ENGINEERING MANUAL

PIPING DESIGN
ISOMETRIC DWG.
REV.: 2
DATE : 1998.05.10

ENGINEERING MANUAL

09
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

PAGE

OF

Page

1.

2.

3.

-----------------------------------------------------------------------

1.1

1.2

Manual

1.3

------------------------------------------------------ 1
---------------------------------------------------

-----------------------------------------------------------

Isometric Drawing

---------------------------------------

2.1

Drawing

2.2

Job Isometric Drawing

------------------------------------------

2.3

Isometric Drawing

-----------------------------------------

-----------------------------------------------------------

-------------------------------------------------------------

--------------------------------------------------------------------

---------------------------------------------------

3.1

3.2

3.3

------------------------------------------------------------- 11

3.4

------------------------------------------------------------ 12

3.5

Job

------------------------------------------------------------ 12

ENGINEERING MANUAL
ISOMETRIC DWG.
DATE :

REV : 2
4.

5.

6.

1998.05.10
PAGE

---------------------------------------------------------------------13OF
4.1

4.2

Isometric Piping Drawing

4.3

Isometric Drawing for Piping Fabrication

-------------------------- 24

4.4

Isometric Drawing for Piping Construction

------------------------- 32

4.5

Symbol

------------------------------------------ 17

------------------------------------------------------------------- 33

----------------------------------------------------------------------- 37

5.1

5.2

---------------------------------------------------------------- 13

-----------------------------------------------------------------

37

---------------------------------------------------------------------- 37
------------------------------------------------------------------------ 38

APPENDIX
I.

Isometric Piping Drawings for 1.1/2B and Smaller Piping

II.

Isometric Piping Drawings

III. Isometric Drawings for Piping Fabrication


VI

Isometric Drawings for Piping Construction

V.

Isometric Drawings by PASCE

VI.

Isometric Drawings by COMPIPE

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

PAGE

OF

Page

1.

2.

3.

-----------------------------------------------------------------------

1.1

1.2

Manual

1.3

------------------------------------------------------ 1
---------------------------------------------------

-----------------------------------------------------------

Isometric Drawing

---------------------------------------

2.1

Drawing

2.2

Job Isometric Drawing

------------------------------------------

2.3

Isometric Drawing

-----------------------------------------

-----------------------------------------------------------

-------------------------------------------------------------

--------------------------------------------------------------------

---------------------------------------------------

3.1

3.2

3.3

------------------------------------------------------------- 11

3.4

------------------------------------------------------------ 12

3.5

Job

------------------------------------------------------------ 12

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

4.5

1998.05.10

PAGE

32

OF

37

Symbol
4.5.1

Isometric DWG. Symbol


(1)

"H-103" Piping Parts Standard Symbol .


Line Fitting, Joint Valve Symbol 4.5.3, 4.5.4, 4.5.5
.

(2)

"H-103" piping Parts 10

Special

Number . 9t .
Joint Symbol .
(3)

10 Tag NO. . . (
.)

4.5.2

General Symbol

Tag NO.
Special
Parts

Drawing
Symbol

Symbol

Remarks

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

6.

1998.05.10

PAGE

37

OF

37

1982.11.30

, Manual Computer Isometric Drawing


,
.
-

:

1

1990.11.30

- 90
-

- Manual

1998.05.10

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

2.2

1998.05.10

PAGE

Job Isometric Drrawing


(1)

SECL .

OF

37

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

PAGE

OF

37

Customer Material Teke-Off 3 Isometric


DWG. JOB .
(2)

3 Isometric DWG. Job . 2.3


.

DWG. Isometric DWG. for


Item

Isometric DWG. for

Isometric DWG. for

Material

Pipeline

Piping

Take-Off

(Isometric Drawing)

Fabrication

20%

100%

Man-Hour

Isometric DWG. for


Piping Construction
280%

200%
(by Hand Writing)

1) Piping DWG.
Isometric

1) Prefabrication

1) Prefabrication

1)

work

Model

DWG.

Site

DWG.

Isometric DWG.

Isometric DWG.

Piping DWG.

.
2) Isometric

Piping DWG.

Low Grade

DWG. 2B

Smooth

LINE

2)

2) Prefabrication

Isometric Piping DWG.

1.1/2B

Line

3)
2) Customer

3) Man-Hour

Isometric DWG.

Type

Merit


3)
.

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

2.3

1998.05.10

PAGE

OF

Isometric DWG.

Isometric

Isometric

Isometric

Drawig for

DWG.

Drawig for

Material

for Pipeline

Piping

Take-Off

(Isometric DWG.)

