MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : PLANT ITEM : OBSERVATION AND ACCESS DOORS REF : M/ 9/3 SHEET 1 OF 2 1 X 500

MW UNIT :7

LOCATION:

PLANT NOMENCLATURE: _________________________________________________ MANUFACTURER ___________________ SRL. NO. __________________________ NO. ACTIVITY STATUS (YES/NO) REMARKS

1.

General conditions satisfy site standing instructions as listed in the Plant Commissioning Essential Prerequisites (SCL MS 1/1) The installation is complete and correct in accordance with latest approved drawing. Access for adjustments, maintenance and repairs are satisfactory. Check the door for proper hinging. Check the door for inside refractory lining (where applicable). Check the operation of the door by closing and opening. Check the door for tight & proper closure.

2.

3.

4. 5.

6. 7.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : PLANT ITEM : OBSERVATION AND ACCESS DOORS REF : M /9/3 NO . SHEET 2 OF 2 STATUS REMARKS (YES/NO) 1 X 500 MW UNIT :7

LOCATION:

ACTIVITY

8. 9.

Check that the Gasket has been placed properly. Check that all the bolts are properly lightened or clamped (As applicable).

10. If it is water cooled check the water connections. (where applicable).

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.