mf DA
-111.69
Mf AD
111.69
Mf AB
-29.17
Mf CB
31.15
Mf CD
-12.17
0.5155
-111.69
50.03
-21.27
22.07
-11.00
10.96
-5.52
5.52
-2.74
2.74
-60.90
0.18
-60.72
(D)
0.5155
41.74
-6.48
6.99
-3.98
2.02
-2.03
0.97
-0.97
0.51
-0.51
38.26
Non-Sway
0.18
Sway
38.44
Final M
B
0.4845
-29.17
-6.09
0.73
-3.74
1.92
-1.91
0.91
-0.91
0.48
-0.48
-38.26
-0.18
-38.44
0.4845
28.12
1.47
-3.04
3.85
-1.87
1.82
-0.96
0.96
-0.46
0.46
30.34
-0.18
30.16
0.5155
-31.15
1.56
-4.89
4.09
-1.89
1.94
-1.02
1.02
-0.49
0.49
-30.34
0.18
-30.16
0.5155
31.15
-9.79
0.78
-3.79
2.05
-2.03
0.97
-0.97
0.51
-0.51
18.37
0.18
18.55
MF
62.61
32.63
29.98
MG
46.73
24.36
22.37
ME
42.97
-34.30
8.67
ME'
20.09
-22.69
-2.59
-3.52 R2L
3.52 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-3.37 R2L
3.68 L2R
0.31 R2L
(A)
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
Sway of 2.63
Sway of 0.31
(D)
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
B
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
1.32 L2R
1.32 L2R
2.63 R2L
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
14.63
Mf DA
-41.74
D
0.4845
-12.17
-9.20
6.57
-3.56
1.90
-1.91
0.91
-0.91
0.48
-0.48
-18.37
-0.18
-18.55
0.4845
14.63
13.14
-4.60
3.80
-1.78
1.83
-0.96
0.96
-0.46
0.46
27.01
-0.18
26.83
Agg size
10
12.5
20
25
40
(A)
0.5155
-41.74
13.98
-3.24
4.04
-1.99
1.94
-1.02
1.02
-0.49
0.49
-27.01
0.18
-26.83
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
41.74
Steel
415
500
550
2.0
2.5
-3.52 R2L
3.52 L2R
500.98
528.22
520.05
D
0.4845
3.00
-1.45
-0.73
0.73
0.36
-0.36
-0.18
0.18
0.09
-0.09
1.55
0.18
(A)
0.5155
0.00
-1.55
-0.77
0.77
0.39
-0.39
-0.19
0.19
0.10
-0.10
-1.55
-0.18
Sway of 2.63
Sway of 0.31
Haunch
200
300
350
400
450
500
550
600
2.00
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
546.84
667.97
595.29
M
Fe
2.2 m x 2.5 m
30
500
20
30
10
18
2.20
2.50
5.30
300
2500
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
2.55
3.00
2.9
3.35
200
6.82
DFC Loads
EUDL for bending moment fm table
530.03
KN
643.74
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.183
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
9.09
0.20
2.26
58.56
60.82
6.96
8.45
Earth pressure
46.41
56.36
Ka
12.25
0.55
103.40
92.82
13.92
116.20
222.94
25.46
0.55
26.01
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
26.775
53.775
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
76.80 kn/m2
257.70
282.22
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-92.64
-95.33
-68.75
Top U R/c
MB
-81.98
-84.34
-57.76
-84.34
Btm I R/c
MF
109.71
115.27
55.08
Top I R/c
MG
99.23
105.12
44.93
105.12
Side O R/c
ME
-8.04
-25.82
0.00
-25.82
Side I R/c
ME'
0.00
0.00
16.01
16.01
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
105.12
115.27
95.33
25.82
84.34
16.01
NA
NA
NA
NA
Total
Ast Req
903.35
996.97
525.00
700.00
525.00
700.00
420.00
420.00
498.48
498.48
6187.28
Dia req
12.23
12.85
13.18
15.22
13.18
15.22
8.96
8.96
12.85
12.85
Sheer-V
264.28
292.24
112.41
Asv Req
338.98
368.06
166.18
5821.52
v
0.93
1.03
0.40
Dia Req
10.59
11.04
7.42
Pt
0.31
0.54
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
12
16
16
16
16
16
10
10
16
16
Total
spacing-L
150
150
150
vc
0.44
0.47
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
12
12
8
Per sqm
Joint
A
Mf AB
-53.80
Distribution Factors
Member Relative stiff Sum
AD
0.0168
0.0311
AB
0.0143
D.F
0.5405
0.4595
BA
BC
0.4595
0.5405
0.0143
0.0168
Mf CB
120.80
0.0311
Mf CD
-51.89
Mf DC
53.80
Mf DA
-134.90
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.5405
134.90
-43.84
21.92
-20.41
10.20
-10.14
5.07
-5.07
2.53
-2.53
92.64
B
0.4595
-53.80
-37.26
15.83
-17.34
8.56
-8.62
4.31
-4.31
2.15
-2.15
-92.64
0.4595
51.89
31.66
-18.63
17.12
-8.67
8.61
-4.31
4.31
-2.15
2.15
81.98
C
0.5405
-120.80
37.25
-18.62
20.14
-10.07
10.13
-5.07
5.07
-2.53
2.53
-81.98
0.5405
120.80
-37.25
18.62
-20.14
10.07
-10.13
5.07
-5.07
2.53
-2.53
81.98
0.4595
-51.89
-31.66
18.63
-17.12
8.67
-8.61
4.31
-4.31
2.15
-2.15
-81.98
D
MF
202.35
92.64
109.71
MG
181.21
81.98
99.23
ME
79.27
-87.31
ME'
79.27
-87.31
0.4595
53.80
37.26
-15.83
17.34
-8.56
8.62
-4.31
4.31
-2.15
2.15
92.64
Ast pro
870
1547
773
773
773
773
524
524
773
773
8104
s x vc
0.51
0.54
0.56
Ast Pro
434.99
434.99
193.33
7088.72
a
2
2
2
2
2
2
0
0
1
1
0
12
12
12
12
12
12
8
8
10
10
8
3
3
3
3
3
3
1
1
16
16
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
2
2
1
12
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
3
4
2
3
0.25
0.50
0.50
1.00
0.25
0.50
0.42
0.53
0.53
0.67
0.42
0.53
Mf AD
134.90
Mf AB
-53.80
Mf CB
120.80
Mf CD
-29.56
Mf DC
33.80
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.5405
-134.90
43.84
-21.92
20.41
-10.20
10.14
-5.07
5.07
-2.53
2.53
-92.64
(D)
0.5405
134.90
-43.84
27.32
-23.33
11.59
-11.64
5.75
-5.74
2.91
-2.91
95.01
Non-Sway
0.32
Sway
95.33
Final M
B
0.4595
-53.80
-37.26
15.83
-19.83
9.95
-9.89
4.88
-4.88
2.47
-2.47
-95.01
-0.32
-95.33
0.4595
51.89
31.66
-18.63
19.89
-9.91
9.75
-4.95
4.95
-2.44
2.44
84.66
-0.32
84.34
C
0.5405
-120.80
37.25
-24.66
23.40
-11.31
11.47
-5.82
5.82
-2.87
2.87
-84.66
0.32
-84.34
0.5405
120.80
-49.32
18.62
-22.62
11.70
-11.65
5.74
-5.74
2.91
-2.91
67.53
0.32
67.85
0.4595
-29.56
-41.93
23.22
-19.23
9.85
-9.90
4.89
-4.88
2.47
-2.47
-67.53
-0.32
-67.85
MF
202.35
87.08
115.27
MG
181.21
76.09
105.12
ME
79.27
-89.83
ME'
47.52
-73.34
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-4.06 R2L
4.56 L2R
0.50 R2L
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
B
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
1.27 L2R
1.27 L2R
2.54 R2L
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
c
-435
-435
-435
-435
-435
-435
370123.74
405867.12
343525.27
93050.393
293350.56
57687.855
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.47
0.43
Mf DA
-134.90
Mf AD
134.90
Mf AB
-53.80
Mf CB
62.97
Mf CD
-29.56
0.5405
-134.90
54.65
-21.92
23.18
-11.66
11.50
-5.82
5.82
-2.87
2.87
-79.15
0.32
-78.84
(D)
0.5405
77.06
-12.58
11.69
-7.69
3.77
-3.82
1.84
-1.84
0.96
-0.96
68.44
Non-Sway
0.32
Sway
68.75
Final M
B
0.4595
-53.80
-10.69
2.54
-6.54
3.30
-3.25
1.55
-1.56
0.81
-0.81
-68.44
-0.32
-68.75
0.4595
51.89
5.09
-5.34
6.60
-3.27
3.11
-1.63
1.63
-0.78
0.78
58.08
-0.32
57.76
0.5405
-62.97
5.98
-9.03
7.77
-3.49
3.66
-1.92
1.91
-0.92
0.92
-58.08
0.32
-57.76
0.5405
62.97
-18.06
2.99
-6.99
3.88
-3.83
1.83
-1.83
0.96
-0.96
40.95
0.32
41.27
MF
115.59
60.51
55.08
MG
94.45
49.52
44.93
ME
79.27
-63.26
16.01
ME'
47.52
-46.77
0.75
-4.31 R2L
4.31 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-4.06 R2L
4.56 L2R
0.50 R2L
(A)
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
Sway of 2.54
Sway of 0.50
(D)
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
B
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
1.27 L2R
1.27 L2R
2.54 R2L
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
33.80
Mf DA
-77.06
D
0.4595
-29.56
-15.35
9.94
-5.94
3.21
-3.26
1.57
-1.56
0.81
-0.81
-40.95
-0.32
-41.27
0.4595
33.80
19.87
-7.68
6.42
-2.97
3.13
-1.63
1.63
-0.78
0.78
52.58
-0.32
52.26
Agg size
10
12.5
20
25
40
(A)
0.5405
-77.06
23.38
-6.29
7.55
-3.85
3.69
-1.91
1.91
-0.92
0.92
-52.58
0.32
-52.26
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
77.06
Steel
415
500
550
2.5
3.0
-4.31 R2L
4.31 L2R
528.22
546.35
530.03
D
0.4595
3.00
-1.38
-0.69
0.69
0.34
-0.34
-0.17
0.17
0.09