Fabrication

SPEC & Coding

SPEC & Coding

SPEC &Coding

SPEC & Coding

Language

Language

Language

Language

A11

2B

2B

2B

1) Fitting

2) Valve

Item

1. Bill of Material
2. Line Size Range

Isometric
Drawig For Piping
Construction

3. Dimensions

(Face to Face)
3) Special Parts

4) Gasket

4. Drain & Vent

All Parts

(Valve,Flange

All Parts

Coupling

All Parts

Coupling

(Valve, Flange

Only

(Valve, Flange

5. Valve No.

Coupling

6. Connection No.

For Drawing
7. Rack Column No.

Coupling

and Dimensions
Indicating
Column Location
8. Support
1) Location

2) Markimg

(X)

3) Trunnion

(X)

Detail at Elbow
9. Field Weld Point

37

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

Item

PAGE

OF

Isometric

Isometric DWG.

Isometric

Isometric

Drawing for

Drawing

Drawing

Drawing

Material

for Pipeline

for Piping

for Piping

Take-Off

(Isometric DWG.)

Fabrication

Construction

10. Spool Piece No.

11. Indication of random

12. Cutting Length

13. Detail for Welding

14. Brand of Electrode

15. Stress Relief

(X)

(X)

(X)

(X)

(X)

(X)

Length of Pipe

Preparation

(Yes or No)
16. X-Ray Examination
Class
17. Test Pressure
(Liquid or Gas)
18. Insulation Code
(H,C,P etc)

37

. X .
( X ) Customer .
One Item 5% Man-Hour .

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

3.

1998.05.10

PAGE

OF


Isometric DWG 2.1 , Isometric DWG. Material Take-Off
.
3.1


(1)

2.2 Piping Construction Work DWG.


.

(2)

(3)

Isometric DWG. .
1)

Isometric DWG. , ,

2)

Prefabrication Maker

3)

Shipping

A.F.C . (1) ,
Schedule , Piping DWG. A.F.C
Job , REV.
.

Man-Hour REV. Time

.
3.2


(1)

DWG. NO. "SEM-3112" .

K7270:- TANK - 460

1)

2)

3)

4)

1)

Size (A3)

2)

Job No.

3)

Area name

4)

Isometric DWG. No. (460 - 489)

37

ENGINEERING MANUAL

09
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

(2)

PAGE

Isometric DWG. Line Reference .

Line Reference

UPA - 8B - 5504 - AAI


1)

1)

Fluid

2)

Pipe Size

3)

Line No.

4)

Class Designation

2)

3)

4)

OF

37

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

3.3

1998.05.10

PAGE

10

OF

37

Isometric DWG.
Type
*


(, ,
,
(3.5 Job )
Isometric DWG
Instruction

(1)

Piping DWG.

(6)

( Model )

Special Piping
Parts DWG.

(2)

H-103

(7)

Take-Off

(3)

Line Schedule

(8)

Instruments

(4)

Piping Note

(9)

(Pipe Hanging)

(5)

Valve

(10) ( SPEC.)


()
Check
()

Piping DWG.
Check

Schedule

Recheck

Check
(SECL)

Sign
()

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

3.4

1998.05.10

PAGE

11

OF

37


3.4.1
(1)

Isometric DG. Customer, Vendor, Sign


REV. NO. Issue Circle .

(2)

Isometric DWG.

Revision NO. .
2 REV.
3.4.2

Description
Description .
(1)

Approved for Construction :

1 .

(2)

Revised as per Mark

2 Mark

(2) Revision .
3.5

Job
Job .
(1)

Title Bock

(2)

(3)

(Size, Material)

(4)

(, Support Mark, Test Pressure, Stress Relief,


X-Ray Examination,Insulation, , )

(5)

(6)

, 3

3.4.1

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

4.

1998.05.10

PAGE

4.1

:
4.1.1

Isometric DWG. .


(1)

(mm), inch (B) .

(2)

None-Scale . , Balance .

4.1.2

4.1.3

3.0mm .

0.8mm


Nozzle

Value, Strainer

0.2mm

Item No.
, , Symbol
2

Match Line

Battery Line

0.2mm
0.2mm

4.1.4

: "A3" Size Standard Isometric .

4.1.5


(1)

:
1)

2)

Change List

3)

List of Isometric DWG.

4)

Isometric DWG.

(1)-(6) .

12

OF

37

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

(2)

Issue Circle Issue Block Revision Bock

PAGE

13

OF

37

ENGINEERING MANUAL

09
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

(3)

Isometric Drawing Title Block

Area Line ,2 3 DWG.


