SCOPE
This Document Control Procedure covers for Mechanical, Electrical, and Piping
Fabrication & Erection work for Central Java Project at Site.
1.0 All documents affecting quality shall be controlled and maintained. Each
department Manager is authorized to approve documents, or to assign a designate.
2.0 Documents shall be released and controlled by the department having the
responsibility for that document.
3.0 Detailed procedures are available for each department. Procedures shall include
instructions for assuring the correct issue is in use, removal of invalid or obsolete
documents, and identification of any obsolete documents that must be retained for legal
and/or knowledge-preservation purposes.
4.0 Forms used for documenting activities related to this system shall contain an
identification number except for any form developed and purchased prior to the release
of this document and forms generated by the job system computer.
b) Check, verify and issue the drawings and documents to project team and
production department with transmittal.
department and engineer’s concern by email and follow with the transmittal
and hard copy with official “CONTROLLED COPY” with “Received date” and
make sure supervisor at site will receive on time for the immediate
implementation of any changes according the new revision.
g) Document controller fully responsible and follow up each activity as per below
flow chart attachments.
Drawing Control Flow Chart – Any new drawing received stamp and update
on PC (Log Sheet). All the drawing & procedures should be distribute as per
flow chart Attachement-2.
a. The Purchasing Department shall have control over the following documents:
Purchase Orders
Approved Vendors List
a. The Human Resources Department shall have control over the following
Documents:
Document No :
Register status on PC
Scaning
Transmittal and
No comment inform to Documents
Engineers
If any comments
Upload on PDOC
Attachment-2
DRAWING CONTROL FLOW CHART
SC BTG PT.JEL SUB-CNTRACTORS
Document Controller Document Controller (QAQC) Construction Document Controller (QAQC) Construction
Take copy
(A3 size 1 copy)
Take copy
(A3 size 1 copy)
SPECIFICATION C - APPROVAL
INSTRUCTION D - CONSTRUCTION
Drawing No.
Item No. of
or Rev. Title For Remarks
No. Copies
Vendor's Doc. No.
② ①
Date: Date:
RECEIVED BY SC BTG DC PRESENTED BY PT JEL DC
③ ④
Date: Date:
REVIEWED/COMMENTED BY SC BTG RESPONSIBILITY GROUP RECEIVED BY PT JEL DC
DC QOHSER-09
Attachment-4
Date:
Reviewed/Commented by SC BTG Responsibility Group
LOG SHEET LIST DRAWING ATTACHEMENT-5
( √ ) Controlled PT.JEL-INTERNAL-001
INTERNAL TRANSMITTAL ( ) Uncontrolled DATE: 5-Jan-18
DRAWING No. / WBS CODE TRANSMITTAL No. No.of Person to Distribution Return
No. Rev. DESCRIPTION STATUS Register (A3) Signature Signature Remarks
No. FROM SCBTG Sets Receive Date Date
DWG No. 74241-0752 TURBINE BUILDING UNIT-1 / SECTION DETAIL OF 3rd
1 2 FC CJ-SBG-JEL-M-T-00054 1 Controlled copy1-1 Ramalingam
WBS CODE FLOOR (2)
DWG No. 74241-0753 TURBINE BUILDING UNIT-1 / SECTION DETAIL OF 3rd
2 2 FC CJ-SBG-JEL-M-T-00054 1 Controlled copy1-2 Sudharmano
WBS CODE FLOOR (3)
DWG No. 74241-0754 TURBINE BUILDING UNIT-1 / SECTION DETAIL OF 3rd
3 2 FC CJ-SBG-JEL-M-T-00054 1 Controlled copy1-3 Arief
WBS CODE FLOOR (4)
DWG No. 74260-0551 TURBINE BUILDING UNIT-1 / ARRANGEMENT OF STUD
4 3 FC CJ-SBG-JEL-M-T-00054 1 Controlled copy1-4 Kamal
WBS CODE BOLT NO.1
DWG No. 74260-0552 TURBINE BUILDING UNIT-1 / ARRANGEMENT OF STUD
5 3 FC CJ-SBG-JEL-M-T-00054 1 Controlled copy1-5 Suresh
WBS CODE BOLT NO.2
DWG No. 74260-0553 TURBINE BUILDING UNIT-1 / ARRANGEMENT OF STUD
6 3 FC CJ-SBG-JEL-M-T-00054 1 Controlled copy1-6 Berto
WBS CODE BOLT NO.3