-0.09
1.62
0.32
(A)
0.5405
0.00
-1.62
-0.81
0.81
0.41
-0.41
-0.20
0.20
0.10
-0.10
-1.62
-0.32
Sway of 2.54
Sway of 0.50
Haunch
200
300
350
400
450
500
550
600
2.50
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
546.84
667.97
643.74
M
Fe
1.5 m x 1.8 m
30
500
20
30
10
18
1.50
1.80
5.30
300
0
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
1.85
2.30
2.2
2.65
200
3.97
DFC Loads
EUDL for bending moment fm table
539.98
KN
578.59
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.833
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
9.22
0.27
3.02
10.56
13.58
20.22
21.66
Earth pressure
134.79
144.43
Ka
12.25
0.76
23.09
269.58
40.44
36.10
346.11
25.82
0.76
26.58
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
4.275
24.975
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
53.43 kn/m2
381.44
399.10
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-60.02
-61.71
-22.29
Top U R/c
MB
-54.33
-55.90
-16.49
-55.90
Btm I R/c
MF
99.42
103.23
10.02
Top I R/c
MG
93.75
97.67
4.45
97.67
Side O R/c
ME
-26.11
-37.67
0.00
-37.67
Side I R/c
ME'
0.00
0.00
11.67
11.67
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
97.67
103.23
61.71
37.67
55.90
11.67
NA
NA
NA
NA
Total
Ast Req
835.48
886.13
525.00
700.00
525.00
700.00
420.00
420.00
443.07
443.07
5897.75
Dia req
11.76
12.11
13.18
15.22
13.18
15.22
8.96
8.96
12.11
12.11
Sheer-V
267.00
286.28
58.97
Asv Req
342.96
376.11
166.18
5901.70
v
0.94
1.00
0.21
Dia Req
10.66
11.16
7.42
Pt
0.31
0.31
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
12
12
16
16
16
16
10
10
12
12
Total
spacing-L
150
150
150
vc
0.44
0.43
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
12
12
8
Per sqm
Joint
A
Mf AB
-21.28
Distribution Factors
Member Relative stiff Sum
AD
0.0232
0.0418
AB
0.0186
D.F
0.5542
0.4458
BA
BC
0.4458
0.5542
0.0186
0.0232
Mf CB
98.71
0.0418
Mf CD
-20.14
Mf DC
21.28
Mf DA
-106.30
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.5542
106.30
-47.12
23.56
-22.76
11.38
-11.34
5.67
-5.67
2.83
-2.83
60.02
B
0.4458
-21.28
-37.90
17.51
-18.31
9.08
-9.12
4.56
-4.56
2.28
-2.28
-60.02
0.4458
20.14
35.03
-18.95
18.15
-9.15
9.11
-4.56
4.56
-2.28
2.28
54.33
C
0.5542
-98.71
43.55
-21.77
22.57
-11.28
11.33
-5.66
5.67
-2.83
2.83
-54.33
0.5542
98.71
-43.55
21.77
-22.57
11.28
-11.33
5.66
-5.67
2.83
-2.83
54.33
0.4458
-20.14
-35.03
18.95
-18.15
9.15
-9.11
4.56
-4.56
2.28
-2.28
-54.33
D
MF
159.44
60.02
99.42
MG
148.07
54.33
93.75
ME
31.06
-57.17
ME'
31.06
-57.17
0.4458
21.28
37.90
-17.51
18.31
-9.08
9.12
-4.56
4.56
-2.28
2.28
60.02
Ast pro
870
870
773
773
773
773
524
524
435
435
6750
s x vc
0.51
0.50
0.56
Ast Pro
434.99
434.99
193.33
7088.72
a
1
2
2
2
2
2
0
0
1
1
0
10
12
12
12
12
12
8
8
10
10
8
2
3
3
3
3
3
1
1
12
16
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
2
2
1
12
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
2
3
2
3
0.25
0.50
0.25
0.50
0.25
0.50
0.42
0.53
0.42
0.53
0.42
0.53
Mf AD
106.30
Mf AB
-21.28
Mf CB
98.71
Mf CD
-5.80
Mf DC
7.72
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.5542
-106.30
47.12
-23.56
22.76
-11.38
11.34
-5.67
5.67
-2.83
2.83
-60.02
(D)
0.5542
106.30
-47.12
27.32
-24.85
12.27
-12.32
6.14
-6.14
3.08
-3.08
61.60
Non-Sway
0.11
Sway
61.71
Final M
B
0.4458
-21.28
-37.90
17.51
-19.98
9.96
-9.91
4.93
-4.94
2.48
-2.48
-61.60
-0.11
-61.71
0.4458
20.14
35.03
-18.95
19.92
-9.99
9.86
-4.95
4.96
-2.47
2.47
56.01
-0.11
55.90
C
0.5542
-98.71
43.55
-25.75
24.77
-12.12
12.26
-6.17
6.16
-3.07
3.07
-56.01
0.11
-55.90
0.5542
98.71
-51.49
21.77
-24.24
12.39
-12.33
6.13
-6.14
3.08
-3.08
44.80
0.11
44.90
0.4458
-5.80
-41.42
21.97
-19.50
9.87
-9.92
4.94
-4.94
2.48
-2.48
-44.80
-0.11
-44.90
MF
159.44
56.21
103.23
MG
148.07
50.40
97.67
ME
31.06
-58.81
ME'
10.14
-47.81
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-3.02 R2L
3.26 L2R
0.23 R2L
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
B
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
1.80 L2R
1.80 L2R
3.59 R2L
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
c
-435
-435
-435
-435
-435
-435
343901.62
363495.76
222377.03
135732.34
194443.97
42061.698
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.43
0.43
Mf DA
-106.30
Mf AD
106.30
Mf AB
-21.28
Mf CB
10.30
Mf CD
-5.80
0.5542
-106.30
54.63
-23.56
24.53
-12.42
12.29
-6.16
6.16
-3.07
3.07
-50.82
0.11
-50.71
(D)
0.5542
17.88
1.88
2.81
-0.34
0.02
-0.07
0.02
-0.01
0.02
-0.02
22.19
Non-Sway
0.11
Sway
22.29
Final M
B
0.4458
-21.28
1.52
-2.19
-0.28
0.11
-0.06
0.00
-0.01
0.02
-0.02
-22.19
-0.11
-22.29
0.4458
20.14
-4.39
0.76
0.22
-0.14
0.00
-0.03
0.03
0.00
0.00
16.59
-0.11
16.49
0.5542
-10.30
-5.46
-1.24
0.27
0.13
0.01
-0.04
0.04
0.00
0.01
-16.59
0.11
-16.49
0.5542
10.30
-2.49
-2.73
0.26
0.13
-0.08
0.00
-0.01
0.02
-0.02
5.38
0.11
5.49
MF
26.81
16.79
10.02
MG
15.44
10.99
4.45
ME
31.06
-19.39
11.67
ME'
10.14
-8.39
1.75
-3.14 R2L
3.14 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-3.02 R2L
3.26 L2R
0.23 R2L
(A)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
Sway of 3.59
Sway of 0.23
(D)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
B
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
1.80 L2R
1.80 L2R
3.59 R2L
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
7.72
Mf DA
-17.88
D
0.4458
-5.80
-2.00
2.26
0.21
0.01
-0.07
0.02
-0.01
0.02
-0.02
-5.38
-0.11
-5.49
0.4458
7.72
4.53
-1.00
0.03
0.10
0.03
-0.03
0.03
0.00
0.00
11.40
-0.11
11.30
Agg size
10
12.5
20
25
40
(A)
0.5542
-17.88
5.63
0.94
0.03
-0.17
0.04
-0.03
0.04
-0.01
0.01
-11.40
0.11
-11.30
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
17.88
Steel
415
500
550
1.5
2.0
-3.14 R2L
3.14 L2R
519.40
548.80
539.98
D
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.11
(A)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.11
Sway of 3.59
Sway of 0.23
Haunch
200
300
350
400
450
500
550
600
1.80
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
548.80
623.28
578.59
M
Fe
4 m x 5.5 m
35
500
20
30
10
18
Dimensions (Input)
Clear span of box, m
Clear height of box, m
Barrel Length of bridge
Ballast cushion
Earth cushion
Clear Cover top
Clear Cover side
Thickness of wearing coat
4.00
5.50
5.30
300
1000
50
50
150
m
m
m
mm
mm
mm
mm
mm
Dimensions (Output)
Thickness of top & Bottom slab
Thickness of side walls
Effective span
Effective height
Overall span of bridge
Overall height of bridge
Size of haunch
Dispersion width
2.745+Bst cu+le/2
0.5
0.5
4.50
6.15
5
6.65
450
6.30
Enter Value
DFC Loads
EUDL for bending moment fm table
710.30
KN
959.42
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
0.912
0.395
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Superimposed dead load (SIDL)
Rails & Sleepers
Ballast & Earth
Case-I
12.5
12.5
15.69
0.56
2.26
29.76
32.02
6.23
8.42
Earth pressure
41.55
56.12
Ka
17.50
1.58
54.44
83.10
12.47
73.52
169.08
43.94
1.58
45.52
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
13.95
69.3
At top
8.61
At Bottom
42.75
Earth pressure due to live & dead load surcharge
S, live t/m
162.50
V, dead t/m
43.68
Surcharge pressure
At top
21.20
At Bottom
12.00
Earth pressure (with load factors)
At top
14.63
At Bottom
72.68
Earth pressure & Surcharge Pressure (with load factors)
At top
50.67
At Bottom
93.08
kn/m2
kn/m2
Kn/m2
Kn/m2
227.10
281.06
Base
kn/m2
kn/m2
kn/m2
kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-298.18