1/2, 2/2, 1/3, 2/3 .
1/2 1/3 .

PAGE

14

OF

37

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4)

PAGE

15

OF

37

Elevation Line .
Nozzle EL. Line EL.
.

(5)

Line Bill of Material


B/M Take-Off Coding .

(6) List of Isometric drawing

Sheet No.

Line No.

2051

AIS US 203

2051

AIS US 213

2052

AIS US 203

2052

AIS US 206

(2053)

AIS US 203

2054

AIS US 208

2055

AIS US 209

2055

AIS US 214

1)

Line No. DWG. Line Reference .

2)

One Sheet Line No. . Sheet Line NO. 3 List


.

3)

Sheet No.( ) DWG. Material Take-Off


Sheet Sheet.

4)

Line No. Class Designation ( ) Line Class


Class Line NO. .

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

5)

PAGE

Line NO. , Drain, Vent, Utility,

16

OF

37

Connection

Item No. Line No. .


LINE NO.
AIA DA 102
Class Designation
Item NO.

6)
4.2

Standard Form SECL .

Isometric Piping Drawing


(1)

1 Sheet Line .
1)

One Line One Sheet . 2) 3) .

2)

Line No. SPEC. Sheet


. Line No. Route Sheet
. , Sheet .

3)

SPEC. Change Line No. , Valve Flange High


Grade SPEC. Sheet , Main Line
, Sheet .

4)

1), 2), 3) Take-Off Procedure Batch


(Section) Sheet . Line Piping DWG. Match Line
DWG. Match Line Cuting Batch
.

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

(2)

PAGE

17

OF

37

1.1/2B .
1) Drain Vent . Hook-Up DWG.

PIPE
FLANGE
.

ISOME. DWG VALVE


FLANGE .

LINE HOOK UP DWG


.HOOK UP"
.

SIZE TYPE
.

SOCKET WELD VALVE

HALF COUPLING

BRANCH

3109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

2)

PAGE

18

OF

37

Instrument Hook-Up Drawing

3/4B Half Coupling Tag NO.


Valve Line

1/2B Half Coupling Tag NO.


Orifice
(Valve ) .

1B Half Coupling
Tag NO. .

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

3)

PAGE

19

OF

Hook-Up Drawing

1 Fitting
Tag NO. Size .

Drip Pot
3/4B Half
Coupling , Tag NO.
4 .

Steam Tracing Globe


Valve , Globe
Valve Frange
.

Hook-UP DWG. .
Valve NO. TS-101"
.

4)

(1.1/2B ) Line Route


2000mm .
2000mm Line Fitting Cutting .

37

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

PAGE

20

OF

37

2000mm
.

2l Reducer
.

Route

Isometric DWG. NO.

2000mm 1.1/2B
Line .

2000mm
Line NO.

1 Fitting

Globe Valve
.

(3)

CONT NO. .
1)

Match Line

ML. 0.2mm
Piping DWG. No. .

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

2)

PAGE

21

OF

37

Line Line

Tee

.

Line

Piping DWG.

Line NO. COUNT NO. .

Line NO. Line

3)

COUNT NO.

CONT.

(4)

1005

Sheet No.

Continue

Line
1)

Pipe Line Single Line .

2)

Line No. Elevation Piping DWG. .

3)

(90) 3 .

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4)

PAGE

22

OF

Reducer

Concentric Size .
Eccentric ECC. Size
Flat .
5)

Piping DWG.

6)

( .)

7)

Piping DWG. .

8)

9)

"H-103" .

10) Elevation EL. BOP EL. .


11) Valve Control Valve Special Valve .
12) Special Piping Parts

4.5 Symbol 1

.
(5)

Nozzle Double.Line
. , 'Item
No., Nozzle No. Elevation

37

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

4.3

1998.05.10

PAGE

23

OF

37

Isometric DWG. for Piping Fabrication


(1)

1 Sheet Line .
1)

One Line One Sheet . , 2) 3) .

2)

Line NO. SPEC. Sheet


. Line Route Sheet
. Sheet .

3)

1 Sheet Line Prefabrication Spool Piece


Cutting .

4)

SPEC. Change Line NO. , Valve Flange High


Grade SPEC. Sheet Main Line
, Sheet .

5)

1), 2), 3) Fabrication

Take-Off

Batch (Section ) Sheet .


, Line Piping DWG. Match Line DWG. Match
Line Cutting Batch .
(2)

1.1/2B .
1)

Drain Vent .
1 Fitting Size Type

Valve Flange .
Couping Size
Take-Off .

Size Type
.

