1! Bulldozer (D8) a.) Clearing 500 sq.m./hr. b.) Stripping 00 sq.m./hr !.) "#!a$ation 1.) Common Soil %5 !u.m/hr. .) Slightl& hard 'aterials 5 !u.m./hr. d.) (uarr&ing 10) Common 'aterials 50 !u.m./hr. 108 *ggregates %0 !u.m./hr. Boulders 15 !u.m./hr. 00 +eeds S!reening e.) ,ushing - !u.m./hr. . .oad /rader a.) Sub grading -00 !u.m./hr. b.) Spreading 50 !u.m./hr. -. ,a&loader 0oading -0 !u.m./hr. %. Crane Sho$el 0oading -5 !u.m./hr. 5. Sheep 1oot .oller a.) Stati! .olling 15 !u.m./hr. (1 passes 2 15 !m. li3t) b.) 4ibrator& .olling 1-5 !u.m./hr. (5 passes 2 0 !m. li3t) 5. - 2 6heel .oad .oller a.) Stati! .olling % !u.m./hr. (5 passes 2 0 !m. li3t) ). 7ra!tor Dra8n .oller a.) 4ibrator& .olling % !u.m./hr. (5 passes 2 0 !m. li3t) 8. 7andem .oller a.) Stati! .olling % !u.m./hr. (5 passes 2 0 !m. li3t) b.) 4ibrator& .olling ) !u.m./hr. (5 passes 2 50 !m. li3t) 9.) 5 2 7 Dump 7ru!: a.) ;auling Common Borro8 -.5 !u.m./hr. Base Course b.) ;auling Sele!ted Borro8 5.0 !u.m./hr. !.) ;auling Con!rete Bat!h Bat!h/trip <Class *= 10. > 7 2 Dump 7ru!: a.) ;auling Common Borro8 .5 !u.m./trip Base Course b.) ;auling Sele!ted Borro8 %.0 !u.m./trip Base Con!rete Bat!h 1.0 Bat!h/trip < Class * < 11. Bugg& a.) ;auling Con!rete 'i# 0.1) !u.m./trip 1. 6heel Borro8 a.) ;auling *ggregates 0.1) !u.m./trip b.) ;auling Con!rete 'i# 0.05 !u.m./trip 1-. 6ater 7ru!: a.) 6atering 1000 sq.m./trip 1%. Con!rete 'i#er a.) 'i#ing Con!rete 9 !u.m./hr. 15. .o!: Crusher a.) Crushing 'i# sand ? /ra$el -0 !u.m./hr. 15. Con!rete 4ibrator a.) 4ibrating Con!rete 'i# %0 !u.m./hr. 1). Con!rete 1loor 1inisher a.) 1inishing Con!rete 1loor 1%0 !u.m./hr. 18. ,er!ussion Drilling a.) Drilling ;ard .o!: 0.- m./hr. b.) Drilling 0oose .o!: 0.-0 m./hr. !.) Drilling 0ime Stone 0.-8 m./hr. d.) Drilling Sti!:& Cla& 0.%9 m./hr. e.) Drilling 0oose Cla& 0.)0 m./hr. TAS" #ATES $%# LAB%#&BASE' P#%(ECTS @. 1or @tem 100 2 Clearing and /rubbing A)tivity* Pro+u)tivity 1.) Bush Clearing sq.m./manAda& Bush 7&pe a.) 0ight Bush 00 b.) 'edium Bush 100 !.) Dense Bush 50 .) 7ree and Stump .emo$al Bne (1) manAda& per !m. o3 trun: diameter at Base o3 tree -.) /rubbing 4egetation 7&pe a.) Dense $egetation in 3irm soil !o$ering 80 the 8hole area b.) Spa!ed $egetation in loose soil 50 @@. 