-309.02
-240.88
Top U R/c
MB
-237.04
-246.34
-178.20
-246.34
Btm I R/c
MF
245.03
269.94
96.18
Top I R/c
MG
190.95
217.40
43.64
217.40
Side O R/c
ME
0.00
0.00
0.00
0.00
Side I R/c
ME'
72.20
62.13
130.28
130.28
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
217.40
269.94
309.02
0.00
246.34
130.28
NA
NA
NA
NA
Total
Ast Req
1203.92
1512.49
1128.96
1000.00
858.68
1000.00
600.00
600.00
756.25
756.25
9416.55
Dia req
12.38
13.88
16.96
15.96
14.79
15.96
10.70
10.70
13.88
13.88
Sheer-V
364.68
446.61
252.69
Asv Req
323.14
407.35
209.89
6269.22
v
0.84
1.03
0.58
Dia Req
9.07
10.18
7.31
Pt
0.26
0.46
0.23
spacing
100
100
200
200
200
200
150
150
200
200
Dia pro
12
16
20
16
16
16
12
12
16
16
Total
spacing-L
150
150
150
vc
0.44
0.43
0.43
Spacing-W
200
200
200
s
1.04
1.04
1.11
Dia Pro
10
12
8
Per sqm
Distribution Factors
Mf AB
-239.91
Joint
A
Member
AD
AB
BA
BC
Mf CB
285.33
D.F
0.5775
0.4225
0.0481
0.4225
0.5775
Mf CD
-213.18
Mf DC
239.91
Mf DA
-362.14
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.5775
362.14
-70.58
35.29
-29.18
14.59
-14.12
7.06
-7.02
3.51
-3.51
298.18
B
0.4225
-239.91
-51.65
15.24
-21.35
9.86
-10.33
5.10
-5.14
2.56
-2.57
-298.18
0.4225
213.18
30.49
-25.82
19.71
-10.68
10.20
-5.17
5.13
-2.57
2.57
237.04
C
0.5775
-285.33
41.66
-20.83
26.94
-13.47
13.94
-6.97
7.01
-3.50
3.51
-237.04
0.5775
285.33
-41.66
20.83
-26.94
13.47
-13.94
6.97
-7.01
3.50
-3.51
237.04
0.4225
-213.18
-30.49
25.82
-19.71
10.68
-10.20
5.17
-5.13
2.57
-2.57
-237.04
D
MF
543.21
298.18
245.03
MG
427.99
237.04
190.95
ME
339.81
-267.61
ME'
339.81
-267.61
0.4225
239.91
51.65
-15.24
21.35
-9.86
10.33
-5.10
5.14
-2.56
2.57
298.18
Ast pro
1131
2011
1571
1005
1005
1005
754
754
1005
1005
11247
a
2
2
3
2
2
2
1
1
12
12
16
12
12
12
10
10
s x vc
0.46
0.45
0.47
Ast Pro
392.70
565.49
251.33
8063.42
0
1
0
8
10
8
3
3
4
3
3
3
2
2
16
16
20
16
16
16
12
12
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
1
2
1
10
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.015714
0.015714
0.015714
0.015607
0.015714
0.015607
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
2
3
1
2
0.25
0.50
0.25
0.50
0.15
0.25
0.44
0.56
0.44
0.56
0.37
0.44
Mf AD
362.14
Mf AB
-239.91
Mf CB
285.33
Mf CD
-119.30
Mf DC
155.89
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach)
D
(A)
0.5775
-362.14
70.58
-35.29
29.18
-14.59
14.12
-7.06
7.02
-3.51
3.51
-298.18
(D)
0.5775
362.14
-70.58
59.55
-43.19
20.32
-20.73
10.16
-10.07
5.20
-5.20
307.60
Non-Sway
1.42
Sway
309.02
Final M
B
0.4225
-239.91
-51.65
15.24
-31.60
15.58
-15.17
7.27
-7.37
3.81
-3.81
-307.60
-1.42
-309.02
0.4225
213.18
30.49
-25.82
31.17
-15.80
14.53
-7.58
7.62
-3.68
3.68
247.76
-1.42
246.34
C
0.5775
-285.33
41.66
-47.94
42.59
-18.60
19.86
-10.44
10.41
-5.01
5.02
-247.76
1.42
-246.34
0.5775
285.33
-95.87
20.83
-37.19
21.30
-20.88
9.93
-10.03
5.20
-5.20
173.41
1.42
174.83
0.4225
-119.30
-70.15
43.57
-27.21
14.87
-15.28
7.44
-7.34
3.80
-3.81
-173.41
-1.42
-174.83
MF
543.21
273.27
269.94
MG
427.99
210.59
217.40
ME
339.81
-277.68
ME'
206.40
-206.18
Hor Reaction at A
Hor Reaction at D
-13.30 R2L
14.56 L2R
1.27 R2L
Check:
Final Hor Rcn at A
Final Hor Rcn at D
B
0.4225
3.00
-1.27
0.4225
3.00
-1.27
C
0.5775
0.00
-1.73
0.5775
0.00
-1.73
0.4225
3.00
-1.27
0.4225
3.00
-1.27
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
0.77 L2R
0.77 L2R
1.54 R2L
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
c
-435
-435
-435
-435
-435
-435
500929.67
621985.96
706333.89
0
563059.24
297771.64
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.43
0.43
Mf DA
-362.14
Mf AD
362.14
Mf AB
-239.91
Mf CB
124.06
Mf CD
-119.30
0.5775
-362.14
119.10
-35.29
40.64
-21.60
20.33
-10.37
10.40
-5.03
5.03
-238.94
1.42
-237.52
(D)
0.5775
200.87
22.54
12.99
3.37
-2.96
2.55
-1.48
1.58
-0.62
0.62
239.46
Non-Sway
1.42
Sway
240.88
Final M
B
0.4225
-239.91
16.49
-18.83
2.47
-1.45
1.87
-1.25
1.15
-0.45
0.45
-239.46
-1.42
-240.88
0.4225
213.18
-37.65
8.25
-2.90
1.23
-2.50
0.93
-0.90
0.58
-0.58
179.62
-1.42
178.20
0.5775
-124.06
-51.46
-1.37
-3.97
4.69
-3.42
1.20
-1.23
0.81
-0.80
-179.62
1.42
-178.20
0.5775
124.06
-2.75
-25.73
9.37
-1.98
2.40
-1.71
1.61
-0.62
0.62
105.27
1.42
106.69
MF
301.31
205.13
96.18
MG
186.09
142.44
43.64
ME
339.81
-209.54
130.28
ME'
206.40
-138.03
68.36
Hor Reaction at A
Hor Reaction at D
-13.93 R2L
13.93 L2R
-13.30 R2L
14.56 L2R
1.27 R2L
(A)
0.5775
0.00
-1.73
(D)
0.5775
0.00
-1.73
B
0.4225
3.00
-1.27
0.4225
3.00
-1.27
C
0.5775
0.00
-1.73
0.5775
0.00
-1.73
0.4225
3.00
-1.27
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
Sway of 1.54
Sway of 1.27
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
0.77 L2R
0.77 L2R
1.54 R2L
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
155.89
Mf DA
-200.87
D
0.4225
-119.30
-2.01
9.50
6.86
-2.17
1.75
-1.08
1.18
-0.45
0.45
-105.27
-1.42
-106.69
0.4225
155.89
19.01
-1.01
-4.34
3.43
-2.16
0.88
-0.91
0.59
-0.58
170.80
-1.42
169.38
Agg size
10
12.5
20
25
40
(A)
0.5775
-200.87
25.97
11.27
-5.93
1.69
-2.95
1.28
-1.24
0.79
-0.80
-170.80
1.42
-169.38
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
4.5
5.0
-13.93 R2L
13.93 L2R
Hor Reaction at D
D
0.4225
3.00
-1.27
(A)
0.5775
0.00
-1.73
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
Check:
Hor Reaction at A
Rails
52
60
Mf AD
200.87
Steel
415
500
550
710.30
789.39
710.30
-0.63
0.63
0.32
-0.32
-0.16
0.16
0.08
-0.08
1.73
1.42
-0.87
0.87
0.43
-0.43
-0.22
0.22
0.11
-0.11
-1.73
-1.42
Sway of 1.54
Sway of 1.27
Haunch
200
300
350
400
450
500
550
600
5.50
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
959.42
1045.86
959.42
M
Fe
1.5 m x 1.8 m
30
500
20
30
10
18
1.50
1.80
5.30
300
600
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
1.85
2.30
2.2
2.65
200
4.57
DFC Loads
EUDL for bending moment fm table
487.40
KN
519.32
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.500
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
9.22
0.27
2.63
22.08
24.71
86.47
92.14
Derailment Load
For BM
For Shear
12.97
13.82
Earth pressure
Ka
12.25
0.76
42.00
172.95
25.94
55.01
253.90
25.82
0.76
26.58
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
9.675
30.375
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
55.52 kn/m2
289.23
306.89
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-49.19
-50.82
-25.53
Top U R/c
MB
-43.59
-45.06
-19.77
-45.06
Btm I R/c
MF
70.80
74.36
14.56
Top I R/c
MG
65.03
68.75
8.95
68.75
Side O R/c
ME
-12.77
-23.67
0.00
-23.67
Side I R/c
ME'
0.00
0.00
10.98
10.98
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
68.75
74.36
50.82
23.67
45.06
10.98
NA
NA
NA
NA
Total
Ast Req
578.01
627.25
525.00
700.00
525.00
700.00
420.00
420.00
313.62
313.62
5122.51
Dia req
9.78
10.19
13.18
15.22
13.18
15.22
8.96
8.96
10.19
10.19
Sheer-V
193.52
212.79
62.70
Asv Req
258.37
266.61
166.18
4607.73
v
0.68
0.75
0.23
Dia Req
9.25
9.39
7.42
Pt
0.21
0.21
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
10
10
16
16
16
16
10
10
10
10
Total
spacing-L
150
150
150
vc
0.40
0.44
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
10
10
8
Per sqm
Joint
A
Mf AB
-22.83
Distribution Factors
Member Relative stiff Sum
AD
0.0232
0.0418
AB
0.0186
D.F
0.5542
0.4458
BA
BC
0.4458
0.5542
0.0186
0.0232
Mf CB
72.41
0.0418
Mf CD
-22.01
Mf DC
22.83
Mf DA
-79.99
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.5542
79.99
-31.68
15.84
-15.01
7.50
-7.46
3.73
-3.73
1.86
-1.86
49.19
B
0.4458
-22.83
-25.48
11.24
-12.07
5.95
-6.00
2.99
-3.00
1.50
-1.50
-49.19
0.4458
22.01
22.47
-12.74
11.91
-6.04
5.99
-3.00
3.00
-1.50
1.50
43.59
C
0.5542
-72.41
27.94
-13.97
14.80
-7.40
7.45
-3.72
3.73
-1.86
1.86
-43.59
0.5542
72.41
-27.94
13.97
-14.80
7.40
-7.45
3.72
-3.73
1.86
-1.86
43.59
0.4458
-22.01
-22.47
12.74
-11.91
6.04
-5.99
3.00
-3.00
1.50
-1.50
-43.59
D
MF
119.99
49.19
70.80
MG
108.62
43.59
65.03
ME
33.63
-46.39
ME'
33.63
-46.39
0.4458
22.83
25.48
-11.24
12.07
-5.95
6.00
-2.99
3.00
-1.50
1.50
49.19
Ast pro
604
604
773
773
773
773
524
524
302
302
5953
s x vc
0.46
0.50
0.56
Ast Pro
302.08
302.08
193.33
5316.54
a
0
1
2
2
2
2
0
0
0
0
0
8
10
12
12
12
12
8
8
8
8
8
1
2
3
3
3
3
1
1
10
12
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
1
1
1
10
10
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
1
2
1
2
2
3
0.15
0.25
0.15
0.25
0.25
0.50
0.36
0.42
0.36
0.42
0.42
0.53
Mf AD
79.99
Mf AB
-22.83
Mf CB
72.41
Mf CD
-8.30
Mf DC
10.22
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.5542
-79.99
31.68
-15.84
15.01
-7.50
7.46
-3.73
3.73
-1.86
1.86
-49.19
(D)
0.5542
79.99
-31.68
19.34
-16.94
8.35
-8.40
4.17
-4.16
2.10
-2.10
50.67
Non-Sway
0.15
Sway
50.82
Final M
B
0.4458
-22.83
-25.48
11.24
-13.63
6.80
-6.75
3.34
-3.35
1.69
-1.69
-50.67
-0.15
-50.82
0.4458
22.01
22.47
-12.74
13.60
-6.81
6.68
-3.38
3.38
-1.67
1.67
45.21
-0.15
45.06
C
0.5542
-72.41
27.94
-17.77
16.91
-8.18
8.31
-4.20
4.20
-2.08
2.08
-45.21
0.15
-45.06
0.5542
72.41
-35.53
13.97
-16.36
8.45
-8.41
4.16
-4.16
2.10
-2.10
34.53
0.15
34.68
0.4458
-8.30
-28.58
15.55
-13.16
6.72
-6.76
3.35
-3.35
1.69
-1.69
-34.53
-0.15
-34.68
MF
119.99
45.63
74.36
MG
108.62
39.87
68.75
ME
33.63
-47.94
ME'
13.89
-37.56
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-2.95 R2L
3.28 L2R
0.33 R2L
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
B
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
1.80 L2R
1.80 L2R
3.59 R2L
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
c
-435
-435
-435
-435
-435
-435
242086.88
261843.64
183122.54
85305.361
156715.49
39553.857
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.40
0.44
0.43
Mf DA
-79.99
Mf AD
79.99
Mf AB
-22.83
Mf CB
15.69
Mf CD
-8.30
0.5542
-79.99
38.67
-15.84
16.70
-8.47
8.34
-4.20
4.20
-2.08
2.08
-40.59
0.15
-40.44
(D)
0.5542
23.27
-0.24
3.62
-1.22
0.49
-0.54
0.24
-0.23
0.14
-0.14
25.38
Non-Sway
0.15
Sway
25.53
Final M
B
0.4458
-22.83
-0.20
-1.41
-0.98
0.48
-0.43
0.18
-0.19
0.11
-0.11
-25.38
-0.15
-25.53
0.4458
22.01
-2.82
-0.10
0.96
-0.49
0.36
-0.22
0.22
-0.09
0.09
19.92
-0.15
19.77
0.5542
-15.69
-3.50
-2.05
1.19
-0.32
0.45
-0.27
0.27
-0.12
0.12
-19.92
0.15
-19.77
0.5542
15.69
-4.09
-1.75
-0.64
0.59
-0.55
0.23
-0.23
0.14
-0.14
9.24
0.15
9.39
MF
34.90
20.34
14.56
MG
23.53
14.58
8.95
ME
33.63
-22.65
10.98
ME'
13.89
-12.27
1.61
-3.11 R2L
3.11 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-2.95 R2L
3.28 L2R
0.33 R2L
(A)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
Sway of 3.59
Sway of 0.33
(D)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
B
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
1.80 L2R
1.80 L2R
3.59 R2L
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
10.22
Mf DA
-23.27
D
0.4458
-8.30
-3.29
2.91
-0.52
0.39
-0.44
0.19
-0.19
0.11
-0.11
-9.24
-0.15
-9.39
0.4458
10.22
5.82
-1.65
0.79
-0.26
0.39
-0.22
0.22
-0.09
0.09
15.30
-0.15
15.15
Agg size
10
12.5
20
25
40
(A)
0.5542
-23.27
7.23
-0.12
0.98
-0.61
0.48
-0.27
0.27
-0.12
0.12
-15.30
0.15
-15.15
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
23.27
Steel
415
500
550
1.5
2.0
-3.11 R2L
3.11 L2R
455.70
500.98
487.40
D
0.4458
3.00
-1.34
-0.67
0.67
0.33
-0.33
-0.17
0.17
0.08
-0.08
1.66
0.15
(A)
0.5542
0.00
-1.66
-0.83
0.83
0.42
-0.42
-0.21
0.21
0.10
-0.10
-1.66
-0.15
Sway of 3.59
Sway of 0.33
Haunch
200
300
350
400
450
500
550
600
1.80
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
500.98
546.84
519.32
M
Fe
1.5 m x 3 m
30
500
20
30
10
18
1.50
3.00
2.80
300
2400
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
1.85
3.50
2.2
3.85
300
6.37
DFC Loads
EUDL for bending moment fm table
487.40
KN
519.32
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.200
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
14.90
0.61
4.29
56.64
60.93
16.94
18.05
Earth pressure
112.91
120.31
Ka
12.25
1.70
103.57
225.82
33.87
117.53
377.22
41.72
1.70
43.42
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
25.875
57.375
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
98.79 kn/m2
429.39
458.82
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-98.63
-102.31
-76.70
Top U R/c
MB
-88.22
-92.01
-66.40
Btm I R/c
MF
81.33
93.84
8.35
Top I R/c
MG
73.16
85.57
0.08
85.57
Side O R/c
ME
0.00
0.00
0.00
0.00
Side I R/c
ME'
30.58
26.85
52.46
52.46
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
85.57
93.84
102.31
0.00
92.01
52.46
NA
NA
NA
NA
Total
Ast Req
726.60
800.85
525.00
700.00
525.00
700.00
420.00
420.00
400.43
400.43
5618.30
Dia req
10.97
11.51
13.18
15.22
13.18
15.22
8.96
8.96
11.51
11.51
Sheer-V
246.39
273.53
155.08
Asv Req
312.92
357.54
166.89
5582.32
v
0.86
0.96
0.56
Dia Req
10.18
10.88
7.43
Pt
0.31
0.31
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
12
12
16
16
16
16
10
10
12
12
Total
spacing-L
150
150
150
vc
0.44
0.43
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
12
12
8
Per sqm
Joint
A
Mf AB
-86.30
Distribution Factors
Member Relative stiff Sum
AD
0.0232
0.0354
AB
0.0123
D.F
0.6542
0.3458
BA
BC
0.3458
0.6542
0.0123
0.0232
Mf CB
107.59
0.0354
Mf CD
-79.03
Mf DC
86.30
Mf DA
-119.97
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.6542
119.97
-22.02
11.01
-10.43
5.22
-5.13
2.56
-2.55
1.28
-1.27
98.63
B
0.3458
-86.30
-11.64
4.94
-5.51
2.62
-2.71
1.33
-1.35
0.67
-0.67
-98.63
0.3458
79.03
9.87
-5.82
5.24
-2.76
2.67
-1.36
1.34
-0.67
0.67
88.22
C
0.6542
-107.59
18.68
-9.34
9.92
-4.96
5.05
-2.52
2.54
-1.27
1.27
-88.22
0.6542
107.59
-18.68
9.34
-9.92
4.96
-5.05
2.52
-2.54
1.27
-1.27
88.22
0.3458
-79.03
-9.87
5.82
-5.24
2.76
-2.67
1.36
-1.34
0.67
-0.67
-88.22
D
MF
179.95
98.63
81.33
MG
161.38
88.22
73.16
ME
124.00
-93.43
ME'
124.00
-93.43
0.3458
86.30
11.64
-4.94
5.51
-2.62
2.71
-1.33
1.35
-0.67
0.67
98.63
Ast pro
870
870
773
773
773
773
524
524
435
435
6750
s x vc
0.51
0.50
0.56
Ast Pro
434.99
434.99
193.33
7088.72
a
1
1
2
2
2
2
0
0
1
1
0
10
10
12
12
12
12
8
8
10
10
8
2
2
3
3
3
3
1
1
12
12
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
2
2
1
12
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
2
3
2
3
0.25
0.50
0.25
0.50
0.25
0.50
0.42
0.53
0.42
0.53
0.42
0.53
Mf AD
119.97
Mf AB
-86.30
Mf CB
107.59
Mf CD
-41.19
Mf DC
47.94
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.6542
-119.97
22.02
-11.01
10.43
-5.22
5.13
-2.56
2.55
-1.28
1.27
-98.63
(D)
0.6542
119.97
-22.02
23.56
-18.64
7.36
-7.93
4.28
-4.16
2.03
-2.04
102.40
Non-Sway
-0.09
Sway
102.31
Final M
B
0.3458
-86.30
-11.64
4.94
-9.85
4.76
-4.19
2.08
-2.20
1.09
-1.08
-102.40
0.09
-102.31
0.3458
79.03
9.87
-5.82
9.52
-4.93
4.17
-2.10
2.18
-1.10
1.08
91.92
0.09
92.01
C
0.6542
-107.59
18.68
-21.72
18.02
-7.13
7.89
-4.22
4.13
-2.03
2.05
-91.92
-0.09
-92.01
0.6542
107.59
-43.44
9.34
-14.26