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

2)

PAGE

24

OF

37

Instrument Hook-Up Drawing

3/4B Half Coupling, Tag NO.


:Valve Line .

1/2B Half Coupling, Tag NO.


orifice
(Valve ) .

1B Half Coupling
Tag NO. .

3)

Hook-Up Drawing
Sampling
1 Fitting ,
Tag NO. Size .

Steam trap
Drip Pot
3/4B Half Coupling
. Tag NO.
4 .

Steam Tracing
Steam Tracing Globe Valve

. Glove Valve Flange


Hook-Up DWG. .

ENGINEERING MANUAL

09
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4)

PAGE

25

OF

(1.1/2B ) Line Cutting


. Tee Reducer .

Field Weld

Reducer 2 x 1 .

Isometric DWG. NO. .

Flange
.

.

Line
No. .
Coupling
. Globe Valve Flange

(3)

37

CONT NO. .
1) Match Line

ML. 0.2mm
Piping DWG. No. .

ENGINEERING MANUAL

09
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

2)

PAGE

26

OF

37

Line

Tee

Piping DWG.

Line
Line No. CONT. NO. .
3)

CONT NO.

CONT.

(4)

1005

Sheet No.

Continue

Line
1)

Pipe Line Single Line .

2)

Line NO. Elevation Piping DWG .


Line .

3)

(90") 3 .

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4)

PAGE

27

OF

37

Reducer

Concentric Size .
Eccentric ECC. Size
Flat .

5)


Piping DWG.

6)

. ( . )

7)

Prefabrication . Prefatrication One Spool


.

8)

9)

"H-103" Isometric DWG. One Piece


(Field Weld ) .

Field Weld Point Fitting


.

ENGINEERING MANUAL

09
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

PAGE

28

OF

37

10)

Elevation EL. BOP EL. .

11)

Valve Control Valve Valve Gasket


Valve Valve No. .
Gasket "H-103" .

Valve No. .

12) Special Piping Parts

4.5 Symbol
,
.

(5)

Nozzle Double Line ,


. Item No., Nozzle No.
Elevation .

(6)

Support Trunnion
Piping Prefabrication Elbow Trunnion . ,
Trunnion Location .

3109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

PAGE

29

OF

37

Line
"SEE DETAIL A" .

Detail .

Trunnion Detail "A"

(7)

Prefabrication Spool Piece


1)

Prefabrication Spool Piece "SEM-0648" .

2)

Field Weld Point "FW" .

.
Piece No. [3] (50100mm)
Cutting. Cutting Length (CL.1550) .

3)

Spool Piece NO, ( ) ~ .


Line . Sheet
Line Sheet . Spool Piece NO.
"SEM-0648- , Spool Piece NO. .
2051

1
Piece NO. ()
Sheet NO.

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4)

PAGE

30

OF

37

Line Prefabrication .

Line Hatching
.

.

Material .
Prefabrication Shop
. Job Start
. ( .)
(8)

Material Take-Off
Prefabrication DWG. Prefabrication .
.

Valve, Strainer Accessory

Blind Flange

Bolt/Nut

Gasket

Prefabrication

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

4.4

1998.05.10

PAGE

31

OF

37

Isometric DWG. for Piping Construction


4.3 Piping Fabrication
. 4.3 .
(1)

1.1/2B Drain Vent .


, Hook-Up DWG. .
Isometricment DWG. Valve
flange .
Pipe
Flange

Line Hook-up DWG.

.Hook-Up .

Half Coupling
Branch
,
.

(2)

Rack Column
Piping DWG. Isometric DWG. Line
Line Rack Column No. .

Column NO.

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

4.5

1998.05.10

PAGE

32

OF

37

Symbol
4.5.1

Isometric DWG. Symbol


(1)

"H-103" Piping Parts Standard Symbol .


Line Fitting, Joint Valve Symbol 4.5.3, 4.5.4, 4.5.5
.

(2)

"H-103" piping Parts 10

Special

Number . 9t .
Joint Symbol .
(3)

10 Tag NO. . . (
.)

4.5.2

General Symbol

Tag NO.
Special
Parts

Drawing
Symbol

Symbol

Remarks

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4.5.3

Fitting Symbol

PAGE

33

OF

37

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4.5.4

Valve Symbol

PAGE

34

OF

37

ENGINEERING MANUAL

109
REV.: 2

ISOMETRIC DWG.
DATE :

1998.05.10

4.5.3

Fitting Symbol

PAGE

33

OF

37

109

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

5.

1998.05.10

PAGE

36

OF

37

5,1

(1)

Isometric DWG. .
300 .
300 Section , 300
.

