Plated Deck - provided with deck bunding such that liquids contained within bund is drained off using

the drain boxes.

Problem: To design drainage from the plated deck such that deluge firewater can be drained without overflowing the side

Deluge Rate = 848 m3/hr

Number of Drain Boxes = 9


Drain Pipe Size = 6 in

Option 1 Froude No. < 0.3

where v = Velocity of liquid, fps


g = Gravitational constant, 32.2 ft/sec²
D = Diameter of pipe, ft.

Allowable velocity in 6" pipe = 0.38 m/s


Allowable flowrate in 6" pipe = 24.90 m3/hr

Total flowrate through existing drain boxes = 224.08 m3/hr

Additional drain boxes required = 26

Option 2 NORSOK P-001


f = 0.026822 where k = 0.05 mm
Q = 490.28 m3/hr
= 7.47 m/s

Total flowrate through existing drain boxes = 4412.53 m3/hr

Additional drain boxes required = 0

Option 3 50% head in drain box

0.5hrg = 0.5rv^2 where


h = height of water in drain box = 300

v = 1.72 m/s
Allowable flowrate in 6" pipe = 112.66 m3/hr

Total flowrate through existing drain boxes = 1013.91 m3/hr

Additional drain boxes required = 0


ff using the drain boxes.

6"
Drain Box with configuration as follows (looking at elevation): 3" 300mm

The 3" pipe is connected to a common header from all of the drain boxes and directed to a slops tank
The 6" pipe is connected to a common header from all of the drain boxes and directed to the Main Deck scuppers.
Outlet of header pipe is not submerged in liquid.

without overflowing the sides of the bund


mm
Main Deck scuppers.