You are on page 1of 4

Saudi Aramco 2616-ENG (3/99)

OPERNS.

SAUDI ARAMCO OIL COMPANY


SECTION 01051 SURVEYING
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

SUBSECTION INDEX Part 1 - General

DESCRIPTION

1.01 1.02 1.03 1.04 1.05 1.06

Description Related Work Reference Standards Contractor Responsibility Accuracy and Quality Assurance Submittals

DATE JOB/EWO

Part 2 - Products 2.01 Stakes

REV. NO.

Part 3 - Execution 3.01 Surveying Work

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PART 1 - GENERAL 1.01 A. Description Work in this Section includes, but is not limited to; furnishing survey crew, setting up reference points and bench marks, vertical and horizontal setting out of all buildings, foundations, fences, grading, trench work, utility installations, roadways, asphalt paving, walkways and other works forming part of the Contract. Work is to be performed in accordance with the conditions set forth in subsection 1.03 of Section 02000 General Instructions. Related Work Section 02000 - General Instructions Section 02210 - Excavation, Trenching, Backfilling and Compacting Section 02513 - Base Course and Asphalt Concrete Paving Section 03100 - Concrete Formwork Section 03300 - Cast-In-Place Concrete
Section 01051

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

B.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

1.02 A. B.
Date:

C. D. E.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

15-Sep-07

JOB/EWO#

1 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

1.03 Reference Standards A. Saudi Aramco Engineering Standards (SAES). 1. 1.04 SAES-A-100 - Survey Coordinates and Datums.

ENGG

CERT

Contractor Responsibility Contractor responsibility includes, but is not limited to: 1. Performing all surveys for the duration of the Contract to ensure that levels and locations conform to the design Drawings, and shop/working drawings approved by Saudi Aramco Representative. Making formal requests to Saudi Aramco for data on survey control points related to the project prior to construction. Verifying the figures on all Saudi Aramco furnished data and documents before laying out the Work. Contractor shall be responsible for any errors or inaccuracies resulting from his failure to do so. Informing Saudi Aramco Representative if the validity of any survey monument is threatened, and take the necessary steps as outlined in this Specification. Obtaining approval of Saudi Aramco Representative if any survey control points will be disturbed or destroyed by construction activities. Maintaining all Saudi Aramco established reference points and bench marks at all times during construction. Under the direction of Saudi Aramco Representative, replace any survey monuments damaged or disturbed by construction activity. Preparing accurate as-built survey and submission of drawings. 8. Contractor shall submit a survey report after each completed (compacted) layer to Saudi Aramco representative for verifying the correct elevation. No work shall proceed for the next phase prior to approval of the completed work. 9. Contractor shall contact Saudi Aramco Survey Group through SAPMT to verify the exact punch mark prior to start of any backfilling.

DESCRIPTION

A.

2.
DATE JOB/EWO

3.

REV. NO.

4.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

5.

PROJECT ENGINEER
____________ DATE

6.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

7.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

1.05 A.

Accuracy and Quality Assurance Contractor is to establish all horizontal and vertical reference points, and monuments accurately within a maximum tolerance of 5 mm vertically and 10 mm
Section 01051

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

15-Sep-07

JOB/EWO#

2 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


horizontally. Subsequent checking or lack of checking by Saudi Aramco does not relieve Contractor from his responsibility for the correctness of the construction.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CERT

PMT

DESCRIPTION

ENGG

B.

Contractor will be provided with survey controls (refer to benchmark data shown on the drawings). These control points shall be tied from any of Saudi Aramco survey controls and closed to another Saudi Aramco survey control. All survey field notes must be kept in field at all times for inspection by Saudi Aramco Representative. Submittals Submit to Saudi Aramco Representative all data and grade sheets at least 48 hours prior to construction. Show on the grade sheets the vertical and horizontal relationships between the stakes and the design reference points shown on the Drawings.

1.06 A.

DATE JOB/EWO

PART 2 - PRODUCTS 2.01 A. Stakes Construction Stakes: Construction stakes shall be 14 mm steel rebar. Wood or PVC stakes may be used as directed by Saudi Aramco Representative. Machine Control Stakes: Machine control stakes shall conform to manufacturer's specifications.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

B.

PROJECT ENGINEER
____________ DATE

PART 3 - EXECUTION 3.01 Surveying Work A. Contractor Survey Controls: From Saudi Aramco provided survey controls (refer to bench mark data shown on the Drawings), Contractor shall establish additional survey controls with an accuracy as stipulated in this Specification. Survey Monuments: If the validity of any survey monument is threatened, place at least three (3) reference or witness markers for each point likely to be disturbed. Submit survey notes listing the relative positions of the reference markers to each other, and to the points they are referencing at least 48 hours prior to disturbing or threatening the validity of the monument. Road Works: 1. General: Prior to the start of grading, and during the progress of the Work, set and maintain sufficient stakes to show conformance with the Drawings. Locate all stakes in such a way that they will not be disturbed by construction operations.
Section 01051

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

B.

Date:

C.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

15-Sep-07

JOB/EWO#

3 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


2. Stake Placement: Construction stakes shall be placed at the left and right of center lines, at shoulders, edge of paving, grade breaks, beginning and ending of curves, angle points and intersections of flow lines. Stake Spacings: Item Curve Subgrade Straight Grade 30 m 20 m 10 m Vertical 10 m 10 m 5m
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

3.

DESCRIPTION

Base Asphalt Paving, auto equipment controlled by string-line D. Utility Work: 1.

DATE JOB/EWO

General: Prior to beginning trenching operations, and during the progress of the Work, set and maintain sufficient stakes to show conformance with the Drawings. Locate all stakes in such a way that they will not be disturbed by construction operations. Stake Placement: Construction stakes are to be place at, but not limited to, the following locations; a. Utility Pipes: Stakes shall be placed at each wye or tee connection, cleanout and manholes and at every 10 meter station.

REV. NO.

2.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

E.

CERTIFIED _ __________
DATE: ________

Park Work: Prior to beginning of grading, and during the progress of the Work, set and maintain sufficient stakes to show conformance with the Drawings. Locate all stakes in such a way that they will not be damaged or disturbed by construction operations. Contractor shall protect the stakes in areas where they are likely to be disturbed or displaced.

F.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

- END OF SECTION -

Date:

Section 01051

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC K55 A

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

15-Sep-07

JOB/EWO#

4 OF 4

00