Design of Connection :

1. Connection between Beam and Column Post

Available length of welding = 450 mm


Assume Thickness of Welding = 6 mm
Load on beam member = 64.4 kN
Eccentricity from load to extreme fibre = 0m

Vertical shear stress at weld Ps= W/(2*d*t) = 71.56/t

Horizontal shear stress due to bending at extreme fibre


Pb= (6We)/(2*t*d2) = 1192.59/t
Resultant stress at extreme fibre Pr =√( 〖��〗 ^2+ 〖��〗 ^2 )
= 71.56/t
Here permssible Stress =108 mpa
71.56/t=108
t= 0.66 mm
There fore size of weld t/0.7 = 0.94 mm
Adopt thickness of weld = 6 mm

2. Design of Base Plate

Reaction of the column = 64.44 kn


Grade of concrete = 20 Mpa
Area of base plate = 0.03222 m2
Side of a square base 179.4993 mm
Adopt size of base plate = 150 150 mm
Thickness of base plate = 23.4 mm
Adopt thickness of base plate = 24 mm

Anchor Bolt
Upward reaction for load combination DL+Uplift = 64.44 kn
Grade of concrete used for anchorage (fck) = 20 n/mm2
Tensile stress for M20 Concrete Tbd = 1.92 n/mm2
Diameter of anchor bolt used = 10 mm
No of bolt used = 12
We know
Anchorage Strength of Anchor bolt = Tbd* surface area

So,
1.92 * 3.14*10*L>64.44*1000

L> 89.07 mm
Provide anchorage length > 89.07mm

2. Design of Base Plate

Length of Base Plate = 500 mm


Moment M= 103.684 kNm
Vertical Load P = 0.4705035 kN
M/P 220.3682 mm> 83.333333 L/6
x/3=l/2-M/P 29.631798 mm
x= 88.9 mm
σ*x*b/2=P b= 2.6463882 mm
3.22