9.01
-8.44
3.94
-4.06
2.07
-2.05
59.70
-0.09
59.61
0.3458
-41.19
-22.96
12.45
-7.54
3.89
-4.46
2.26
-2.15
1.07
-1.08
-59.70
0.09
-59.61
MF
179.95
86.11
93.84
MG
161.38
75.81
85.57
ME
124.00
-97.16
ME'
66.85
-64.77
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-5.66 R2L
5.48 L2R
-0.19 L2R
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
B
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
2.12 L2R
2.12 L2R
4.24 R2L
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
c
-435
-435
-435
-435
-435
-435
301298.03
330423.08
368686.84
0
320024.2
189035.99
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.43
0.43
Mf DA
-119.97
Mf AD
119.97
Mf AB
-86.30
Mf CB
33.52
Mf CD
-41.19
0.6542
-119.97
47.12
-11.01
14.71
-9.32
8.56
-3.96
4.05
-2.08
2.06
-69.83
-0.09
-69.92
(D)
0.6542
45.90
26.43
-0.67
5.58
-4.76
4.19
-1.78
1.89
-1.00
0.99
76.78
Non-Sway
-0.09
Sway
76.70
Final M
B
0.3458
-86.30
13.97
-7.87
2.95
-1.64
2.21
-1.12
1.00
-0.51
0.52
-76.78
0.09
-76.70
0.3458
79.03
-15.74
6.99
-3.28
1.48
-2.23
1.11
-1.02
0.50
-0.52
66.31
0.09
66.40
0.6542
-33.52
-29.78
2.51
-6.21
4.98
-4.23
1.84
-1.93
1.00
-0.98
-66.31
-0.09
-66.40
0.6542
33.52
5.02
-14.89
9.97
-3.11
3.68
-2.11
2.00
-0.96
0.98
34.09
-0.09
34.00
MF
68.85
60.50
8.35
MG
50.28
50.20
0.08
ME
124.00
-71.55
52.46
ME'
66.85
-39.15
27.69
-5.57 R2L
5.57 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-5.66 R2L
5.48 L2R
-0.19 L2R
(A)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
Sway of 4.24
Sway of -0.19
(D)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
B
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
2.12 L2R
2.12 L2R
4.24 R2L
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
47.94
Mf DA
-45.90
D
0.3458
-41.19
2.65
-0.35
5.27
-2.51
1.94
-0.94
1.06
-0.53
0.52
-34.09
0.09
-34.00
0.3458
47.94
-0.70
1.33
-5.03
2.63
-1.88
0.97
-1.06
0.53
-0.51
44.22
0.09
44.31
Agg size
10
12.5
20
25
40
(A)
0.6542
-45.90
-1.33
13.22
-9.51
2.79
-3.55
2.09
-2.00
0.95
-0.96
-44.22
-0.09
-44.31
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
45.90
Steel
415
500
550
1.5
2.0
-5.57 R2L
5.57 L2R
455.70
500.98
487.40
D
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
(A)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
Sway of 4.24
Sway of -0.19
Haunch
200
300
350
400
450
500
550
600
3.00
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
500.98
546.84
519.32
M
Fe
1.5 m x 2.5 m
30
500
20
30
10
18
1.50
2.50
2.80
300
850
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
1.85
3.00
2.2
3.35
200
4.82
DFC Loads
EUDL for bending moment fm table
487.40
KN
519.32
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.458
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
12.53
0.27
4.29
26.88
31.17
20.58
21.93
Earth pressure
137.22
146.21
Ka
12.25
0.76
52.98
274.43
41.17
65.99
381.59
35.09
0.76
35.85
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
11.925
38.925
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
79.44 kn/m2
426.19
450.71
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-77.28
-80.20
-45.87
Top U R/c
MB
-69.02
-72.00
-37.67
-72.00
Btm I R/c
MF
101.30
110.00
9.31
Top I R/c
MG
94.23
102.85
2.17
102.85
Side O R/c
ME
-1.16
-22.88
0.00
-22.88
Side I R/c
ME'
0.00
0.00
30.22
30.22
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
102.85
110.00
80.20
22.88
72.00
30.22
NA
NA
NA
NA
Total
Ast Req
882.67
948.20
525.00
700.00
525.00
700.00
420.00
420.00
474.10
474.10
6069.08
Dia req
12.09
12.53
13.18
15.22
13.18
15.22
8.96
8.96
12.53
12.53
Sheer-V
291.64
317.63
106.47
Asv Req
378.87
421.82
166.18
6445.85
v
1.02
1.11
0.38
Dia Req
11.20
11.82
7.42
Pt
0.31
0.31
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
12
12
16
16
16
16
10
10
12
12
Total
spacing-L
150
150
150
vc
0.44
0.43
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
12
12
8
Per sqm
Joint
A
Mf AB
-50.31
Distribution Factors
Member Relative stiff Sum
AD
0.0232
0.0375
AB
0.0143
D.F
0.6186
0.3814
BA
BC
0.3814
0.6186
0.0143
0.0232
Mf CB
108.83
0.0375
Mf CD
-45.68
Mf DC
50.31
Mf DA
-119.06
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.6186
119.06
-42.52
21.26
-20.60
10.30
-10.22
5.11
-5.10
2.55
-2.55
77.28
B
0.3814
-50.31
-26.22
12.05
-12.70
6.23
-6.30
3.14
-3.15
1.57
-1.57
-77.28
0.3814
45.68
24.09
-13.11
12.45
-6.35
6.27
-3.15
3.14
-1.57
1.57
69.02
C
0.6186
-108.83
39.06
-19.53
20.19
-10.10
10.17
-5.09
5.10
-2.55
2.55
-69.02
0.6186
108.83
-39.06
19.53
-20.19
10.10
-10.17
5.09
-5.10
2.55
-2.55
69.02
0.3814
-45.68
-24.09
13.11
-12.45
6.35
-6.27
3.15
-3.14
1.57
-1.57
-69.02
D
MF
178.59
77.28
101.30
MG
163.25
69.02
94.23
ME
71.99
-73.15
ME'
71.99
-73.15
0.3814
50.31
26.22
-12.05
12.70
-6.23
6.30
-3.14
3.15
-1.57
1.57
77.28
Ast pro
870
870
773
773
773
773
524
524
435
435
6750
s x vc
0.51
0.50
0.56
Ast Pro
434.99
434.99
193.33
7088.72
a
2
2
2
2
2
2
0
0
1
1
0
12
12
12
12
12
12
8
8
10
10
8
3
3
3
3
3
3
1
1
16
16
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
2
2
1
12
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
2
3
2
3
0.25
0.50
0.25
0.50
0.25
0.50
0.42
0.53
0.42
0.53
0.42
0.53
Mf AD
119.06
Mf AB
-50.31
Mf CB
108.83
Mf CD
-17.88
Mf DC
22.12
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.6186
-119.06
42.52
-21.26
20.60
-10.30
10.22
-5.11
5.10
-2.55
2.55
-77.28
(D)
0.6186
119.06
-42.52
29.98
-25.99
11.94
-12.25
6.26
-6.21
3.08
-3.09
80.26
Non-Sway
-0.06
Sway
80.20
Final M
B
0.3814
-50.31
-26.22
12.05
-16.03
7.87
-7.56
3.77
-3.83
1.91
-1.90
-80.26
0.06
-80.20
0.3814
45.68
24.09
-13.11
15.73
-8.02
7.54
-3.78
3.81
-1.91
1.91
71.95
0.06
72.00
C
0.6186
-108.83
39.06
-28.13
25.51
-11.76
12.23
-6.22
6.19
-3.09
3.09
-71.95
-0.06
-72.00
0.6186
108.83
-56.26
19.53
-23.52
12.76
-12.44
6.12
-6.17
3.09
-3.09
48.84
-0.06
48.78
0.3814
-17.88
-34.69
18.49
-14.50
7.36
-7.67
3.86
-3.81
1.90
-1.90
-48.84
0.06
-48.78
MF
178.59
68.59
110.00
MG
163.25
60.39
102.85
ME
71.99
-76.10
ME'
30.00
-52.88
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-4.49 R2L
4.37 L2R
-0.13 L2R
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
B
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
2.01 L2R
2.01 L2R
4.01 R2L
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
c
-435
-435
-435
-435
-435
-435
362160.56
387310.18
289009.49
82462.931
250452.07
108911.7
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.43
0.43
Mf DA
-119.06
Mf AD
119.06
Mf AB
-50.31
Mf CB
18.82
Mf CD
-17.88
0.6186
-119.06
59.96
-21.26
23.88
-13.00
12.52
-6.13
6.16
-3.10
3.10
-56.92
-0.06
-56.98
(D)
0.6186
29.05
13.15
2.14
1.84
-1.98
1.67
-0.70
0.75
-0.40
0.39
45.93
Non-Sway
-0.06
Sway
45.87
Final M
B
0.3814
-50.31
8.11
-5.12
1.14
-0.72
1.03
-0.52
0.46
-0.24
0.24
-45.93
0.06
-45.87
0.3814
45.68
-10.24
4.06
-1.44
0.57
-1.04
0.51
-0.48
0.23
-0.24
37.61
0.06
37.67
0.6186
-18.82
-16.61
-0.29
-2.33
2.16
-1.69
0.74
-0.77
0.39
-0.39
-37.61
-0.06
-37.67
0.6186
18.82
-0.58
-8.31
4.32
-1.16
1.47
-0.84
0.79
-0.39
0.39
14.51
-0.06
14.45
MF
43.57
34.26
9.31
MG
28.23
26.06
2.17
ME
71.99
-41.77
30.22
ME'
30.00
-18.55
11.45
-4.43 R2L
4.43 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-4.49 R2L
4.37 L2R
-0.13 L2R
(A)
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
Sway of 4.01
Sway of -0.13
(D)
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
B
