You are on page 1of 62

Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86

HD: With HD
CS: Tilted

HS: 22,545.561 m
TM: 22,548.852 m
CH: N/A

Kontrola torkreta_LC
HS: 22,545.561 m
Measurement
Surveyor: Mladen
Measurement date: 7/20/2017 12:32 AM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 68.619 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 4.872 m²
Overprofile Area: 1.465 m²
Meas. Circumference: 31.953 m
Average Deviation: 88.118 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -3.0 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -3.0 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -3.0 %
4-Prim obloga LC 4-Primarna IVb2-LC -3.0 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 1 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,546.758 m
TM: 22,550.049 m
CH: N/A

Kontrola torkreta_LC
HS: 22,546.758 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:48 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 45.791 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 27.391 m²
Overprofile Area: 1.159 m²
Meas. Circumference: 28.165 m
Average Deviation: 94.698 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -3.0 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -3.0 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -3.0 %
4-Prim obloga LC 4-Primarna IVb2-LC -3.0 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 2 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,547.714 m
TM: 22,551.005 m
CH: N/A

Kontrola torkreta_LC
HS: 22,547.714 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:45 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.728 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.449 m²
Overprofile Area: 1.152 m²
Meas. Circumference: 32.241 m
Average Deviation: 76.750 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 3 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,549.113 m
TM: 22,552.405 m
CH: N/A

Kontrola torkreta_LC
HS: 22,549.113 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:44 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.060 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.699 m²
Overprofile Area: 1.734 m²
Meas. Circumference: 32.385 m
Average Deviation: 104.377 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 4 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,550.278 m
TM: 22,553.570 m
CH: N/A

Kontrola torkreta_LC
HS: 22,550.278 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:42 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.965 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.076 m²
Overprofile Area: 2.016 m²
Meas. Circumference: 32.398 m
Average Deviation: 115.214 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 5 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,551.418 m
TM: 22,554.711 m
CH: N/A

Kontrola torkreta_LC
HS: 22,551.418 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:41 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.370 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.743 m²
Overprofile Area: 2.087 m²
Meas. Circumference: 32.350 m
Average Deviation: 122.981 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 6 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,552.788 m
TM: 22,556.081 m
CH: N/A

Kontrola torkreta_LC
HS: 22,552.788 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:40 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.185 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.644 m²
Overprofile Area: 1.803 m²
Meas. Circumference: 32.531 m
Average Deviation: 109.273 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 7 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,553.893 m
TM: 22,557.186 m
CH: N/A

Kontrola torkreta_LC
HS: 22,553.893 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:39 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 69.957 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.024 m²
Overprofile Area: 0.956 m²
Meas. Circumference: 32.237 m
Average Deviation: 72.236 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 8 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,555.123 m
TM: 22,558.417 m
CH: N/A

Kontrola torkreta_LC
HS: 22,555.123 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:38 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.073 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.941 m²
Overprofile Area: 0.989 m²
Meas. Circumference: 32.334 m
Average Deviation: 82.274 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 9 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,555.206 m
TM: 22,558.499 m
CH: N/A

Kontrola torkreta_LC
HS: 22,555.206 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:51 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.404 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.774 m²
Overprofile Area: 1.153 m²
Meas. Circumference: 32.685 m
Average Deviation: 93.095 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 10 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,556.243 m
TM: 22,559.537 m
CH: N/A

Kontrola torkreta_LC
HS: 22,556.243 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:52 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.154 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.126 m²
Overprofile Area: 1.254 m²
Meas. Circumference: 32.460 m
Average Deviation: 84.946 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 11 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,557.120 m
TM: 22,560.414 m
CH: N/A

Kontrola torkreta_LC
HS: 22,557.120 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:37 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 69.350 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.819 m²
Overprofile Area: 1.143 m²
Meas. Circumference: 32.192 m
Average Deviation: 81.751 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.9 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.9 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.9 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.9 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 12 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,558.742 m
TM: 22,562.036 m
CH: N/A

Kontrola torkreta_LC
HS: 22,558.742 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:36 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 69.061 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 4.050 m²
Overprofile Area: 1.085 m²
Meas. Circumference: 32.050 m
Average Deviation: 74.013 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 13 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,560.009 m
TM: 22,563.304 m
CH: N/A