1or @tem 105 2 "#!a$ation 3or .oad8a& ? Drainage A)tivity Pro+u)tivity 1.) "#!a$ation Cu.m./manAda& (thro8ing distan!e in m.) Soil 7&pe 0 2 % m. % 2 5 m. 5 2 8 m. a.) 0ooseC rot sti!:& soil 5.0 A 5.0 %.5 2 5.5 -.5 2 %.5 b.) 1irm Soil -.5 2 %.5 -.% 2 %.0 .5 2 -.5 !.) 4er& hared soilC hard soil mi#ed .0 2 -.0 1.8 2 .5 1.) 2 .5 8ith stones .) 0oading Cu.m./manAda& 7&pe o3 Soil a.) 0oose %.5 2 5.5 b.) 1irm .5 2 %.0 !.) ;ard 1.5 2 .5 "#!a$ation !ombined 8ith loading o3 soil !an be e33e!ti$el& !arried out b& laborers up to a loading height o3 about 1.00 e.g. into 8heel borro8 or head bas:ets. *bo$e that heightC it is pre3erable to ha$e a separate group o3 leaders 8hose output must be mat!hed 8ith that o3 the e#!a$ators. Ne)eary output for t,e Loa+ing A)tivity Soil 7&pe 0oading ;eight ,rodu!ti$it& !u.m./manAda& a.) 0oose 0.1 m. 1 2 15 b.) 0oose 1 2 m. ) 2 10 !.) 0oose B$er m. % 2 5 @@@. 1or @tem 105 2 "#!a$ation 3or Stru!tures *!ti$it& ,rodu!ti$it& 1.) "#!a$ation Depending on the t&pe o3 soil 7here use similar produ!ti$it& Data as those used 3or "#!a$ation @n @tem 105 @4. 1or @tem 110 2 1oundation 1ill *!ti$it& ,rodu!ti$it& 1.) Ba!:3illing and 7amping - !u.m./manAda& 4. 1or @tem 108 2 *ggregate Sub 2 Base Course *!ti$it& ,rodu!ti$it& 1.) (uarr&ing ("#!a$ation ? /ra$el) 0.50 2 .0 !u.m./manAda& .) 0oading ) 2 10 !u.m./manAda& -.) Spreading 8 2 1 !u.m./manAda& %.) Compa!ting 8 2 1 !u.m./manAda& 5.) ;auling a!ti$it& should be !onsidered in this itemC hen!eC hauling distan!e has an important bearing on the !ost o3 the gra$elling operationC the ma#imum a!!eptable. ;auling distan!e has to be !onsidered 3rom !ase to !ase.
4@ 1or @tem 00 A *ggregate Base Course *!ti$it& ,rodu!ti$it& 1.) (uarr&ing 0.50 2 .0 !u.m./manAda& .) 0oading ) 2 10 !u.m./manAda& -.) Spreading 8 2 1 !u.m./manAda& %.) Compa!ting 8 2 1 !u.m./manAda& 5.) ;auling 2 please re3er to a!ti$it& no. 5 o3 @tem 108 5.) S!reeping - 2 5 4@@. 1or @tem %1- 2 .ein3or!ed Con!rete ,ipe Cul$ert *!ti$it& ,rodu!ti$it& 1.) Crushing o3 stone 3or aggregate 0.0 !u.m./manAda& .) Casting o3 !ul$ert rings manAda&s/ring -.) 