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
2.01 L2R
2.01 L2R
4.01 R2L
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
22.12
Mf DA
-29.05
D
0.3814
-17.88
-0.36
1.32
2.66
-1.22
0.91
-0.43
0.49
-0.25
0.24
-14.51
0.06
-14.45
0.3814
22.12
2.64
-0.18
-2.44
1.33
-0.86
0.45
-0.49
0.24
-0.24
22.59
0.06
22.65
Agg size
10
12.5
20
25
40
(A)
0.6186
-29.05
4.28
6.58
-3.96
0.92
-1.39
0.83
-0.80
0.38
-0.38
-22.59
-0.06
-22.65
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
29.05
Steel
415
500
550
1.5
2.0
-4.43 R2L
4.43 L2R
455.70
500.98
487.40
D
0.3814
3.00
-1.14
-0.57
0.57
0.29
-0.29
-0.14
0.14
0.07
-0.07
1.86
-0.06
(A)
0.6186
0.00
-1.86
-0.93
0.93
0.46
-0.46
-0.23
0.23
0.12
-0.12
-1.86
0.06
Sway of 4.01
Sway of -0.13
Haunch
200
300
350
400
450
500
550
600
2.50
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
500.98
546.84
519.32
M
Fe
1.5 m x 3 m
30
500
20
30
10
18
1.50
3.00
2.80
300
2400
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
1.85
3.50
2.2
3.85
300
6.37
DFC Loads
EUDL for bending moment fm table
487.40
KN
519.32
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.200
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
14.90
0.61
4.29
56.64
60.93
16.94
18.05
Earth pressure
112.91
120.31
Ka
12.25
1.70
103.57
225.82
33.87
117.53
377.22
41.72
1.70
43.42
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
25.875
57.375
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
98.79 kn/m2
429.39
458.82
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-98.63
-102.31
-76.70
Top U R/c
MB
-88.22
-92.01
-66.40
Btm I R/c
MF
81.33
93.84
8.35
Top I R/c
MG
73.16
85.57
0.08
85.57
Side O R/c
ME
0.00
0.00
0.00
0.00
Side I R/c
ME'
30.58
26.85
52.46
52.46
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
85.57
93.84
102.31
0.00
92.01
52.46
NA
NA
NA
NA
Total
Ast Req
726.60
800.85
525.00
700.00
525.00
700.00
420.00
420.00
400.43
400.43
5618.30
Dia req
10.97
11.51
13.18
15.22
13.18
15.22
8.96
8.96
11.51
11.51
Sheer-V
246.39
273.53
155.08
Asv Req
312.92
357.54
166.89
5582.32
v
0.86
0.96
0.56
Dia Req
10.18
10.88
7.43
Pt
0.31
0.31
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
12
12
16
16
16
16
10
10
12
12
Total
spacing-L
150
150
150
vc
0.44
0.43
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
12
12
8
Per sqm
Joint
A
Mf AB
-86.30
Distribution Factors
Member Relative stiff Sum
AD
0.0232
0.0354
AB
0.0123
D.F
0.6542
0.3458
BA
BC
0.3458
0.6542
0.0123
0.0232
Mf CB
107.59
0.0354
Mf CD
-79.03
Mf DC
86.30
Mf DA
-119.97
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.6542
119.97
-22.02
11.01
-10.43
5.22
-5.13
2.56
-2.55
1.28
-1.27
98.63
B
0.3458
-86.30
-11.64
4.94
-5.51
2.62
-2.71
1.33
-1.35
0.67
-0.67
-98.63
0.3458
79.03
9.87
-5.82
5.24
-2.76
2.67
-1.36
1.34
-0.67
0.67
88.22
C
0.6542
-107.59
18.68
-9.34
9.92
-4.96
5.05
-2.52
2.54
-1.27
1.27
-88.22
0.6542
107.59
-18.68
9.34
-9.92
4.96
-5.05
2.52
-2.54
1.27
-1.27
88.22
0.3458
-79.03
-9.87
5.82
-5.24
2.76
-2.67
1.36
-1.34
0.67
-0.67
-88.22
D
MF
179.95
98.63
81.33
MG
161.38
88.22
73.16
ME
124.00
-93.43
ME'
124.00
-93.43
0.3458
86.30
11.64
-4.94
5.51
-2.62
2.71
-1.33
1.35
-0.67
0.67
98.63
Ast pro
870
870
773
773
773
773
524
524
435
435
6750
s x vc
0.51
0.50
0.56
Ast Pro
434.99
434.99
193.33
7088.72
a
1
1
2
2
2
2
0
0
1
1
0
10
10
12
12
12
12
8
8
10
10
8
2
2
3
3
3
3
1
1
12
12
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
2
2
1
12
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
2
3
2
3
0.25
0.50
0.25
0.50
0.25
0.50
0.42
0.53
0.42
0.53
0.42
0.53
Mf AD
119.97
Mf AB
-86.30
Mf CB
107.59
Mf CD
-41.19
Mf DC
47.94
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.6542
-119.97
22.02
-11.01
10.43
-5.22
5.13
-2.56
2.55
-1.28
1.27
-98.63
(D)
0.6542
119.97
-22.02
23.56
-18.64
7.36
-7.93
4.28
-4.16
2.03
-2.04
102.40
Non-Sway
-0.09
Sway
102.31
Final M
B
0.3458
-86.30
-11.64
4.94
-9.85
4.76
-4.19
2.08
-2.20
1.09
-1.08
-102.40
0.09
-102.31
0.3458
79.03
9.87
-5.82
9.52
-4.93
4.17
-2.10
2.18
-1.10
1.08
91.92
0.09
92.01
C
0.6542
-107.59
18.68
-21.72
18.02
-7.13
7.89
-4.22
4.13
-2.03
2.05
-91.92
-0.09
-92.01
0.6542
107.59
-43.44
9.34
-14.26
9.01
-8.44
3.94
-4.06
2.07
-2.05
59.70
-0.09
59.61
0.3458
-41.19
-22.96
12.45
-7.54
3.89
-4.46
2.26
-2.15
1.07
-1.08
-59.70
0.09
-59.61
MF
179.95
86.11
93.84
MG
161.38
75.81
85.57
ME
124.00
-97.16
ME'
66.85
-64.77
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-5.66 R2L
5.48 L2R
-0.19 L2R
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
B
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
2.12 L2R
2.12 L2R
4.24 R2L
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
c
-435
-435
-435
-435
-435
-435
301298.03
330423.08
368686.84
0
320024.2
189035.99
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.43
0.43
Mf DA
-119.97
Mf AD
119.97
Mf AB
-86.30
Mf CB
33.52
Mf CD
-41.19
0.6542
-119.97
47.12
-11.01
14.71
-9.32
8.56
-3.96
4.05
-2.08
2.06
-69.83
-0.09
-69.92
(D)
0.6542
45.90
26.43
-0.67
5.58
-4.76
4.19
-1.78
1.89
-1.00
0.99
76.78
Non-Sway
-0.09
Sway
76.70
Final M
B
0.3458
-86.30
13.97
-7.87
2.95
-1.64
2.21
-1.12
1.00
-0.51
0.52
-76.78
0.09
-76.70
0.3458
79.03
-15.74
6.99
-3.28
1.48
-2.23
1.11
-1.02
0.50
-0.52
66.31
0.09
66.40
0.6542
-33.52
-29.78
2.51
-6.21
4.98
-4.23
1.84
-1.93
1.00
-0.98
-66.31
-0.09
-66.40
0.6542
33.52
5.02
-14.89
9.97
-3.11
3.68
-2.11
2.00
-0.96
0.98
34.09
-0.09
34.00
MF
68.85
60.50
8.35
MG
50.28
50.20
0.08
ME
124.00
-71.55
52.46
ME'
66.85
-39.15
27.69
-5.57 R2L
5.57 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-5.66 R2L
5.48 L2R
-0.19 L2R
(A)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
Sway of 4.24
Sway of -0.19
(D)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
B
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
2.12 L2R
2.12 L2R
4.24 R2L
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
47.94
Mf DA
-45.90
D
0.3458
-41.19
2.65
-0.35
5.27
-2.51
1.94
-0.94
1.06
-0.53
0.52
-34.09
0.09
-34.00
0.3458
47.94
-0.70
1.33
-5.03
2.63
-1.88
0.97
-1.06
0.53
-0.51
44.22
0.09
44.31
Agg size
10
12.5
20
25
40
(A)
0.6542
-45.90
-1.33
13.22
-9.51
2.79
-3.55
2.09
-2.00
0.95
-0.96
-44.22
-0.09
-44.31
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
45.90
Steel
415
500
550
1.5
2.0
-5.57 R2L
5.57 L2R
455.70
500.98
487.40
D
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
(A)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
Sway of 4.24
Sway of -0.19
Haunch
200
300
350
400
450
500
550
600
3.00
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
500.98
546.84
519.32
M
Fe
1.5 m x 3 m
30
500
20
30
10
18
1.50
3.00
2.80
300
2400
50
60
150
m
m
m
mm
mm
mm
mm
mm
Enter Value
B
0.35
0.35
1.85
3.50
2.2
3.85
300
6.37
DFC Loads
EUDL for bending moment fm table
487.40
KN
519.32
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
1.000
0.200
2.4.2.1 a & b
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Case-I
8.75
8.75
14.90
0.61
4.29
56.64
60.93
16.94
18.05
Earth pressure
112.91
120.31
Ka
12.25
1.70
103.57
225.82
33.87
117.53
377.22
41.72
1.70
43.42
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
25.875
57.375
Base
kn/m2
kn/m2
kn/m2
kn/m2
kn/m2
At Bottom
98.79 kn/m2
429.39
458.82
Kn/m2
Kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-98.63
-102.31
-76.70
Top U R/c
MB
-88.22
-92.01
-66.40
Btm I R/c
MF
81.33
93.84
8.35
Top I R/c
MG
73.16
