Data to be entered Main carriage way

LHS RHS
Total Length 18.180 18.180
Handed over stretch 13.000 12.000
Clearing & Grubbing 12.000 11.000
Embankment 11.740 10.940
S.G 11.740 10.940
GSB 11.600 10.900
WMM 11.585 10.750
DBM 10.060 10.230 Note :
BC 6.500 7.105
Kerb 9.135 9.135

Main carriage way-LHS


Kerb 9.1
BC 6.5
DBM 10.1
WMM 11.6
GSB 11.6
S.G 11.7
Embankment 11.7
Clearing & Grubbing 12.0
Handed over stretch 13.0
Total Length 18.2
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0

Service Road -BRTS


Drain & Duct Walls 10.1
Drain & Duct Raft 10.1
Drain & Duct PCC 10.1
Kerb 9.1
SDBC 8.1
DBM 10.5
WMM 10.5
GSB 10.5
S.G 10.5
Embankment 10.5
Handed over stretch 12.0
Total Length 18.2
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
GSB 10.5
S.G 10.5
Embankment 10.5
Handed over stretch 12.0
Total Length 18.2
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
BRTS

Total Length 18.18


Handed over stretch 12.00
Embankment 10.54
S.G 10.54
GSB 10.54
WMM 10.54
DBM 10.54
1 Culvert = 0.44 m SDBC 8.14
1 Bridge = 3.03 m Kerb 9.135
Drain & Duct PCC 10.054
Drain & Duct Raft 10.093
Drain & Duct Walls 10.070

Main carriage way-RHS


Kerb 9.1
BC 7.1
DBM 10.2
WMM 10.8
GSB 10.9
S.G 10.9
Embankment 10.9
Clearing & Grubbing 11.0
Handed over stretch 12.0
18.2 Total Length 18.2
16.0 18.0 20.0 0.0 2.0 4.0 6.0 8.0 10.012.014.016.018.020.0

18.2
16.0 18.0 20.0
18.2
16.0 18.0 20.0