AGENDA RESPONSIBLE
1.0 Quick review of previous Meeting Minutes CCM-029 All
2.0 All Trades: All
2.1 Basement:
Turnover of Genset. ATS testing schedule.
Pending louver window for genset hood.
Power control for room exhaust fans.
AFSS sprinklers complete? Cleaning of AFSS inside genset
room.
Reinstalling FE stair & GI ramp grilles (c/o SPI).
HPSI updates:
o Maintenance room floor
o Sump pit room (under stair)
o Update on application after the flood.
Roll-up door access control status & integration.
Dumbwaiter sump pump status.
Waterproofing………
UPS room aircon. UPS testing & turnover.
Remaining duct for carpark exhaust blower.
Others
2.2 G/F:
Left wing aircon energization. HR FCU/GF.B.2 duct-out.
Relocating 2 power points @ HR. Pending 1 power point @
HR.
Door handles (glass doors); door stops.
Reception table delivery. Tile grouting on lobby
Main door glazing. Handle bar.
Admin doors. Receptionist back wall update.
Emergency & exit sign lamps.
Mini-park & training room ceiling completion.
Employee lounge finishing update.
Male toilet partitions & tile repair. Grab bar for PWD. Janitor
room sink. Toilet taps, clean-outs, mirrors.
Archive rooms exhaust fix.
Security room status (FDAS, CCTV, etc.)
Elevator S/S fittings (follow-thru)
Others
1 | P a g e
2.3 2/F:
Aircon energization status.
Server/IT room turnover (Low-partition completion &
cleaning).
Pantry casework delivery date? Retouching of pantry room.
Delivery of water filter.
Common toilet status.
Glazed door grab bar.
Status of power & data cable drops.
Elevator S/S fittings (follow-thru)
Others
2.4 3/F:
Completion on 15 Dec.
2.5 Roofdeck:
Status of open deck extension.
Completion of utility room (PP-AC, fire-valve)
Ladder rungs for dumbwaiter machine room & ACCU deck.
Alum enclosure (pipe chase) for copper riser.
Target finish of common toilets.
Status of roof. Status of coping.
Status of timer switch for signage.
Door of dumbwaiter machine room.
Waterproofing……..
Others
2.6 Exterior & finishes:
Entrance canopy finish date?
CFC cladding completion date?
Status of CFC renders. Completion target.
Removal of scaffolds above carpark entrance.
Louver installation on louver tower.
Relocation of trade’s temfacil. Removal of temporary fence.
Boom barriers & integration.
Planters & pavers schedule (and duration).
Others
2.7 And follow-ups on some previous commitments.