Kontrola torkreta_LC
HS: 22,560.009 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:34 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.148 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.231 m²
Overprofile Area: 1.353 m²
Meas. Circumference: 32.333 m
Average Deviation: 85.049 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 14 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,561.117 m
TM: 22,564.413 m
CH: N/A

Kontrola torkreta_LC
HS: 22,561.117 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:33 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.811 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.180 m²
Overprofile Area: 0.966 m²
Meas. Circumference: 32.375 m
Average Deviation: 65.728 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 15 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,562.261 m
TM: 22,565.556 m
CH: N/A

Kontrola torkreta_LC
HS: 22,562.261 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:32 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 25.558 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 47.360 m²
Overprofile Area: 0.895 m²
Meas. Circumference: 22.933 m
Average Deviation: 74.167 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 16 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,563.502 m
TM: 22,566.798 m
CH: N/A

Kontrola torkreta_LC
HS: 22,563.502 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:32 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 25.190 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 47.792 m²
Overprofile Area: 0.959 m²
Meas. Circumference: 22.894 m
Average Deviation: 84.646 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 17 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,564.720 m
TM: 22,568.017 m
CH: N/A

Kontrola torkreta_LC
HS: 22,564.720 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:30 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.110 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.896 m²
Overprofile Area: 0.981 m²
Meas. Circumference: 32.305 m
Average Deviation: 54.062 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 18 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,565.890 m
TM: 22,569.187 m
CH: N/A

Kontrola torkreta_LC
HS: 22,565.890 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:29 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.683 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.247 m²
Overprofile Area: 0.905 m²
Meas. Circumference: 32.455 m
Average Deviation: 69.738 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 19 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,567.138 m
TM: 22,570.435 m
CH: N/A

Kontrola torkreta_LC
HS: 22,567.138 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:28 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 72.066 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 0.779 m²
Overprofile Area: 0.820 m²
Meas. Circumference: 32.554 m
Average Deviation: 75.526 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.8 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.8 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.8 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.8 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 20 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,568.345 m
TM: 22,571.643 m
CH: N/A

Kontrola torkreta_LC
HS: 22,568.345 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:21 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 72.241 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 0.936 m²
Overprofile Area: 1.152 m²
Meas. Circumference: 32.663 m
Average Deviation: 85.521 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 21 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,569.583 m
TM: 22,572.880 m
CH: N/A

Kontrola torkreta_LC
HS: 22,569.583 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:19 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.230 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.286 m²
Overprofile Area: 0.490 m²
Meas. Circumference: 32.434 m
Average Deviation: 51.076 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 22 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,570.731 m
TM: 22,574.029 m
CH: N/A

Kontrola torkreta_LC
HS: 22,570.731 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:18 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.844 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.619 m²
Overprofile Area: 0.438 m²
Meas. Circumference: 32.310 m
Average Deviation: 43.141 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 23 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,571.991 m
TM: 22,575.289 m
CH: N/A

Kontrola torkreta_LC
HS: 22,571.991 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:16 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 70.314 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.339 m²
Overprofile Area: 0.628 m²
Meas. Circumference: 32.240 m
Average Deviation: 46.645 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 24 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,573.104 m
TM: 22,576.403 m
CH: N/A

Kontrola torkreta_LC
HS: 22,573.104 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:15 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.084 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.176 m²
Overprofile Area: 1.235 m²
Meas. Circumference: 32.340 m
Average Deviation: 76.886 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 25 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,574.442 m
TM: 22,577.742 m
CH: N/A

Kontrola torkreta_LC
HS: 22,574.442 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:13 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.328 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.171 m²
Overprofile Area: 1.474 m²
Meas. Circumference: 32.380 m
Average Deviation: 88.475 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 26 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,575.565 m
TM: 22,578.865 m
CH: N/A

Kontrola torkreta_LC
HS: 22,575.565 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:12 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.219 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.677 m²
Overprofile Area: 1.869 m²
Meas. Circumference: 32.362 m
Average Deviation: 105.861 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 27 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,576.808 m
TM: 22,580.108 m
CH: N/A