0a&ing o3 standard !ul$ert (% in. diameter) .e3er !ul$ert la&ing data belo8 Br 0.50 m. dia.C length 5.00 m.C "#!a$ationC !ul$ert bad and Ba!:3ill %.) Building o3 head8alls 8ith masonr& blo!:s 10 manAda&s/ head 8alls @3 the length o3 the !ul$ert e#!eeds 5 metersC the number o3 manAda&s has to be in!reased a!!ordingl&. Cul$ert la&ing 2 this tas: !onsist o3 the e#!a$ation o3 the tren!h preparing the bedC la&ing o !ul$ertC ba!:3illing and !ompa!tion. +umber o3 manAda&s required $aries 8ith the $olume o3 the e#!a$ation and the soil t&pe. $ACT%#S T% BE MULTIPLIE' T% 'ETE#MINE T-E #EQUI#E' QUANTIT. %$ EAC- MATE#IAL CB+C."7" (B*S"D) on the 88 pounds (lbs.) bag o3 !ement C0*SS D*E CB+C."7" (-000 psi) Cement 2 9.08 Bags/!u.m. o3 !on!rete F - A 5 G 8astage Sand 2 0.58 !u.m./!u.m. o3 !on!rete F 8 2 10G 8astage /ra$el 2 0.)) !u.m./!u.m. o3 !on!rete F 8 2 10 G 8astage C0*SS DBE CB+C."7" (500 psi) Cement 2 8.-8 bgs/!u.m. o3 !on!rete F - 2 5G 8astage Sand 2 0.%5 !u.m./!u.m. o3 !on!rete F 8 2 10G 8astage /ra$el 2 0.8 !u.m./!u.m. o3 !on!rete F 8 2 10G 8astage C0*SS DCE CB+C."7" (-500 psi) Cement 2 9.)) bags/!u.m. o3 !on!rete F - 2 5G 8astage Sand 2 0.5- !u.m./!u.m. o3 !on!rete F 8 2 10G 8astage /ra$el 2 0.)0 !u.m./!u.m. o3 !on!rete F 8 A10G 8astage C0*SS DDE CB+C."7" (%000 psi) Cement 2 11.1) bags/!u.m. o3 !on!rete F - 2 5G 8astage Sand 2 0.%% !u.m./!u.m. o3 !on!rete F 8 2 10G 8astage /ra$el 2 0.58 !u.m./!u.m. o3 !on!rete F 8 2 10G 8astage 1B. B.@D/" "S7@'*7" 0umber 3or 3alse 8or: A 50 bd.3oot/!u.m. o3 !on!rete +ails A :ilos/!u.m. o3 !on!rete 7ie 8ires A 1.1 :ilos/!u.m. o3 !on!rete ,ainting stru!tural steel A - galloons per ton A/E#A0E $UEL C%NSUMPTI%N PE#'A. 1H"0 "+/@+" /"*. /."*S" B@0I10 B@0 B@0 CraneC 1%0 liters(diesel) % liters 1 liter lbs. 2 Diesel ;ammerC 0 liters A A A 1 liter BulldozerC 00 liters (Diesel) - liters 1 liter 1 lb. 1 liter ,a&loaderC 100 liters (Diesel) - liters 1 liter 1 lb. 1 liter /raderC 10 liters (Diesel) - liters 1 liter 1 lb. 1 liter .ollerC 50 liters (Diesel) liters 1 liter/8:. lbs./8:. 1 liter Dump 7ru!:C 50 liters (Diesel) 1 liter liters/8:. 1 lb. 1 liter 'i#er (1Abagger)C %0 liters (gas.) A A 0.5 lb. 2 4ibratorC 15 liters (gasoline) A A A A Bne Bagger 'i#er 2 100 bags/da& Crane 2 minimum o3 piles/da& (15 m. length in!luding spotting) /%LUME %$ T#ENC- CU!M! Soil 7&pe ) ) 2 8 10 A1- @n these !asesC the 8or: split o$er t8o or more da&s. 1irst the tren!h should be e#!a$ated and then the preparation o3 the bedC the la&ingC ba!:3illing and !ompa!tion is done. 7here3ore the $olume o3 the e#!a$ation to be limited 3ollo8ing rates and then appli!ableJ Soil 7&pe ,rodu!ti$it& a.) ;ard Soil -.50 !u.m./manAda& b.) 4er& hardC ston& .00 !u.m./manAda& *3ter !ompletion o3 the tren!h appro#imatel& % man 2 da&s are needed to la& 5 ringsC ba!:3ill and !ompa!t to 3inish road le$el. I! MEC-ANI1E' ASPECT *. C0"*.@+/ *+D /.HBB@+/ Dozer ,rodu!tion ;orse ,o8er Dense o3 4egetation (+o. o3 7rees/;e!tare) 0 2 50 51 2 100 101 2 00 01 2 50 50 abo$e 10 -50 50 190 150 1-0 1%0 %0 90 0 185 150 150 %80 --0 55 10 1)0 180 5%0 -)5 85 %0 195 00 500 %0 -10 55 15 B. "KC*4*7@B+ (Common 'aterials) B.1 Crane 7onnage Capa!it& (!u.m./hr.) Ban: 4olume Canal Stru!ture Cree: 15 15 10 10 0 0 15 15 5 5 0 0 -0 -0 5 5 B. Dozer Dozer ,rodu!tion (!u.m./hr.) Ban: 4olume ;orse ,o8er Canal Stru!ture 10 -0 15 1%0 -5 0 150 %0 5 180 %5 -0 00 50 -5 B.- Ba!:hoe Bu!:et (!u.m.) ,rodu!tion (!u.m./hr.) Ban: 4olume Canal Stru!ture Cree: 0.50 0 15 15 0.)5 -0 0 0 1.00 %0 -0 -0 1.5 50 %0 %0 1.50 50 %5 %5 C. (H*..L@+/ Dozer ,rodu!tion (!u.m./hr.) Ban: 4olume ;orse ,o8er Common *ggregate Cobbles/Boulders 1%0 55 50 ) 150 50 55 9 180 55 )0 -1 00 )0 )5 -- M. *4".*/" S,""D B1 DH', 7.HCN 7&pe o3 .oad Nilometer per hour 6ith 0oad 6ithout 0oad Con!rete/*sphalt .oad -5 %5 /ood 'aintained /ra$el .oad -0 -5 ,oorl& 'aintained /ra$el .oad 0 5 N. D"'B0@7@B+ B1 CB+C."7" 150 C1+ Compressor ? t8o () Ma!: ;ammer Capa!it& 2 8.00 !u.m./da& 3or massi$e !on!rete 1.00 !u.m./da& 3or slab ? 8all 0. D.@4@+/ B1 ,@0"S Steel ,ipesJ Crane 5 tons 8ith 2 tons drop hammerC Capa!it& O 8 0.'./;r. Con!rete ,ilesJ Crane 5 tons 8ith 500 :gs. ,ile ;ammerC Capa!it& O .00 0.'. 0.'. per hourC %.00 0.'.per hourC 3or thi!: and thin !on!rete piles MANUAL ASPECT *. "#!a$ationJ *.1 Common 'aterials Capa!it& (!u.m./da&)Ban: 4olume ? Depth o3 "#!a$ation 7&pe o3 6or: (meter) 1arm Dit!hs -.00 .50 .00 Canal .50 .00 1.)5 Stru!ture .00 1.)5 1.50 *. Slight ;ard 'aterials (@nd.) 7&pe o3 6or: Capa!it& (!u.m./manAda&) Ban: 4olume Canal 1.00 Stru!ture 0.)5 B. 0B*D@+/ C*,*B@0@7@"S B1 1@4" (5) 0*BB.".S Sand ? Common Cobbles Boulders Cement ..S. Bars 0umber ,l&8ood /ra$el Cu.m./hr !u.m./hr. !u.m./hr. !u.m./hr. bags/hr :gs/hr. bd.3t./hr. p!s./hr. % 5 -.5 - - 5C000 %C000 .5 C. H+0B*D@+/ C*,*B@0@7@"S B1 1@4" (5) 0*BB.".S Sand ? Common Cobbles Boulders Cement ..S. Bars 0umber ,l&8ood /ra$el Cu.m./hr !u.m./hr. !u.m./hr. !u.m./hr. bags/hr :gs/hr. bd.3t./hr. p!s./hr. 5 5 5 % -00 )C000 %C000 .5 D. CH7C B"+D ? ,0*C" .SB Stru!ture 1 Steelman ? 1 ;elper 8ith bar !utter Canal ? others 80 :gs./da& ". (H*..L@+/ Capabilit& !u.m./manAda& Sand ? /ra$el Cobbles Boulders -.50 .50 .00 1. D"'B0@7@B+ B1 CB+C."7" Slab and 6all 0.50 !u.m./manAda& 'assi$e Con!rete 0.0 !u.m./manAda& /. SC.""+@+/ B1 *//."/*7"S /ra$el %.00 !u.m./manAda& Sand 5.00 !u.m./manAda& ;. '*+H*0 B*CN1@00 Capa!it& J -.00 !u.m./manAda& @. 0*L@+/ B1 '*7".@*0S (!u.m./manAda&) Cobbles A .00 Boulders A 1.50 M. S,."*D@+/ B1 *//."/*7" Capa!it& A .50 !u.m./manAda& N. .HBB0" '*SB+.L (Con!reting) Cre8J 1 2 1oremanC 2 'asonC 10 2 0aborersC 1 2 0ight "quip. Bper. Capa!it&J 5.00 !u.m./da& 0. /.BH7"D .@,.*, Cre8J 1 2 1oremanC 2 'asonC 10 2 0aborersC 1 2 0ight "quip. Bper. Capa!it&J ).50 !u.m./da& '. CB+C."7" ;*00B6 B0BCNJ Setting Capa!it& sq.m./da& Cre8J 1 2 'asonC A 0aborers 1en!e Building %E C;B 1% 10 5E C;B 10 8 +. CB+C."7" 0@+@+/ Cre8J 1 2 1oremanC 2 'asonC 1 2 0ight "quipt. Bper. 10 2 0aborers 8ith one bagger mi#er Capa!it&J %.50 !u.m./da& B. @+S7*00*7@B+ B1 S7""0 /*7"S Cre8J 1 2 'ason ? 5 2 0aborers 15 K 15 to % K % ass&/da& *bo$e % K % 1 ass&/da& ,. CB+C."7" 6B.NS ,.1 1abri!ationC ,la!ing ? Dismantling o3 1orms Cre8J 2 CarpentersC % 2 0aborersC Capa!it&J -.50 !u.m./da& 3or -000psi Cre8J 1 2 CarpenterC 1 2 0aborerC Capa!it&J %.50 !u.m./da& !anal lining ,. Con!reting and Curing Capabilit& ,..a. 6ith !on!rete mi#er Cre8J 1 2 1oremanC 2 masonC 1 2 0.". BperatorC 8 2 0aborers Class D*E J -.50 !u.m./da& Class DBE J -.)0 !u.m./da& Class DCE J -.50 !u.m./da& 0ean Con!rete J %.50 !u.m./da& (. ,0*S7".@+/ B1 C;B 6*00 Cre8J 2 'asonsC 2 0aborers Capabilit&J 1 sq.m./da& (Bne side onl&) .. ."@+1B.C"D CB+C."7" ,@,"S Cre8 Capabilit& Diameter @n!h Cm. 1abri!ation @nstallation 1 2 1oreman 1 -0 15 15 1 2 'ason 18 %5 11 11 1 2 Carpenter/Steelman % 51 9 1 1 2 0aborers 8ith -0 )5 5 10 1 2 Bagger 'i#er -5 91 5 8 %8 1 - 5 % % ) +B7"J 7@'" B1 '@K@+/ O B*/S B1 C"'"+7/D*L K 10 '@+./B*/ 50 '@+H7"S/;BH. @@@. '*7".@*0 *S,"C7 Class Strength 'a#. *ggre. Cement Sand /ra$el Boulder SizeC in!h. Bags/!u.m !u.m./!u.m. *. Con!rete a. 11 :gs. 1.50 9.00 0.%5 0.90 A b. 00 :gs. .00 ).00 0.50 1.00 A Canal 0ining 00 :gs 1.00 ).50 0.%8 0.95 A B. .ubble 'asonr& 8/ 11 :gs. A %.50 0.5 0.