2 16 SSE 21 03.01.2019 SSE 22 04.01.19 GM I/c CET SSE Drg - CCTV 4203 R3 CC EnMD , CS SSE 23 04.01.19 GM I/c CET SSE Drg - Water type FE 5107 R4 24 05.01.19 BSBK SSE PCB Project Work Certificate by Hand to Mishra Ji 25 07.01.19 GM I/c CET SSE Drg - 2109R1 4118R2 26 10.01.19 DGM CS TS MZ SSE Bill BSP 30th PP 75,88,610.90 27 10.01.19 project engineer QS SSE Interoffice Memo Bill 30th 28 12.01.19 GM I/c CET SSE QAP of UPS 29 17.01.19 sr executive P& A HSCL MKS attendance Ruchi Dec Jan 30 02.02.19 HSCL to CET MKS Submission of FDA drawings HSCL/BH/Proj/PCB/2019/30 31 05.02.19 HSCL to CET MKS Submission of dry Pressurised system drawings HSCL/BH/Proj/PCB/2019/31 32 07.02.19 DGM CS TS MZ SSE Approval of tiles Kajariya 33 07.02.19 HSCL to CET SSE Drg - 4204,4210, QAP of Handpallet trolley 34 08.02.19 Sr. P & A SSE Sanction memo-Mobile Bill Ruchi 35 12.02.19 HSCL to CET SSE Drg- Road 36 12.02.19 CET SSE Drg 4209 37 12.02.19 DGM CS TS MZ SSE 31st RA Bill- 3,60,375.00 38 14.02.19 DGM CS TS MZ SSE Road Design -BIT 39 14.02.19 HSCL to CET SSE Drawing for Sprinklers 40 14.02.19 DGM CS TS MZ SSE Approval for Toilet Fittings 41 14.02.19 HSCL to CET SSE datesheet of deludge Valve fire Fighting Works 42 15.02.2019 HSCL to CET SSE Drg 5102 R0 43 23-02-19 NOC Letter for UPPSC SS 44 23-02-19 HSCL to CET SSE Drawings Video conferencing System 45 25-02-19 HSCl to CS TS MZ SSE Approval for Sprinkler make 46 25-02-19 HSCL to CS TS MZ SSE Approval for CBR Test 47 25-02-19 HSCl to CET SSE Drawing for Public Address(Wireless) 48 25-02-19 HSCl to CET SSE Drawing for GA BOM CCTV 49 25-02-19 HSCl to CET SSE Drawing for Oil Pits 50 25-02-19 HSCl to CET SSE Comments CET 51 25-02-19 HSCL to CS TS MZ SSE SCheme Jacketing 43-A 23-02-19 HSCL to CS TS MZ SSE Inspection request 52 28-02-19 HSCL to CET DPM ACVS drawing 53 28-02-19 HSCL to CET DPM Dry ventiliation drawing 54 05-03-19 HSCL to CS TS MZ DPM Inspection request EOT Crane 55 06-03-19 HSCL to CET DPM Drawing submission for vendor Approval 56 07-03-19 HSCl to CS TS MZ DPM Vendor approval HPT 57 12-03-19 HSCl to CS TS MZ DPM Drawing submission 58 18-03-19 HSCL to CET DPM QAP for UPS 59 18-03-19 HSCL to CET DPM Road Section & Layout 60 18-03-19 HSCL to CET DPM Make approavl for Sprinklers 61 25-03-19 HSCL to CET DPM Drawings for ACVS 62 25-03-19 HSCL to CET DPM R-1 Deludge Value 63 28-03-19 HSCL to CET DPM Data sheets for Fire Extinguisher 64 28-03-19 HSCL to CET DPM EPABX 65 28-03-19 HSCL to CET DPM Drawing Submission 66 28-03-19 HSCL to Inspection DPM Inspection Call for UPS 67 04-04 HSCL to CET DPM QAP Fire Hydrant Pump 68 04-04 HSCL to CET DPM QAP 69 09-04 HSCL to DGM DPM WBM Design Mix approval 70 09-04 HSCL to CET DPM Resubmission of Drawing for Sprinkler 71 11-04-19 HSCL to CET DPM Submission of Drawing Road 72 15-04-19 HSCL to CET DPM Request for Colur code for Crane 73 20-04-19 HSCL to CET DPM Drawing submission 74 22-04-19 HSCL to CET DPM Drawing submission - Standard Shape of Reinforcement bars 75 24-04-19 HSCL to CET DPM Drawing Resubmission - CCTV 76 24-04-19 HSCL to CET DPM Approval for Painting in Crane and Hoist 77 27-04-19 HSCL to INSPECTION DPM Inspection 78 29-04-19 HSCL to CET DPM Approval for DATA Sheet for Fire Extinguisher 79 29-04-19 HSCL to CET DPM QAP of Fire Hydrant Pump 80 29-04-19 HSCL to CET DPM Supply of 10 T EOT Crane and 3 MT Maintenance Hoist 81 13-05 HSCL to CET DPM Submission of Drawing 82 13-05 HSCL to INSPECTION DPM Supply of Fire Extinguishers 83 15-05-2019 HSCL to CET DPM Submission of Landscaping Drawing 84 15-05-2019 HSCl to CS TS MZ DPM Monitoring Bore Well Report 85 20-05 HSCL to CET DPM Datasheet of CABLES, PCs, LAPTOPS & PRINTER 86 20-05 HSCL to CET DPM Request for Dispatch Clearance 87 20-05 HSCL to CET DPM Submission of Joint Inspection Report 88 20-05 HSCL to CET DPM Submission of Datasheets 89 20-05 HSCL to INSPECTION DPM Inspection for Fire Hydrant Pumps and Motors 90 21-05 91 21-05 HSCL to TK DPM Extendion Of CAR Policy 92 06-06 HSCL to CET DPM EPABX System comments CET 93 06-06 HSCL to CET DPM CCTV revised RG6 Cable 94 06-06 HSCL to CET DPM paver Block party Approval 95 06-06 HSCL to CET DPM Drawing Proces water Layout 96 06-06 HSCl to CS TS MZ DPM EOT 97 11-06 HSCl to CS TS MZ DPM paver Block party Approval 98 17-06 HSCL to CET DPM Supply of EPABX System 99 19-06 HSCl to CS TS MZ DPM Submission of Paver Block 100 20-06-19 HSCL to CET DPM Supply of Fire Extinguisher 101 01-07-19 HSCL to CET DPM Supply of Fire Extinguisher 102 03-07-19 HSCL to CET DPM Pump Foundation 103 06-07-19 HSCL to CET DPM ACVS 104 06-07-19 HSCl to CS TS MZ DPM Dispatch Clearance 105 08-07-19 HSCl to CS TS MZ DPM Dispatch Clearance 106 09-07-19 HSCl to CS TS MZ DPM Gate pass renewal / EOT letter 107 11-07-19 HSCL to CET DPM Approval For Vendor “M/S Safepro Fire Services Pvt Ltd“ For Supply of equipment and accessories related to external firefighting 108 15-07-19 HSCL to CET DPM Submission of Drawing 109 15-07-19 HSCl to CS TS MZ DPM Dispatch Clearance 110 15-07-19 HSCL to CET DPM Drawing Submission 111 22-07-19 HSCL to CET DPM Drawing Submission 112 22-07-19 HSCl to CS TS MZ DPM Approval For Vendor “M/S Newage “ For Supply of equipment and accessories related to external firefighting 113 23-07-19 HSCL to CET DPM Drawing Submission - temporary Waste Storage 114 25-07-19 HSCl to CS TS MZ DPM Approval for Furniture 115 30-07-19 HSCL to CET DPM Submission of Report of monitoring Bore-Well 116 03.08.19 HSCL to CET DPM Submission of Report of monitoring Bore-Well 117 18-08-19 HSCL to CET DPM Submission of Drawings 118 18-08-19 HSCL to CET DPM Approval Of Furniture