Kontrola torkreta_LC
HS: 22,576.808 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:10 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.791 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.412 m²
Overprofile Area: 1.178 m²
Meas. Circumference: 32.400 m
Average Deviation: 67.769 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.7 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.7 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.7 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.7 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 28 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,577.950 m
TM: 22,581.251 m
CH: N/A

Kontrola torkreta_LC
HS: 22,577.950 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:09 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 69.634 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.758 m²
Overprofile Area: 0.366 m²
Meas. Circumference: 32.073 m
Average Deviation: 19.508 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 29 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,579.185 m
TM: 22,582.486 m
CH: N/A

Kontrola torkreta_LC
HS: 22,579.185 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:08 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 45.085 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 27.851 m²
Overprofile Area: 0.912 m²
Meas. Circumference: 28.109 m
Average Deviation: 73.044 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 30 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,580.342 m
TM: 22,583.643 m
CH: N/A

Kontrola torkreta_LC
HS: 22,580.342 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:07 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 45.126 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 28.316 m²
Overprofile Area: 1.418 m²
Meas. Circumference: 28.083 m
Average Deviation: 103.134 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 31 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,581.626 m
TM: 22,584.927 m
CH: N/A

Kontrola torkreta_LC
HS: 22,581.626 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:06 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 46.126 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 27.099 m²
Overprofile Area: 1.200 m²
Meas. Circumference: 28.269 m
Average Deviation: 90.695 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 32 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,582.497 m
TM: 22,585.799 m
CH: N/A

Kontrola torkreta_LC
HS: 22,582.497 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:05 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 72.423 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.065 m²
Overprofile Area: 1.462 m²
Meas. Circumference: 32.617 m
Average Deviation: 90.465 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 33 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,582.761 m
TM: 22,586.064 m
CH: N/A

Kontrola torkreta_LC
HS: 22,582.761 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:04 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 72.059 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.416 m²
Overprofile Area: 1.448 m²
Meas. Circumference: 32.487 m
Average Deviation: 83.661 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 34 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,584.006 m
TM: 22,587.309 m
CH: N/A

Kontrola torkreta_LC
HS: 22,584.006 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:02 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 73.074 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.910 m²
Overprofile Area: 2.958 m²
Meas. Circumference: 32.644 m
Average Deviation: 150.390 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 35 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,585.202 m
TM: 22,588.505 m
CH: N/A

Kontrola torkreta_LC
HS: 22,585.202 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 9:01 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.799 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.882 m²
Overprofile Area: 2.656 m²
Meas. Circumference: 32.514 m
Average Deviation: 141.280 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 36 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,586.345 m
TM: 22,589.648 m
CH: N/A

Kontrola torkreta_LC
HS: 22,586.345 m
Measurement
Surveyor: Nikola Radovanovic
Measurement date: 11/5/2017 8:59 PM
Instrument: ()
Profile: Pun profil Torkret IVb2
Block: N/A
Processing
Measured Area: 71.885 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.355 m²
Overprofile Area: 2.215 m²
Meas. Circumference: 32.581 m
Average Deviation: 121.569 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 37 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,586.455 m
TM: 22,589.759 m
CH: N/A

Kontrola torkreta_LC
HS: 22,586.455 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:00 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 47.890 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 26.038 m²
Overprofile Area: 1.906 m²
Meas. Circumference: 28.594 m
Average Deviation: 138.050 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 38 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,587.485 m
TM: 22,590.788 m
CH: N/A

Kontrola torkreta_LC
HS: 22,587.485 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:00 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 47.862 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 26.125 m²
Overprofile Area: 1.963 m²
Meas. Circumference: 28.565 m
Average Deviation: 136.185 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.6 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.6 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.6 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.6 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 39 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,588.833 m
TM: 22,592.137 m
CH: N/A

Kontrola torkreta_LC
HS: 22,588.833 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:03 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 58.786 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 14.722 m²
Overprofile Area: 1.485 m²
Meas. Circumference: 30.517 m
Average Deviation: 101.534 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 40 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,589.924 m
TM: 22,593.228 m
CH: N/A

Kontrola torkreta_LC
HS: 22,589.924 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:04 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 56.781 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 16.433 m²
Overprofile Area: 1.191 m²
Meas. Circumference: 30.190 m
Average Deviation: 88.749 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 41 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,591.143 m
TM: 22,594.447 m
CH: N/A

