README

Disciplines
A J Mechanical PF Port Facilities
C Ash Handling K I&C R Electrical
D Elecrical M Coal Handling S Water Structures and Supply
G General MF T Civil
H Chemical N VAC Y
Design Stage
C Basic Design

S Detail Design
Document Status Document Types
RE For CEB's reference CAL Calculation Sheet
AP For CEB's approval DD Design Data
FC For construction / implementation FLD Flow Diagram
GA General Arrangement
Approval Status H&S Hangers & Supports
A Approved INST Installation Dwg
B Approved with comments ISO Isometric Dwg
C Disapproved MAT Material List
D Rejected

IMPORTANT
1) Documents designated as RE (AFTER CEB's review) may be issued to site directly - however, they need to be stamped for construction
2) Documents designated as AP (AFTER CEB's review) are to be approved by CEB, resubmitted by CMEC as FC and approved as such by CEB again to beco
3) RE documents are basically given to site after CEB's review (site copies). Works covered under such RE documents are basically eligible to be implemented
4) Site copies are basically to be filed by and kept with the Site Document Controller. Contact him if you need site copies for the purpose of inspections / notes
5) IN / OUT of site copies will be recorded along with a signature by the site document controller
6) Documents available in the site office filing system are marked with "X" in the related column "Submitted to Site Office"
7) When you plan to use site copies on site then always check the relevant Comment Sheets and check actual document status and open issues before you a
8) Use the site copies to red-mark design changes and modifications agreed on site as the same site copies shall then be the basis to review the As-Built docu

FOR QUESTIONS AND FURTHER SUGGESTIONS ON THE DESIGN OF THE LIST PLEASE CONTACT SITE DOCUMENT CONTROLLER
Z Layout
PP Engineering Documents are basically "Eligible for Construction"
if they have been submitted to site office. ==> "x" in column
"submitted to site". All site copies were submitted to site by mid April
2013 upon CEB's request.

TL&SS site copies are directly handed over to Mr. Piyadasa ==>
"PIY" in column "submitted to site"

Author
PID P&ID B4851 TL / SS
SDD System Design Description CMEC Port Facilities
PD Piping Diagram F5222S Power Plant
ERE Erection Dwg T065S FGD
(further proposal to BGM) CMEC-II Suppliers / Manufacturers

or construction
oved as such by CEB again to become eligible for implementation on site
basically eligible to be implemented on site, however, the related AP documents MUST HAVE BEEN approved FC by CEB first.
the purpose of inspections / notes / comments / walk downs etc. Do not keep the documents too long without reason.

atus and open issues before you accept any works done by CMEC
he basis to review the As-Built documents later

NT CONTROLLER
r Construction"
column
site by mid April

yadasa ==>