PROJECTED HORIZONTAL BEAM

(COOLING TOWER STRUCTURE)

PROJECTED HORIZONTAL BEAM


(COOLING TOWER STRUCTURE)

WF BEAM 150MM X 150MM X 10MM THICKNESS

C CHANNEL 50MM X 100MM X 6 MM THICKNESS

ANGLE BAR 50MM X


50MM X 6MM THICKNESS
4590
PUSH BEAM TROLLEY
WITH 3 TON CHAIN 3800
BLOCK
1850 C CHANNEL 50MM X 100MM X 6 MM THICKNESS

MS PLATE 150*150mm
PROJECTED 8mm thickness C CHANNEL 50MM X 100MM X 6 MM THICKNESS
HORIZONTAL BEAM
(COOLING TOWER BOLTED CONNECTION (15mmDIA * 38mm L, HI TENSILE)
STRUCTURE)
2600

MS PLATE 150 X 150 MM X 8MM THICKNESS

PROJECTED HORIZONTAL BEAM


(COOLING TOWER STRUCTURE) REMARKS:
1. ALL SIDES OF THE JOINT PORTION OF THE
WF-BEAM MUST BE FULL WELDED.
2. ALL BOLTED JOINTS MUST BE TORQUED
ACCORDING TO SPECIFICATION.
3. THE PROPOSED MECHANICAL BOOM IS
WELDED TO THE COOLING TOWER STRUCTURE
FOR BETTER STABILITY.\
4. ALL LINES MARKED BY GREEN ARE THE
PROJECTED COOLING TOWER STRUCTURE
COLUMN AND BEAMS.
PROPOSED COOLING TOWER BOOM
INSTALLATION OF NEW COOLING TOWER NO.5 TK - 02 0:000 A1
LIANG CHI INDUSTRY PHILS., INC.
Km. 20 Ortigas Ave Extension, Bo San Isidro, Taytay
Rizal St. Luke's 01- C 1 OF 1
PROPOSED COOLING TOWER BOOM Medical Center
Tel. Nos. 660-0532 / 660-0556 / Telefax: 658-8529;
658-8769 -
FORT BONIFACIO, GLOBAL CITY,
E-mail Add: liangchi@pldtdsl.net / Website:
www.liangchi.com.ph TAGUIG, METRO MANILA,
ERSD DVI DVI 02/27/2023 PHILIPPINES
MILIMETERS