%5 0.)5 C. /routed .iprap A %.0 0.-5 0.05 1.00 ,lain .iprap A A A 0.10 1.00 D. 0ean Con!rete A 5.00 0.50 1.00 A 1000 psi ". /ra$el Blan:et A A A 1.00 A 1. 1ilter Drain A A A A A B7;". '*7".@*0S Class 7&pe o3 Strength 1. 0umber 1/E,l&8d. 7ie 6ire +ails Stru!ture Ngs. bd.3t./!u.m. p!s./!u.m. :gs/!u.m :gs/!u.m * Bridge/1lume 11 %0 1.00 1.5G.SB .50 * Siphon/Bo# Cul 11 5 1.5 1.0G.SB .00 * Bther Stru!.Pin! 11 5 1.5 1.10G.SB .00 * 11 5 0.10 A 0.50 B 00 5 A A 0.5 * 11 15 0.%0 1.00G.SB 1.50 B 00 5 0.10 1.00G.SB 0.50 * 11 5 A A 0.5 ."@+1B.C" CB+C."7" ,@,"S Diameter 1abri!ation 'aterials per pie!e Cement Sand Gravel G.I. F. Lumber Tie Wire CW Nails Sheet @n!hes Bag Cu.m. Cu.m. ,!. Bd.3t. Ngs. Ngs. 1 0.58 0.0 0.05 0.1 0.-% 9.8 0.10 18 1. 0.05 0.10 0.19 0.-5 ).) 0.0 % 1.8 0.08 0.15 0.% 0.%8 9.)5 0.-0 -0 .55 0.11 0.1 0.-0 0.50 -. 0.%0 -5 -.-- 0.1% 0.8 0.-% 0.) 50.%- 0.50 % %.5 0.18 0.-5 0.%0 0.8% 50.8% 0.50 @+S7*00*7@B+ B1 ..C. ,@,"S Diameter Cement Sand Gravel R.S.B. F. Lumber Tie Wire CW Nails @n!hes Bag Cu.m. Cu.m. Ngs. Bd.3t. Ngs. Ngs. 1 0.1 0.01 0.0 A .00 0.0 0.0 18 0.%5 0.0 0.0% -.55 .00 0.0 0.0 % 0.) 0.0- 0.05 %.5 -.00 0.-0 0.-0 -0 0.9- 0.0% 0.08 5.5 -.00 0.-0 0.-0 -5 1.11 0.05 0.10 5.01 %.00 0.%0 0.%0 % 1.- 0.05 0.1 5.)9 %.00 0.%0 0.%0 ,0*S7".@+/ C.;.B. B0BCN Size 'aterials per sq.m. 3or t8o () sides Sand Cement %E K 5E 0.0-% 0.%1 /.@. 0*L@+/ B1 C.;.B. Size Cement Sand Bags/sq.m. Cu.m./sq.m. %E 0.55 0.0%5 5E 1.0) 0.089 ACEL #ATE 2334 Bperated "quipment Des!ription .ate per Da& (,h,) Bulldozer NomatsuC D80*A1DD 180;p 9C150.00 ,a&loader )5 7C'CClar:C 1.5- !u.m. 10C010.00 Capa!it&C 151 ;p .oad /rader 'itsubishi '/ 500 1)0 ;p 8C808.00 Dump 7ru!: Mapan ? other 'a:eC 9C015.00 10 !u.m. Capa!it& .oad .oller @ngersoll .and S,%8 '@ 7ons 8C)01.00 Crane *ll modelsC 7ru!: mountedC 11C95.00 Standard me!hani!all& operated -1 2 -5 7ons Ba!:hoe Nomatsu ,C 10C Capa!it& 90 ;p 9C555.00 7ransit 'i#er Mapan 'a:e -.8 !u.m.C %5 !u.m 8C58.00 Capa!it& 1)5 ;p *ir Compressor /as/Diesel "ngineC C1' 0 ;p 1C-)5.00 ,late Compa!tor 1 ;p "ngine Dri$en 1C5%8.00 *sphalt ,a$er 6orthington -% (Basi! "quipment Bnl&) -C-0.00 *sphalt Distributor 0ittle 1ord Sprasmaster 5C)8%.00 Bare "quipment Des!ription .ate per Da& (,h,) ,ile ;ammer (8/o !rane) Domag D8 2 5C05).00 Drop ;ammer (8/o !rane) 78o 7ons 8/ ,ile ;ammer 100.00 Ma!: ;ammer Stanle&C h&drauli! 