Kontrola torkreta_LC
HS: 22,591.143 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:06 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 55.659 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 17.585 m²
Overprofile Area: 1.221 m²
Meas. Circumference: 29.996 m
Average Deviation: 94.959 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 42 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,592.330 m
TM: 22,595.635 m
CH: N/A

Kontrola torkreta_LC
HS: 22,592.330 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:07 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 49.186 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 24.295 m²
Overprofile Area: 1.459 m²
Meas. Circumference: 28.840 m
Average Deviation: 100.357 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 43 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,593.442 m
TM: 22,596.747 m
CH: N/A

Kontrola torkreta_LC
HS: 22,593.442 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:07 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 47.450 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 25.749 m²
Overprofile Area: 1.177 m²
Meas. Circumference: 28.380 m
Average Deviation: 85.942 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 44 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,594.806 m
TM: 22,598.112 m
CH: N/A

Kontrola torkreta_LC
HS: 22,594.806 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:07 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 47.200 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 25.899 m²
Overprofile Area: 1.076 m²
Meas. Circumference: 28.400 m
Average Deviation: 84.491 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 45 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,595.982 m
TM: 22,599.288 m
CH: N/A

Kontrola torkreta_LC
HS: 22,595.982 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:07 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 47.272 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 25.969 m²
Overprofile Area: 1.218 m²
Meas. Circumference: 28.376 m
Average Deviation: 86.400 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 46 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,597.146 m
TM: 22,600.453 m
CH: N/A

Kontrola torkreta_LC
HS: 22,597.146 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:07 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 41.687 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 31.322 m²
Overprofile Area: 0.986 m²
Meas. Circumference: 27.253 m
Average Deviation: 88.118 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 47 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,598.378 m
TM: 22,601.685 m
CH: N/A

Kontrola torkreta_LC
HS: 22,598.378 m
Measurement
Surveyor:
Measurement date: 11/3/2017 6:07 PM
Instrument: ()
Profile: Torkret IVb2
Block: N/A
Processing
Measured Area: 36.293 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 36.692 m²
Overprofile Area: 0.962 m²
Meas. Circumference: 25.992 m
Average Deviation: 84.111 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 48 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,600.110 m
TM: 22,603.417 m
CH: N/A

Kontrola torkreta_LC
HS: 22,600.110 m
Measurement
Surveyor: Aleksandar
Measurement date: 3/24/2017 12:49 AM
Instrument: snimano upravno na profil ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 63.954 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 9.187 m²
Overprofile Area: 1.116 m²
Meas. Circumference: 31.258 m
Average Deviation: 65.020 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 49 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,603.137 m
TM: 22,606.445 m
CH: N/A

Kontrola torkreta_LC
HS: 22,603.137 m
Measurement
Surveyor:
Measurement date: 2/23/2017 3:49 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 67.607 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 4.717 m²
Overprofile Area: 0.298 m²
Meas. Circumference: 31.738 m
Average Deviation: 2.255 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 50 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,604.330 m
TM: 22,607.639 m
CH: N/A

Kontrola torkreta_LC
HS: 22,604.330 m
Measurement
Surveyor:
Measurement date: 2/23/2017 3:53 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 69.914 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.642 m²
Overprofile Area: 0.531 m²
Meas. Circumference: 32.227 m
Average Deviation: 15.054 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 51 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,605.098 m
TM: 22,608.407 m
CH: N/A

Kontrola torkreta_LC
HS: 22,605.098 m
Measurement
Surveyor: Nikola
Measurement date: 1/23/2017 12:12 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 72.848 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 0.166 m²
Overprofile Area: 0.988 m²
Meas. Circumference: 32.608 m
Average Deviation: 48.562 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 52 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,605.545 m
TM: 22,608.854 m
CH: N/A

Kontrola torkreta_LC
HS: 22,605.545 m
Measurement
Surveyor:
Measurement date: 2/23/2017 3:55 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 70.651 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.842 m²
Overprofile Area: 0.467 m²
Meas. Circumference: 32.321 m
Average Deviation: 29.448 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 53 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,606.780 m
TM: 22,610.090 m
CH: N/A

