You are on page 1of 1

Date: 14/1/2016

APPLICATION FORM
Ship No.
Owner:

1171
San Miguel Corp.
S.L.

Ships Name:
Supervisor:

JPL

Hull

Mach

TIME:
9:30

INSPECTION ITEMS:
1. AP-1 (S) BLOCK Inspection
2. BT-2 (C) Surface Preparation

10:00

OWNERS COMMENTS / REQUIREMENTS


No.
1

2.

Requirement(s) / Comment(s)
AP-1 (S) -> Weld slot to be provided
on frame seam line connection
(During Erection stage)
AP-1 (S) -> Sharp edges to be
removed by grinding before surface
preparation stage
BT-2 (C)-> tanks to be cleaned before
coating
BT-2 (C)-> Sharp edges to be removed

In Charge
Mr.
Suenaga

Shipyards Reply

Electric

You might also like