85.57
0.08
85.57
Side O R/c
ME
0.00
0.00
0.00
0.00
Side I R/c
ME'
30.58
26.85
52.46
52.46
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
85.57
93.84
102.31
0.00
92.01
52.46
NA
NA
NA
NA
Total
Ast Req
726.60
800.85
525.00
700.00
525.00
700.00
420.00
420.00
400.43
400.43
5618.30
Dia req
10.97
11.51
13.18
15.22
13.18
15.22
8.96
8.96
11.51
11.51
Sheer-V
246.39
273.53
155.08
Asv Req
312.92
357.54
166.89
5582.32
v
0.86
0.96
0.56
Dia Req
10.18
10.88
7.43
Pt
0.31
0.31
0.28
spacing
130
130
260
260
260
260
150
150
260
260
Dia pro
12
12
16
16
16
16
10
10
12
12
Total
spacing-L
150
150
150
vc
0.44
0.43
0.43
Spacing-W
260
260
260
s
1.15
1.15
1.28
Dia Pro
12
12
8
Per sqm
Joint
A
Mf AB
-86.30
Distribution Factors
Member Relative stiff Sum
AD
0.0232
0.0354
AB
0.0123
D.F
0.6542
0.3458
BA
BC
0.3458
0.6542
0.0123
0.0232
Mf CB
107.59
0.0354
Mf CD
-79.03
Mf DC
86.30
Mf DA
-119.97
E'
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
0.6542
119.97
-22.02
11.01
-10.43
5.22
-5.13
2.56
-2.55
1.28
-1.27
98.63
B
0.3458
-86.30
-11.64
4.94
-5.51
2.62
-2.71
1.33
-1.35
0.67
-0.67
-98.63
0.3458
79.03
9.87
-5.82
5.24
-2.76
2.67
-1.36
1.34
-0.67
0.67
88.22
C
0.6542
-107.59
18.68
-9.34
9.92
-4.96
5.05
-2.52
2.54
-1.27
1.27
-88.22
0.6542
107.59
-18.68
9.34
-9.92
4.96
-5.05
2.52
-2.54
1.27
-1.27
88.22
0.3458
-79.03
-9.87
5.82
-5.24
2.76
-2.67
1.36
-1.34
0.67
-0.67
-88.22
D
MF
179.95
98.63
81.33
MG
161.38
88.22
73.16
ME
124.00
-93.43
ME'
124.00
-93.43
0.3458
86.30
11.64
-4.94
5.51
-2.62
2.71
-1.33
1.35
-0.67
0.67
98.63
Ast pro
870
870
773
773
773
773
524
524
435
435
6750
s x vc
0.51
0.50
0.56
Ast Pro
434.99
434.99
193.33
7088.72
a
1
1
2
2
2
2
0
0
1
1
0
10
10
12
12
12
12
8
8
10
10
8
2
2
3
3
3
3
1
1
12
12
16
16
16
16
10
10
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
2
2
1
12
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.027982
0.027982
0.027982
0.028687
0.027982
0.028687
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
2
3
2
3
2
3
0.25
0.50
0.25
0.50
0.25
0.50
0.42
0.53
0.42
0.53
0.42
0.53
Mf AD
119.97
Mf AB
-86.30
Mf CB
107.59
Mf CD
-41.19
Mf DC
47.94
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach
D
(A)
0.6542
-119.97
22.02
-11.01
10.43
-5.22
5.13
-2.56
2.55
-1.28
1.27
-98.63
(D)
0.6542
119.97
-22.02
23.56
-18.64
7.36
-7.93
4.28
-4.16
2.03
-2.04
102.40
Non-Sway
-0.09
Sway
102.31
Final M
B
0.3458
-86.30
-11.64
4.94
-9.85
4.76
-4.19
2.08
-2.20
1.09
-1.08
-102.40
0.09
-102.31
0.3458
79.03
9.87
-5.82
9.52
-4.93
4.17
-2.10
2.18
-1.10
1.08
91.92
0.09
92.01
C
0.6542
-107.59
18.68
-21.72
18.02
-7.13
7.89
-4.22
4.13
-2.03
2.05
-91.92
-0.09
-92.01
0.6542
107.59
-43.44
9.34
-14.26
9.01
-8.44
3.94
-4.06
2.07
-2.05
59.70
-0.09
59.61
0.3458
-41.19
-22.96
12.45
-7.54
3.89
-4.46
2.26
-2.15
1.07
-1.08
-59.70
0.09
-59.61
MF
179.95
86.11
93.84
MG
161.38
75.81
85.57
ME
124.00
-97.16
ME'
66.85
-64.77
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-5.66 R2L
5.48 L2R
-0.19 L2R
Check:
Final Hor Rcn at A
Final Hor Rcn at D
(D)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
B
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
2.12 L2R
2.12 L2R
4.24 R2L
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
c
-435
-435
-435
-435
-435
-435
301298.03
330423.08
368686.84
0
320024.2
189035.99
35
0.37
0.44
0.56
40
0.39
0.47
0.59
0.7
0.89
1.01
0.74
0.93
1.06
0.44
0.43
0.43
Mf DA
-119.97
Mf AD
119.97
Mf AB
-86.30
Mf CB
33.52
Mf CD
-41.19
0.6542
-119.97
47.12
-11.01
14.71
-9.32
8.56
-3.96
4.05
-2.08
2.06
-69.83
-0.09
-69.92
(D)
0.6542
45.90
26.43
-0.67
5.58
-4.76
4.19
-1.78
1.89
-1.00
0.99
76.78
Non-Sway
-0.09
Sway
76.70
Final M
B
0.3458
-86.30
13.97
-7.87
2.95
-1.64
2.21
-1.12
1.00
-0.51
0.52
-76.78
0.09
-76.70
0.3458
79.03
-15.74
6.99
-3.28
1.48
-2.23
1.11
-1.02
0.50
-0.52
66.31
0.09
66.40
0.6542
-33.52
-29.78
2.51
-6.21
4.98
-4.23
1.84
-1.93
1.00
-0.98
-66.31
-0.09
-66.40
0.6542
33.52
5.02
-14.89
9.97
-3.11
3.68
-2.11
2.00
-0.96
0.98
34.09
-0.09
34.00
MF
68.85
60.50
8.35
MG
50.28
50.20
0.08
ME
124.00
-71.55
52.46
ME'
66.85
-39.15
27.69
-5.57 R2L
5.57 L2R
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
-5.66 R2L
5.48 L2R
-0.19 L2R
(A)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
Sway of 4.24
Sway of -0.19
(D)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
B
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
C
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
2.12 L2R
2.12 L2R
4.24 R2L
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
max CS,CH
Concrete
15
20
25
30
35
40
Mf DC
47.94
Mf DA
-45.90
D
0.3458
-41.19
2.65
-0.35
5.27
-2.51
1.94
-0.94
1.06
-0.53
0.52
-34.09
0.09
-34.00
0.3458
47.94
-0.70
1.33
-5.03
2.63
-1.88
0.97
-1.06
0.53
-0.51
44.22
0.09
44.31
Agg size
10
12.5
20
25
40
(A)
0.6542
-45.90
-1.33
13.22
-9.51
2.79
-3.55
2.09
-2.00
0.95
-0.96
-44.22
-0.09
-44.31
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
Hor Reaction at D
3.0
3.5
4.0
4.5
5.0
5.5
6.0
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
600
186.49
365.05
455.70
500.98
528.22
546.35
572.12
648.56
710.30
789.39
891.51
976.37
1045.16
1113.95
1170.80
1227.65
1334.56
1399.73
9.5
1458.34
1458.34
1458.34
1458.34
10.0
1511.16
1511.16
1511.16
1511.16
Check:
Hor Reaction at A
Rails
52
60
Mf AD
45.90
Steel
415
500
550
1.5
2.0
-5.57 R2L
5.57 L2R
455.70
500.98
487.40
D
0.3458
3.00
-1.04
-0.52
0.52
0.26
-0.26
-0.13
0.13
0.06
-0.06
1.96
-0.09
(A)
0.6542
0.00
-1.96
-0.98
0.98
0.49
-0.49
-0.25
0.25
0.12
-0.12
-1.96
0.09
Sway of 4.24
Sway of -0.19
Haunch
200
300
350
400
450
500
550
600
3.00
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1718.04
1718.04
1759.49
1759.49
1759.49
1759.49
500.98
546.84
519.32
6mx5m
35
550
20
30
10
18
Dimensions (Input)
Clear span of box, m
Clear height of box, m
Barrel Length of bridge
Ballast cushion
Earth cushion
Clear Cover top
Clear Cover side
Thickness of wearing coat
6.00
5.00
5.30
300
1000
50
60
150
m
m
m
mm
mm
mm
mm
mm
Dimensions (Output)
Thickness of top & Bottom slab
Thickness of side walls
Effective span
Effective height
Overall span of bridge
Overall height of bridge
Size of haunch
Dispersion width
2.745+Bst cu+le/2
0.6
0.6
6.60
5.75
7.2
6.35
600
7.35
M
Fe
Enter Value
DFC Loads
EUDL for bending moment fm table
1058.92
KN
1299.01
KN
Coefficient of DA
0.15+8/(6+le)
CDA with ballast+earth cushion
Loads Kn/m
Dead load of Box
Top slab
Bottom slab
Side walls
Haunches
Superimposed dead load (SIDL)
Rails & Sleepers
Ballast & Earth
Superimposed live load (SILL) (with CDA)
For BM
0.785
0.340
Case-I
15
15
11.70
0.68
2.26
29.76
32.02
40.57
2.4.2.1 a & b
E'
For Shear
49.77
Derailment Load
For BM
For Shear
6.09
7.47
Earth pressure
Ka
21.00
1.91
54.44
81.14
12.17
77.35
170.66
32.77
1.91
34.68
Cos 2
Cos Cos 1
Ka=
Ka-rest=
Sin Sin
Cos Cos
0.3085
0.5
Ka rest
14.4
66.15
At top
8.88
At Bottom
40.81
Earth pressure due to live & dead load surcharge
S, live t/m
162.50
V, dead t/m
43.68
Surcharge pressure
At top
21.20
At Bottom
12.00
Earth pressure (with load factors)
At top
15.10
At Bottom
69.38
Earth pressure & Surcharge Pressure (with load factors)
At top
51.14
At Bottom
89.78
kn/m2
kn/m2
Kn/m2
Kn/m2
220.34
269.39
Base
kn/m2
kn/m2
kn/m2
kn/m2
(Without water)
(With full water)
Case-I
Case-II
Case-III Design BM
Btm U R/c
MA
-506.26
-516.77
-335.76
Top U R/c
MB
-403.91
-413.44
-232.43