Kontrola torkreta_LC
HS: 22,606.780 m
Measurement
Surveyor:
Measurement date: 2/23/2017 3:57 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 70.277 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.294 m²
Overprofile Area: 0.546 m²
Meas. Circumference: 32.187 m
Average Deviation: 34.930 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 54 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,608.516 m
TM: 22,611.826 m
CH: N/A

Kontrola torkreta_LC
HS: 22,608.516 m
Measurement
Surveyor:
Measurement date: 2/23/2017 3:59 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 71.295 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.375 m²
Overprofile Area: 0.645 m²
Meas. Circumference: 32.418 m
Average Deviation: 39.416 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 55 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,610.350 m
TM: 22,613.661 m
CH: N/A

Kontrola torkreta_LC
HS: 22,610.350 m
Measurement
Surveyor:
Measurement date: 2/23/2017 4:03 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 69.898 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 2.412 m²
Overprofile Area: 0.284 m²
Meas. Circumference: 32.071 m
Average Deviation: 15.051 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 56 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,611.573 m
TM: 22,614.884 m
CH: N/A

Kontrola torkreta_LC
HS: 22,611.573 m
Measurement
Surveyor:
Measurement date: 2/23/2017 4:06 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 71.322 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 1.902 m²
Overprofile Area: 1.199 m²
Meas. Circumference: 32.433 m
Average Deviation: 54.469 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 57 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,613.392 m
TM: 22,616.704 m
CH: N/A

Kontrola torkreta_LC
HS: 22,613.392 m
Measurement
Surveyor:
Measurement date: 2/23/2017 4:08 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 69.907 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.026 m²
Overprofile Area: 0.907 m²
Meas. Circumference: 32.420 m
Average Deviation: 54.267 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 58 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,615.119 m
TM: 22,618.431 m
CH: N/A

Kontrola torkreta_LC
HS: 22,615.119 m
Measurement
Surveyor:
Measurement date: 2/23/2017 4:20 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 69.042 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.923 m²
Overprofile Area: 0.940 m²
Meas. Circumference: 32.209 m
Average Deviation: 52.279 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 59 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,616.311 m
TM: 22,619.623 m
CH: N/A

Kontrola torkreta_LC
HS: 22,616.311 m
Measurement
Surveyor:
Measurement date: 2/23/2017 4:23 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 69.361 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 3.519 m²
Overprofile Area: 0.854 m²
Meas. Circumference: 32.176 m
Average Deviation: 69.722 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 60 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,617.582 m
TM: 22,620.895 m
CH: N/A

Kontrola torkreta_LC
HS: 22,617.582 m
Measurement
Surveyor:
Measurement date: 2/23/2017 4:25 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 66.538 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 5.657 m²
Overprofile Area: 0.170 m²
Meas. Circumference: 31.674 m
Average Deviation: 9.109 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 61 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch
Project: Tuneli AutoPut Site: Tunel Vjeternik Heading: TnVjePr_LC CS: 6-Kon Tork S: 1:86
HD: With HD
CS: Tilted

HS: 22,618.833 m
TM: 22,622.146 m
CH: N/A

Kontrola torkreta_LC
HS: 22,618.833 m
Measurement
Surveyor:
Measurement date: 2/23/2017 4:34 PM
Instrument: ()
Profile: Pun profil torkreta
Block: N/A
Processing
Measured Area: 82.222 m²
Reference Profile Area: 72.026 m²
Underprofile Area: 0.162 m²
Overprofile Area: 10.359 m²
Meas. Circumference: 33.602 m
Average Deviation: 157.102 mm

Design data of construction stages


Reference CS Theoretical profile Trans. slope
6-Kon Tork IV-b2 -2.5 %
Additional CS Theoretical profile Trans. slope
5-Sek oblogaLC 5-sekundarna IVb2-LC -2.5 %
1-Def Iskop LC 1-DefIskop IV-b2 LC -2.5 %
4-Prim obloga LC 4-Primarna IVb2-LC -2.5 %

Remarks

Created with Amberg Tunnel 2.0 version 2.6.0.1 Amberg Technologies AG +41 44 870 92 22 62 / 62
Creation date: 11/6/2017 12:08 PM Trockenloostrasse 21 support.tunnel@amberg.ch
8105 Regensdorf / Switzerland www.ambergtechnologies.ch