5.2


.
1)

Appendix ll

1/6

2)

Change List

Appendix ll

2/6

3)

List of Isometric drawing

Appendix ll

3/6

4)

Isometric drawing

Appendix ll

4/6, 5/6, 6/6

09

ENGINEERING MANUAL

REV.: 2

ISOMETRIC DWG.
DATE :

6.

1998.05.10

PAGE

37

OF

37

1982.11.30

, Manual Computer Isometric Drawing


,
.
-

:

1

1990.11.30

- 90
-

- Manual

1998.05.10

APPENDIX : Isometric Piping Drawing for 1.1/2B and Smaller piping

ISOMETRIC DRAWINGS
FOR
1.1/2" AND SMALLER PIPING

AREA NAME : UTILITY(ALL AREA)

FOR REFERENCE

APPENDIX
09
PAGE 1 of 5

APPENDIX : Isometric Piping Drawing for 1.1/2B and Smaller piping

LIST OF ISOMETRIC DRAWINGS

REPORT NO :
RUN DATE

JOB NO

: 7165

APPENDIX
109
PAGE 2 of 5

PAGE :

REV.

SQ.

DWG NO.

LINE NO

A1A OD1

A1A OD2

B1A OD2

A1A OD7

A1A OD5

REMARKS

APPENDIX : Isometric Piping Drawing for 1.1/2B and Smaller piping

LINE BILL OF MATERIAL

APPENDIX
109
PAGE 3 of 5

APPENDIX : Isometric Piping Drawing for 1.1/2B and Smaller piping

LINE BILL OF MATERIAL

APPENDIX
09
PAGE 4 of 5

APPENDIX : Isometric Piping Drawing for 1.1/2B and Smaller piping

LINE BILL OF MATERIAL

APPENDIX
09
PAGE 5 of 5

APPENDIX : Isometric Piping Drawings

FOR REFERENCE

PIPING ISOMETRIC DRAWINGS

AREA : 308 AREA

APPENDIX
09
PAGE 1 of 5

APPENDIX : Isometric Piping Drawings

APPENDIX
09
PAGE 2 of 5

LIST OF ISOMETRIC DRAWINGS

REPORT NO :
RUN DATE

JOB NO

: 7165

PAGE :

REV.

SQ.

A1S US203

A1S US203

B1A US203

4
5

DWG NO.

LINE NO

REMARKS

APPENDIX : Isometric Piping Drawings

APPENDIX
09
PAGE 3 of 5

APPENDIX : Isometric Piping Drawings

APPENDIX
09
PAGE 4 of 5

APPENDIX : Isometric Piping Drawings

APPENDIX
09
PAGE 5 of 5

APPENDIX : Isometric Drawings for Piping Fabrication

ISOMETRIC DRAWINGS
FOR
PIPING FABRICATION

AREA : 308 AREA

APPENDIX
09
PAGE 1 of 5

APPENDIX : Isometric Drawings for Piping Fabrication

LIST OF ISOMETRIC DRAWINGS

REPORT NO :
RUN DATE

JOB NO

: 7165

APPENDIX
09
PAGE 2 of 5

PAGE :

REV.

SQ.

A1S US203

A1S US203

B1A US203

4
5

DWG NO.

LINE NO

REMARKS

APPENDIX : Isometric Drawings for Piping Fabrication

APPENDIX
09
PAGE 3 of 5

APPENDIX : Isometric Drawings for Piping Fabrication

APPENDIX
09
PAGE 4 of 5

APPENDIX : Isometric Drawings for Piping Fabrication

APPENDIX
109
PAGE 5 of 5

APPENDIX : Isometric Drawings for Piping Construction

ISOMETRIC DRAWINGS
FOR
PIPING CONSTRUCTION
AREA NAME : ORE HOPPER
(DWG NO : EK7270-306A/B/C)

APPENDIX
09
PAGE 1 of 5

APPENDIX : Isometric Drawings for Piping Construction

LIST OF ISOMETRIC DRAWINGS

REPORT NO :
RUN DATE

JOB NO

: 7165

APPENDIX
09
PAGE 2 of 5

PAGE :

REV.

SQ.

A1S US203

A1S US203

B1A US203

4
5

DWG NO.

LINE NO

REMARKS

APPENDIX : Isometric Drawings for Piping Construction

APPENDIX
9
PAGE 3 of 5

APPENDIX : Isometric Drawings for Piping Construction

APPENDIX
09
PAGE 4 of 5

APPENDIX : Isometric Drawings for Piping Construction

APPENDIX
09
PAGE 5 of 5