Contractor’s Representative

Package A

Dear Sir,

SUBJECT: REVISED 15M GIRDER CONCRETE OUTLINE & REINFORCEMENT DETAILS OF BRIDGE AT CH
40+984 TO 40 + 999 KM (REV 01)

Your letter # CEP-2/PK-A/Eng/2009 dated 05th September 2018 that received by us on 07th September
2018 and letter # CEP-2/PK-A/Eng/978 dated 28th December 2017 are referred.

Having reviewed your submission by our structural engineer, Please find duly endorsed drawings for
your necessary action.

As you have not submitted a detail design calculation with this letter, we have reviewed your drawings
by referring to design report submitted by letter # CEP-2/PK-A/Eng/978 dated 28th December 2017 as
informed by your design coordinator.

Please note that review of this submission has expedited not withstanding to submission chronology.

Thank you