8/o po8er unit 9%.00 6elding 'a!hine /as/Diesel Dri$en 50 *mps.C 185 ;p -00.00 Con!rete 'i#er 1 2 Bagger 98.00 Con!rete 4ibrator /as/Diesel Dri$en -%1.00 Chainsa8 ;usquamaC 100 CD 8/o Blade 180.00 6ater 7ru!: *ll ma:esC 500 A 1000 gals. 1C))-.00 6ater ,ump *ll models -.5E 2 %E size 119.00 Con!rete Bat!h ,lant 6ith Cement Silo 'anual 5C11-.00 /mo. K rated !ap. @n Cu.m./hour LAB%# %UTPUT CAPABILITIES ."'B4*0 "K@S7@+/ S7.HC7H."J 0umpsumJ @nstallationsJ 7imberJ /irts and /irder 0.10 2 0.15 !u.m./manAda& 1loor Moist 150 0.' manAda&s 1looring Boards 15 2 18 sq.m./manAda&s ,ost 0.1% !u.m./manAda&s 6alling/SlidingJ Co$ering -0 sq.m./manAda&s 1ramingC Studs 1 !u.m./manAda&s ('ultipl& b& the no. o3 da&s Double 6alling) Ceiling Moist and ;angers 15 sq.m./manAda&s Ceiling Boards (%=K8= ,l&8ood) -0 sq.m./manAda&s 6indo8 sashesJ Mamb 1abri!ation % sq.m./manAda&s 1rames 1abri!ation sq.m./manAda&s Mambs @nstallation 1% sq.m./manAda&s 1rames @nstallation 10 sq.m./manAda&s DoorsJ Mambs 1abri!ation/@nstallation .5 sq.m./manAda&s Door 1abri!ation/@nstallation 1 panel/manAda&s ,aintingsJ ,aint .ollers 15 sq.m./manAda&s ,aint Brush 50 sq.m./manAda&s +eutralizer 100 sq.m./manAda&s 7russ 1abri!ationJ 0.5 truss/manAda&s ,urlins @nstallation 15 sq.m./manAda&s 1as!ia Board 0.05 !u.m./manAda& .oo3 Co$erings (/@ Sheets) -5 p!s./manAda&s Con!rete 6or:sJ Con!rete ,ouring 0.-0 p!s./manAda&s .ebars 0 2 -0 :gs./manAda&s 1inishing .ough 1inish 10 sq.m./manAda&s ,lain/1ine 1inish 8 sq.m./manAda&s C-B $illing5Laying A! Cement Mortar 7able 1. (uantit& o3 Cement and Sand 3or C;B 'ortar per square meter 8all Size o3 C;B +o. per sq.m. %0 Ng. 'i#ture Cement Bags * B C Sand %EK8EK15E 1.5 0.55 0.-9% 0.-8 0.0%-8 5EK8EK15E 1.5 1.01- 0.)59 0.5-- 0.08%% 8EK8EK15E 1.5 1.500 1.15 0.9-8 0.150 B! Mortar for Platering 7able . (uantit& o3 Cement and Sand 3or ,lastering per square meter %0 :g. Cement Bag 'i#ture Class 15 mm thi!: 0 mm thi!: 5 mm thi!: * 0.88 0.-50 0.%50 B 0.19 0.%0 0.-00 C 0.1%% 0.180 0.5 D 0.10 0.150 0.188 Sand 0.015 0.00 0.05 1. 1ind the area o3 the 8all (t8o 3a!es) *rea O -.00 K %.00 K 3a!es *rea O % sq.m. . .e3er to 7able under 15 mm thi!: plaster Class DBE mi#tureJ 'ultipl&J Cement O % K 0.19 O %.5 bags Sand O % K 0.015 O 0.-8% !u.m.