-413.44
Btm I R/c
MF
611.81
629.43
302.37
Top I R/c
MG
525.32
543.91
216.86
543.91
Side O R/c
ME
-163.89
-234.30
-53.29
-234.30
Side I R/c
ME'
0.00
0.00
7.10
7.10
Reinforcement Calculation
RDSO sym
b
d
c
a1
a2
e
h2
h1
f1
f2
Position
Top slab mid span
Bottom slab mid span
Bottom U Rod
Side outer
Top U-Rod
Side inner
Distribution side
Distribution top/btm
Top Haunch
Bottom Haunch
Moment
Ast Req
543.91
2299.48
629.43
2698.62
516.77
1261.86
234.30
1200.00
413.44
915.60
7.10
1200.00
NA
720.00
NA
720.00
NA
1349.31
NA
1349.31
Total 13714.18
Dia req
17.11
18.54
17.93
17.48
15.27
17.48
11.73
11.73
18.54
18.54
spacing
100
100
200
200
200
200
150
150
200
200
Dia pro
20
20
20
20
16
20
12
12
20
20
Total
Ast pro
3142
3142
1571
1571
1005
1571
754
754
1571
1571
16650
Per sqm
Sheer-V
517.90
611.54
238.88
Asv Req
329.63
435.29
166.18
6207.32
v
0.97
1.14
0.45
Dia Req
9.16
10.53
6.51
Pt
0.59
0.59
0.30
spacing-L
150
150
150
vc
s x vc
s
0.98
0.57
0.98
0.50
1.04
0.48
Spacing-W Dia Pro Ast Pro
200
10
392.70
200
12
565.49
200
8
251.33
8063.42
Per sqm
0.58
0.50
0.46
Joint
A
Mf AB
-204.78
Distribution Factors
Member Relative stiff Sum
AD
0.0327
0.0703
AB
0.0376
D.F
0.4656
0.5344
BA
BC
0.5344
0.4656
0.0376
0.0327
Mf CB
619.49
0.0703
Mf CD
-183.49
Mf DC
204.78
Mf DA
-745.38
Mf AD
745.38
DFs
FEMs
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
C.Over
Balance
(D)
A
0.4656
0.5344
745.38
-204.78
-251.70
-288.91
125.85
116.50
-112.84
-129.52
56.42
65.72
-56.87
-65.27
28.43
32.60
-28.42
-32.62
14.21
16.31
-14.21
-16.31
506.26
-506.26
B
0.5344
183.49
233.01
-144.45
131.44
-64.76
65.21
-32.64
32.62
-16.31
16.31
403.91
C
0.4656
-619.49
203.00
-101.50
114.51
-57.26
56.81
-28.40
28.42
-14.21
14.21
-403.91
0.4656
619.49
-203.00
101.50
-114.51
57.26
-56.81
28.40
-28.42
14.21
-14.21
403.91
D
0.5344
-183.49
-233.01
144.45
-131.44
64.76
-65.21
32.64
-32.62
16.31
-16.31
-403.91
0.5344
204.78
288.91
-116.50
129.52
-65.72
65.27
-32.60
32.62
-16.31
16.31
506.26
MF
1118.08
MG
929.23
403.91
ME
291.20
-455.09
ME'
291.20
-455.09
506.26
611.81
525.32
0.4656
-745.38
251.70
-125.85
112.84
-56.42
56.87
-28.43
28.42
-14.21
14.21
-506.26
a
3
3
3
3
2
3
1
1
0
1
0
16
16
16
16
12
16
10
10
8
10
8
4
4
4
4
3
4
2
2
20
20
20
20
16
20
12
12
1
2
3
0.15
0.25
0.50
4
5
6
1.00
2.00
3.00
1
2
1
10
12
10
8
10
12
16
20
25
32
40
0
1
2
3
4
5
6
7
8
10
12
16
20
25
32
40
0.01546
0.01546
0.01546
0.015665
0.01546
0.015665
-478.5
-478.5
-478.5
-478.5
-478.5
-478.5
1
2
3
20
0.31
0.37
0.47
25
0.31
0.4
0.5
30
0.36
0.42
0.53
35
0.37
0.44
0.56
4
5
6
0.59
0.74
0.85
0.63
0.8
0.91
0.67
0.85
0.97
0.7
0.89
1.01
3
4
3
4
2
3
0.50
1.00
0.50
1.00
0.25
0.50
0.56
0.70
0.56
0.70
0.44
0.56
0.58
0.50
0.46
Mf AB
-204.78
Mf CB
619.49
Mf CD
-101.43
Mf DC
131.33
Mf DA
-745.38
Mf AD
745.38
Moment Distribution-Case-II (D.L+E.P full & L.L only on box and one approach)
(A)
(D)
A
0.4656
0.5344
745.38
-204.78
-251.70
-288.91
142.95
116.50
-120.80
-138.65
61.52
70.82
-61.62
-70.73
30.58
35.04
-30.55
-35.07
15.40
17.68
-15.40
-17.68
515.76
-515.76
Non-Sway
1.00
-1.00
Sway
516.77
-516.77
Final M
B
0.5344
183.49
233.01
-144.45
141.65
-69.33
70.09
-35.36
35.36
-17.54
17.54
414.45
-1.00
413.44
C
0.4656
-619.49
203.00
-120.60
123.41
-61.82
61.06
-30.80
30.81
-15.28
15.28
-414.45
1.00
-413.44
0.4656
619.49
-241.20
101.50
-123.65
61.70
-61.61
30.53
-30.56
15.40
-15.40
356.20
1.00
357.21
D
0.5344
-101.43
-276.86
164.08
-141.93
70.62
-70.71
35.10
-35.07
17.68
-17.68
-356.20
-1.00
-357.21
0.5344
131.33
328.16
-138.43
141.23
-70.96
70.20
-35.36
35.36
-17.54
17.54
461.53
-1.00
460.53
MF
1118.08
MG
929.23
385.33
ME
291.20
-465.10
ME'
174.57
-408.87
488.65
629.43
543.91
-15.35 R2L
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
0.4656
-745.38
285.89
-125.85
123.05
-60.40
61.16
-30.81
30.81
-15.28
15.28
-461.53
1.00
-460.53
15.96 L2R
0.61 R2L
Check:
Final Hor Rcn at A
-15.66
15.66
B
0.5344
3.00
-1.60
-0.80
0.80
0.5344
3.00
-1.60
-0.80
0.80
C
0.4656
0.00
-1.40
-0.70
0.70
0.4656
0.00
-1.40
-0.70
0.70
D
0.5344
3.00
-1.60
-0.80
0.80
0.5344
3.00
-1.60
-0.80
0.80
(A)
0.4656
0.00
-1.40
-0.70
0.70
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
0.42 L2R
0.42 L2R
0.85 R2L
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
Sway of
Sway of
c
1018552.4
1178700.6
979652.3
444171.92
769196.76
13461.065
40
0.39
0.47
0.59
0.74
0.93
1.06
Mf AB
-204.78
Mf CB
280.78
Mf CD
-101.43
Mf DC
131.33
Mf DA
-406.68
Mf AD
406.68
(D)
0.4656
406.68
-94.00
64.10
-41.95
22.10
-22.19
10.87
-10.84
5.55
-5.55
334.75
Non-Sway
1.00
Sway
335.76
Final M
B
0.5344
-204.78
-107.90
26.00
-48.15
25.57
-25.48
12.42
-12.44
6.37
-6.37
-334.75
-1.00
-335.76
0.5344
183.49
52.00
-53.95
51.14
-24.07
24.84
-12.74
12.73
-6.22
6.22
233.44
-1.00
232.43
MF
610.01
MG
ME
ME'
0.4656
280.78
-83.51
22.65
-44.80
22.28
-22.18
10.82
-10.85
5.55
-5.55
175.20
1.00
176.20
D
0.5344
-101.43
-95.85
73.57
-51.42
25.36
-25.46
12.47
-12.45
6.37
-6.37
-175.20
-1.00
-176.20
0.5344
131.33
147.15
-47.92
50.73
-25.71
24.95
-12.73
12.73
-6.22
6.22
280.52
-1.00
279.52
307.64
302.37
421.17
204.32
216.86
291.20
-284.10
174.57
-227.86
-15.35 R2L
Hor Reaction at A
Hor Reaction at D
R2L
L2R
C
0.4656
-280.78
45.30
-41.75
44.56
-22.40
21.64
-11.09
11.09
-5.42
5.42
-233.44
1.00
-232.43
15.96 L2R
0.61 R2L
0.4656
-406.68
128.20
-47.00
44.20
-20.97
21.74
-11.10
11.09
-5.42
5.42
-280.52
1.00
-279.52
Check:
Hor Reaction at A
-15.66
15.66
Hor Reaction at D
B
0.5344
3.00
-1.60
-0.80
0.80
0.5344
3.00
-1.60
-0.80
0.80
C
0.4656
0.00
-1.40
-0.70
0.70
0.4656
0.00
-1.40
-0.70
0.70
D
0.5344
3.00
-1.60
-0.80
0.80
0.5344
3.00
-1.60
-0.80
0.80
(A)
0.4656
0.00
-1.40
-0.70
0.70
0.85
0.61
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
Hor Reaction at A
Hor Reaction at D
Value of P preventing side sway
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
0.42 L2R
0.42 L2R
0.85 R2L
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
0.40
-0.40
-0.20
0.20
0.10
-0.10
1.40
1.00
0.35
-0.35
-0.17
0.17
0.09
-0.09
-1.40
-1.00
Sway of
Sway of
Concrete
15
20
25
30
35
40
Steel
415
500
550
Agg size
10
12.5
20
25
40
Rails
52
60
6.00
(A)
EUDL for BM in KN
L in m
200
0.5
350.74
1.0
492.45
1.5
540.57
2.0
564.68
2.5
579.18
3.0
588.78
3.5
608.58
4.0
680.51
4.5
738.53
5.0
815.07
5.5
914.73
6.0
997.64
6.5
1062.86
7.0
1128.08
7.5
1185.75
8.0
1243.42
8.5
1334.56
9.0
1399.73
400
243.53
428.75
498.13
532.83
553.70
567.52
590.35
664.54
724.51
802.13
903.07
987.06
1053.06
1119.06
1177.42
1235.78
1334.56
1399.73
300
287.53
460.50
519.40
548.80
623.28
731.67
809.19
867.30
924.92
1016.65
1097.99
1165.81
1243.28
1320.75
1397.68
1474.61
1620.43
1671.88
400
243.53
428.65
498.13
532.83
597.80
710.50
790.96
851.42
908.75
998.82
1080.55
1149.74
1226.18
1302.62
1380.43
1458.24
1620.43
1671.88
9.5
1458.34
1458.34
1458.34
1458.34
9.5
1718.04
1718.04
1718.04
10.0
1511.16
1511.16
1511.16
1511.16
10.0
1759.49
1759.49
1759.49
10.5
1799.49
1799.49
1799.49
1266.16
1348.29
1299.01
6.5
7.0
R2L
L2R
300
287.43
460.60
519.40
548.80
566.44
578.20
599.47
672.48
731.57
808.50
908.95
992.25
1058.11
1123.96
1181.73
1239.50
1334.56
1399.73
1045.16
1113.95
1058.92
7.0
7.5
0.85
0.61
600
186.49
365.05
455.70
500.98
546.84
667.97
754.60
819.67
878.08
959.42
1045.86
1117.98
1192.07
1266.16
1348.29
1430.41
1620.43
1671.88
1718.04
1759.49
1799.49