PHILIPPINE ECONOMIC ZONE AUTHORITY


OFFICE OF THE BUILDING OFFICIAL (OBO)

CERTIFICATE OF ELECTRICAL INSPECTION (CEI) REQUIREMENTS


CEI Application: Temporary Permanent

Project Title:

1. One (1) set of Electrical As-Built Plans (A3 size), original signed and sealed by a Professional
Electrical Engineer (PEE), with emphasis on the following:
a.) Single Line Diagram;
b.) Load Schedule;
c.) Service Entrance/Concrete Pedestal Detail;
d.) Grounding System Layout;
e.) Distribution Line Layout;
f .) Transmission Line Layout (required for Developers of special economic zones);
g.) Site Development and Location Plan;

h.) Short Circuit Analysis and Voltage Drop Calculation (these could also be presented in a separate
document);

2.One (1) photocopy of Application documents from an electric utility provider servicing the area;

3. One (1) copy of Test Reports pertaining to the electrical system that will be inspected;
accompanied by Certification of safety, reliability and conformity of electrical installation per PEC
and other related Codes and Standards signed by a qualified electrical practitioner.

4. One (1) copy of approved Electrical Permit and paid Assessment fees (Statement of Account)
pertaining to the project;- this is required for applicants who only submitted a Proof of Filing during
the time of building permit application);

5. One (1) Letter of Application for CEI from owner of applying PEZA-registered enterprise or
authorized representative;
N.B.
- If thru a contractor, provide a letter from locator/owner authorizing the contractor to represent him/her in securing the permits;

-The application letter should be addressed to the Director General (for locators under the Head Office); or to the PEZA Zone Administrator (for locators
under CEZ, MEZ, BCEZ and other ecozones not covered by head office); and

-Attention to: The PEZA BUILDING OFFICIAL.

IMPORTANT REMINDERS:
1. Please bring this accomplished checklist when submitting the above-listed requirements.
2. Incomplete requirements will not be received by this office and would delay the processing of CEI application.
3. All designs and installations should be compliant with the standard requirements/provisions of the latest
edition of the Philippine Electrical Code (P.E.C.).

Date of Filing: Received by:

Designation: