Professional Documents
Culture Documents
Al Baddad
S@105-0300 Riyadh Front - Type 1 Cable Option V06
MATCON Quote #18 691
Quote Details
Create Date: Aug 27, 2019 Prepared By: Ahmad El-khatib
Expiry Date: Sept 18, 2019 Phone: 00971043469977
Account Information
Contact Name Ahmad Nabiel Address Dubai National Industries Park, PO
Box 56162
1. Pricing Table
Fabric Ducts
1.1 FabricAir Dispersion System SAR 5,048.83 100 Lot SAR 504,883.00
According to drawing no. 1533123-
100
1.2 FabricAir Dispersion System SAR 4,532.37 100 Lot SAR 453,237.00
According to drawing no. 1533123-
110
P.O Box 59925, Riyadh 11535 (Head Office) | Abu Al Abbas Ibn Abdulmutalib, Ash Shati – Jeddah, KSA
www.matcon-corp.com | info@matcon-corp.com
T: +966 112926363 | F: +966 119211894
Page 2 of 8
By MATCON Corp
SAR 1,045,373.83
SAR 47,041.80
SAR 355,506.30
The material delivery date will be provided upon completion of the order as per notice from our factory in
Denmark.
Installation will be completed 6 to 7 working weeks from compliance to the following steps:
PO submission date
Approval of the shop drawing
Completion of the wired transfer for the down payment
2. Warranty Period
The warranty period for your purchased product applies on both the product and the speci ed design.
The warranty period for your selected product is 5 year(s).
This quote is calculated as per provided civil layout and plans nally submitted before the creation date of
this document. If there are changes in the main civil layout or plans post submitting the quotation from
MATCON, it will be subject to a separate variation / change order for engineering design and drafting.
The client has the right to make minor changes to the nal submitted drawings however, up to four reviews
only. If it is necessary to make more than four reviews; then a separate variation order will have to be
submitted for this review.
MATCON will not be responsible for any work out of the scope mentioned in this quotation.
Any addition over the scope of work mentioned in the quotation subjected to change/ variation order.
P.O Box 59925, Riyadh 11535 (Head Office) | Abu Al Abbas Ibn Abdulmutalib, Ash Shati – Jeddah, KSA
www.matcon-corp.com | info@matcon-corp.com
T: +966 112926363 | F: +966 119211894
Page 3 of 8
By MATCON Corp
Payment terms: 50% down payment, 30% upon delivery at MATCON warehouses and upon noti cation to
the Al Baddad that the order is available for delivery to site and 20% upon completion of installation.
In case the client failed to pay the remaining value after down payment for more than one month the client
will be charged an additional amount of 1% of the project overall value excluding VAT for each 5 business
days. Provided that the client has been noti ed that the purchased items have arrived and ready for
delivery to site.
Any provided time schedule or delivery dates has to take into consideration working days only. Non-
working days are not included in the time schedules mentioned in this offer.
The pricing of this revision cancels / does not include pricing on previous revisions if any.
Any cancellations that take part after the order has been issued are subject to the cancellation terms and
conditions of the order:
1. 30% of Agreement value if canceled 15 days prior to purchase order issue date.
2. 50% of the Agreement value if canceled 21 days thereafter; or
3. 100% of the value of any non-standard items (which are items not built for stock or built to customer
speci cations) or after shipping initiation.
ﯾﺘﻢ ﺣﺴﺎب ﻫﺬه اﻟﺘﺴﻌﯿﺮة ﺑﻨﺎ ًء ﻋﻠﻰ اﻟﻤﺨﻄﻂ اﻟﻤﺪﻧﻲ واﻟﺮﺳﻮﻣﺎت اﻟﻤﻘﺪﻣﺔ أﺧﯿﺮاً ﻣﻦ ﻗﺒﻞ اﻟﻌﻤﯿﻞ ﻗﺒﻞ ﺗﺎرﯾﺦ إﻧﺸﺎء ﻫﺬا اﻟﻤﺴﺘﻨﺪ .أي
ﺗﻐﯿﯿﺮات رﺋﯿﺴﯿﺔ أﺧﺮى ﻓﻲ اﻟﻤﺨﻄﻂ اﻟﻤﺪﻧﻲ أو اﻟﺮﺳﻮﻣﺎت ﺳﯿﺘﻄﻠﺐ إﻋﺎدة ﺗﻘﺪﯾﻢ ﻋﺮض ﺳﻌﺮ ﺟﺪﯾﺪ أو أﻣﺮ ﺗﻐﯿﯿﺮ ﺟﺪﯾﺪ ﻟﻠﺘﺼﻤﯿﻤﺎت و
اﻟﻤﺨﻄﻄﺎت اﻟﺠﺪﯾﺪة.
ﯾﺤﻖ ﻟﻠﻌﻤﯿﻞ إﺟﺮاء ﺑﻌﺾ اﻟﻤﺮاﺟﻌﺎت اﻟﺒﺴﯿﻄﺔ ﻋﻠﻰ اﻟﺮﺳﻮﻣﺎت اﻟﻤﻘﺪﻣﺔ اﻟﻤﺒﻨﯿﺔ ﻋﻠﻰ اﻟﻤﺨﻄﻂ اﻟﻤﻌﻤﺎري اﻟﻤﻘﺪم ﻣﻦ ﻗﺒﻞ اﻟﻌﻤﯿﻞ ﺑﻤﺎ ﻻ
ﯾﺘﺠﺎوز أرﺑﻊ ﻣﺮاﺟﻌﺎت ﻓﻘﻂ .و ﻓﻲ ﺣﺎل زﯾﺎدة ﻋﺪد اﻟﻤﺮاﺟﻌﺎت ﻋﻠﻰ أرﺑﻊ ﻣﺮاﺟﻌﺎت ﺳﯿﺘﻢ اﺣﺘﺴﺎب أﻣﺮ ﺗﻐﯿﯿﺮ ﺟﺪﯾﺪ.
ﻟﻦ ﺗﻜﻮن ﺷﺮﻛﺔ ﻣﺎﺗﻜﻮن ﻣﺴﺆوﻟﺔ ﻋﻦ أي أﻋﻤﺎل ﺗﻨﺪرج ﺧﺎرج ﻧﻄﺎق اﻟﻌﻤﻞ اﻟﻤﺬﻛﻮر ﻓﻲ ﻧﺺ ﻫﺬا اﻟﻌﺮض.
أي إﺿﺎﻓﺔ ﻋﻠﻰ ﻧﻄﺎق اﻟﻌﻤﻞ اﻟﻤﺬﻛﻮرة ﻓﻲ اﻟﻌﺮض ﯾﺘﻢ اﻹﺗﻔﺎق ﻋﻠﯿﻬﺎ ﻻﺣﻘﺎ ﻣﻦ ﺧﻼل ﻃﻠﺐ ﻣﺮاﺟﻌﺔ أو ﻋﺮض ﻣﺴﺘﻘﻞ.
ﺷﺮوط اﻟﺪﻓﻊ ٪50 :دﻓﻌﺔ أوﻟﻰ ٪30 ،ﻋﻨﺪ اﺳﺘﻼم اﻟﻄﻠﺐ ﻓﻲ ﻣﺴﺘﻮدﻋﺎت ﺷﺮﻛﺔ ﻣﺤﻤﺪ ﺗﻮﻓﯿﻖ ﻋﻄﺎري ﻟﻠﻤﻘﺎوﻻت و ﺗﺴﺘﺤﻖ ﻋﻨﺪ
اﺧﻄﺎر اﻟﻌﻤﯿﻞ ﺑﻮﺻﻮل اﻟﻄﻠﺐ اﻟﺨﺎص ﺑﻪ ﻟﻤﺴﺘﻮدﻋﺎت اﻟﺸﺮﻛﺔ و ﻗﺎﺑﻠﯿﺔ ﺗﻮﺻﯿﻠﻪ إﻟﻰ اﻟﻤﻮﻗﻊ ﻣﺒﺎﺷﺮة و ٪20ﻋﻨﺪ اﻹﻧﺘﻬﺎء ﻣﻦ اﻟﺘﺮﻛﯿﺐ.
ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم ﺳﺪاد اﻟﻌﻤﯿﻞ اﻟﻘﯿﻤﺔ اﻟﻤﺘﺒﻘﯿﺔ ﺑﻌﺪ اﻟﺪﻓﻌﺔ اﻷوﻟﻰ ﻷﻛﺜﺮ ﻣﻦ ﺷﻬﺮ واﺣﺪ ،ﺳﯿﺘﻢ ﻓﺮض رﺳﻮم إﺿﺎﻓﯿﺔ ﻋﻠﻰ اﻟﻌﻤﯿﻞ ﺑﻘﯿﻤﺔ ٪1
ﻣﻦ اﻟﻘﯿﻤﺔ اﻹﺟﻤﺎﻟﯿﺔ ﻟﻠﻤﺸﺮوع ﺑﺎﺳﺘﺜﻨﺎء ﺿﺮﯾﺒﺔ اﻟﻘﯿﻤﺔ اﻟﻤﻀﺎﻓﺔ ﻟﻜﻞ 5أﯾﺎم ﻋﻤﻞ .ﺑﺸﺮط أن ﯾﺘﻢ إﺧﻄﺎر اﻟﻌﻤﯿﻞ ﺑﺄن اﻟﻤﻮاد اﻟﻤﺸﺘﺮاة ﻗﺪ
وﺻﻠﺖ ﻟﻤﺴﺘﻮدﻋﺎت ﻣﺎﺗﻜﻮن و ﺟﺎﻫﺰة ﻟﻠﺘﺴﻠﯿﻢ ﻓﻲ اﻟﻤﻮﻗﻊ.
أي ﺟﺪول زﻣﻨﻲ ﻣﻘﺪم أو ﺗﺎرﯾﺦ ﺗﺴﻠﯿﻢ ﻣﻌﺘﻤﺪ ﯾﺠﺐ أن ﯾﺄﺧﺬ ﻓﻲ اﻻﻋﺘﺒﺎر أﯾﺎم اﻟﻌﻤﻞ ﻓﻘﻂ .ﺣﯿﺚ أن ﻫﺬا اﻟﻌﻘﺪﻻ ﯾﺘﻢ ﯾﺘﻀﻤﻦ أﯾﺎم ﻏﯿﺮ أﯾﺎم
اﻟﻌﻤﻞ ﻓﻲ اﻟﺠﺪول اﻟﺰﻣﻨﻲ.
ﺗﺴﻌﯿﺮ ﻫﺬه اﻟﻤﺮاﺟﻌﺔ ﯾﻠﻐﻲ و ﻻ ﯾﺸﻤﻞ اﻟﻤﺮاﺟﻌﺎت ﻋﻠﻰ اﻟﺘﺴﻌﯿﺮات اﻟﺴﺎﺑﻘﺔ إن وﺟﺪت.
إذا ﺗﻢ إﻟﻐﺎء اﻟﻌﺮض اﻟﻤﺬﻛﻮر ﺑﻌﺪ ﺻﺪور أﻣﺮ اﻟﺸﺮاء ،ﻓﺴﯿﺘﻢ ﺗﺤﻤﯿﻞ اﻟﻤﺸﺘﺮي وﻓﻘﺎ ﻟﺸﺮوط وأﺣﻜﺎم اﻹﻟﻐﺎء اﻟﺘﻲ ﺗﺴﺎوي:
30٪ﻣﻦ ﻗﯿﻤﺔ اﻻﺗﻔﺎﻗﯿﺔ إذا ﺗﻢ إﻟﻐﺎء اﻟﻄﻠﺐ ﺑﻌﺪ 15ﯾﻮﻣﺎ ﻣﻦ ﺗﺎرﯾﺦ إﺻﺪار أﻣﺮ اﻟﺸﺮاء. .1
50٪ﻣﻦ ﻗﯿﻤﺔ اﻻﺗﻔﺎق إذا ﺗﻢ اﻹﻟﻐﺎء 21 ﯾﻮﻣﺎ ﺑﻌﺪ إﺻﺪار أﻣﺮ اﻟﺸﺮاء؛ .2
100٪ﻣﻦ ﻗﯿﻤﺔ أي ﺑﻨﻮد ﻏﯿﺮ ﻗﯿﺎﺳﯿﺔ )وﻫﻲ ﺑﻨﻮد ﻣﻌﺘﻤﺪة ﻋﻠﻰ ﻃﻠﺐ ﻣﻦ ﻣﺨﺰون أو ﻣﺒﻨﯿﺔ ﻟﻤﻮاﺻﻔﺎت ﺧﺼﯿﺼﺔ ﻃﺒﻘﺎ ﻟﻄﻠﺐ اﻟﻌﻤﻼء( .3
أو ﺑﻌﺪ ﺑﺪء اﻟﺸﺤﻦ.
P.O Box 59925, Riyadh 11535 (Head Office) | Abu Al Abbas Ibn Abdulmutalib, Ash Shati – Jeddah, KSA
www.matcon-corp.com | info@matcon-corp.com
T: +966 112926363 | F: +966 119211894
Page 4 of 8
By MATCON Corp
Please provide our sales representative with a noti cation upon wired transfer.
For any further payment requested information or con rmation please contact our nance
department on +966112926363 or your assigned sales representative.
5. Attachements
P.O Box 59925, Riyadh 11535 (Head Office) | Abu Al Abbas Ibn Abdulmutalib, Ash Shati – Jeddah, KSA
www.matcon-corp.com | info@matcon-corp.com
T: +966 112926363 | F: +966 119211894
Page 5 of 8
12 11 10 9 8 7 6 5 4 3 2 1
H H
TECHNICAL DATA
Mark text: COMPONENTS
Total Airflow: 16990 m³/h Pstat: 249 Pa. Tag # Fabric Color FlowModel Suspension
Tag # Airflow [m³/h] V in Primary Secondary Primary Placement Secondary Type Strap Length[mm]
m/s Airflow Airflow 100.1 Combi 30 Standard - - - - -
Injected Distributed Eject
100.1-100.6 16990 0 16990 9.4 0 0 100.2 Combi 30 Standard - - - Type 1 30
F F
30000
E E
Zipper out.
ø800
ø800
to be zipped to POS 105
C C
B B
H H
COMPONENTS
TECHNICAL DATA Tag # Fabric Color FlowModel Suspension
Mark text: Primary Placement Secondary Type Strap Length[mm]
Total Airflow: 16990 m³/h Pstat: 249 Pa. 105.1 Combi 20 Standard SonicFlow 4:30 o'clock. FabFlow Type 1 30
SonicFlow 7:30 o'clock.
Tag # Airflow [m³/h] V in Primary Secondary
m/s Airflow Airflow 105.3 Combi 20 Standard SonicFlow 4:30 o'clock. FabFlow Type 1 30
Injected Distributed Eject SonicFlow 7:30 o'clock.
G 105.1, 105.3-105.6 16990 16990 0 9.4 10742 6248 105.4 Combi 20 Standard SonicFlow 4:30 o'clock. FabFlow Type 1 30 G
SonicFlow 7:30 o'clock.
105.5 Combi 20 Standard SonicFlow 4:30 o'clock. FabFlow Type 1 30
SonicFlow 7:30 o'clock.
9 mm sonic holes
105.6 Combi 20 Standard - - FabFlow - -
F F
30000
E E
105.6
ø800
Zipper in. to be
connected to POS 100
D D
105.1 105.3 105.4 105.5
105.1
C C
B B
6. Signatures
Person Signature
Al Baddad Representative
Ahmad Nabiel
P.O Box 59925, Riyadh 11535 (Head Office) | Abu Al Abbas Ibn Abdulmutalib, Ash Shati – Jeddah, KSA
www.matcon-corp.com | info@matcon-corp.com
T: +966 112926363 | F: +966 119211894
Page 8 of 8