C! C-B $ooting 7able -. (uantit& o3 CementC Sand and /ra$el 3or C;B 1ooting per square meter 0ength Dimension Cement in Bags Class 'i#ture *ggregate Centimeters %0 :gs Cement Sand /ra$el 7hi!: 6idth * B !u.m. !u.m. 10 -0 0.)0 0.5 0.015 0.0-0 10 -5 0.-15 0.5- 0.018 0.0-5 10 %0 0.-50 0.-00 0.00 0.0%0 10 50 0.%50 0.-80 0.00 0.050 15 %0 0.5%0 0.%50 0.0-0 0.050 15 %5 0.508 0.505 0.0-% 0.058 15 50 0.5)5 0.55- 0.0-8 0.0)5 15 50 0.810 0.5)5 0.0%5 0.090 0 %0 0.)0 0.500 0.0%0 0.080 0 50 0.900 0.)50 0.050 0.100 0 50 1.080 0.900 0.050 0.10 1. Sol$e 3or the net length o3 the C;B 8all +et 0ength O %0 m 2 (0.5 K 11 post) O -).5 meters . .e3er to 7able - along the 15 K 50 !m 3ooting dimensions %0 :gs. !ement Class D*E 'i#tureQ 'ultipl&J Cement O -).5 K 0.5)5 O 5.1% sa& 5 bags Sand O -).5 K 0.0-8 O 1.% sa& 1.50 !u.m. /ra$el O -).5 K 0.0)5 O .8 sa& -.00 !u.m. MAINTENANCE B. C%NT#ACT 6MBC7 '"7;BDS B1 CB+S7.HC7@B+ 1. ,*7C;@+/ ,B7;B0"S 2 should be done to the areas spe!i3ied b& the !ontra!ts and plans dul& appro$ed b& the "ngineer 'aterials to be used must be suitable to a!quire best result 8hen !ompa!ted. SC;"DH0" B1 6B.NSJ 'B+7;0L . ."S;*,@+/ A should also be done to areas required in the plan and !ontra!ts. *ll 8or:s should !on3orm to 8hat 8ill be des!ribed in the spe!i3i!ation. SC;"DH0" B1 6B.NSJ (H*.7".0L -. 4"/"7*7@B+ CB+7.B0 *+D C0"*+@+/ D@7C;"S 2 *ll obRe!ts subRe!t 3or the obstru!tion o3 the designed areas should be remo$ed and !leared. SC;"DH0" B1 6B.NJ 76@C" * L"*. %. ."/.*4"00@+/ A *ll materials shall !onsist o3 hardC durable parti!les or 3ine di$ided mineral matter that !an be !ompa!ted rea!hing 3or stable subAbase. Hsing espe!iall& equipped $ehi!les materials should be distributed in a !ontinuous uni3orm la&er. 7he uni3orm thi!:ness o3 subAbase materials shall be adRusted prior to the !ompa!tion b& 8atering or b& dr&ing as required in order to obtain the required !ompa!tion. Compa!tion shall !ontinue until a 3ield densit& o3 at least 100 (G) per!ent o3 the ma#imum dr& densit&. SC;"DH0" B1 6B.NS 2 *++H*0*0 5. B0*D@+///.*D@+/ 2 *ll unstable materials should be remo$ed in areas subRe!t 3or blading/grading. 7hese areas should be brought to a grade required in the plan and !ontra!ts. Compa!tion 8ill 3ollo8 using hea$ier !ompa!ting units until required densit& !an be attained.