COMPUTER LAYOUT

AREA TELEPHONE CCTV BIOMETRIC LAN WIFI


ADMIN 51 9 1 51 4
CANTEEN 2 3 1 2 -
QC / RESEARCH 53 8 1 53 -
WAREHOUSE 16 21 2 16 -
PENICILLIN
SITE DEVELOPMENT - 26 - - -
NON-PENICILLIN
BOILER
MAINTENANCE RM
STP
RAINWATER COLL.
CISTERN TANK
DETENTION POND
UTILITIES
MRF
POWER HOUSE (CQAP) - - - - -
POWER HOUSE (WH)
POWER HOUSE (UB)
STAFF LOCKER RM
PUMP RM
ENGINEERING OFF.
SECURITY OFF.
PUTER LAYOUT FDAS
I/O ACCESS DOOR SPEAKER SMOKE DET. HEAT DET. HORN STROBE TELEPHONE JACK
11 1 55
- 1 21 11 3 3 2
28 1 114 54 7 3 3
2 181

- - -

3 1

- - 18 17 12 5 -
7 20 4 4
MANUAL PULL STATION

3
3

5
4
THE CATHAY DRUG COMPANY, INC. - YSS LABORATORIES COMPANY, INC.
PROJECT AND CONSTRUCTION MANAGEMENT

CCTV CAMERA DESIGNATION

AREA CCTV NO./NAME TYPE QTY.


1 SITE DEVELOPMENT ME IN BULLET 1
ME OUT BULLET 1
MAIN ENTRANCE PARKING BULLET 1
MAIN ENTRANCE BULLET 1
LAY-BY BULLET 1
SECURITY OFFICE BULLET 1
GATE 1 BULLET 1
GATE 2 BULLET 1
WAREHOUSE REAR BULLET 1
WAREHOUSE LS BULLET 1
PUMP ROOM 1 BULLET 1
WAREHOUSE FRONT BULLET 1
PENICILLIN WEST BULLET 1
WALKWAY 1 BULLET 1
WALKWAY 2 BULLET 1
PENICILLIN EAST BULLET 1
ROAD 4 - 1 BULLET 1
ROAD 4 - 2 BULLET 1
NON-PEN EAST BULLET 1
ADMIN LS BULLET 1
PUMP ROOM 3 BULLET 1
MAINTENANCE FRONT BULLET 1
PERIMETER 1 BULLET 1
PERIMETER 2 BULLET 1
DETENTIONPOND BULLET 1
MOTOR POOL BULLET 1
2 PENICILLIN BUILDING S 01 DOME 1
S 02 DOME 1
S 03 DOME 1
S 04 DOME 1
S 05 DOME 1
S 06 DOME 1
S 07 DOME 1
S 08 DOME 1
S 09 BULLET 1
S 10 BULLET 1

Attachment - PreBidMeeting CCTV


Note: CCTV Cameras will be proposed by the Bidder prior to Owner's Approval.

Prepared by:

Apple S. Anibo
Project QA Engineer

Attachment - PreBidMeeting CCTV


ABORATORIES COMPANY, INC.
TION MANAGEMENT

NATION

LOCATION
Main Entrance
Main Entrance
Main Entrance Parking
Main Entrance Employee
Lay-Bay
Security Office
Warehouse Gate 1
Warehosue Gate 2
Warehouse Rear Side
Warehosue Left Side
Pump Room 1
Warehouse Front
Penicillin West Side
Walkway 1 in between CQA & Pen
Walkway 2 in between CQA & Pen
Penicillin East Side
Road 4
Road 4
non-Pencillin East Side
Admin Left Side
Pump Room 3
Maintenance Office Front
Perimeter at Rear Side
Perimeter at Rear Side near Detention Pond
Detention Pond
Motor Pool Area
Receiving Bay (RM01)
Viewing Corridor - Left (RM20)
Viewing Corridor - Right (RM20)
Emergency Exit beside (CH07)
Lobby (CH01)
Corridor - Left (CH08)
Warehouse Corridor - (WH03)
Canteen Corridor (CT07)
Non-Management Canteen (CT06)
Lab Lobby (QC01)

Attachment - PreBidMeeting CCTV


Approved by:

George A. Salvilla
Plant Manager - YSS

Attachment - PreBidMeeting CCTV


The Cathay Drug Company, Inc. - YSS Laboratories, Inc.
Project and Construction Management

October 08, 2019

TRANSFORTATION ALLOWANCE

Date From To Cost Purpose


CDCI Office Site Naic, Cavite ₱103.00
7-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
14-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
21-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
28-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Arcadis Office ₱120.00
Meeting with
4-Oct-19 Arcadis & HS Pow
Arcadis Office CDCI Office ₱130.00
CDCI Office Site Naic, Cavite ₱103.00
5-Oct-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
7-Oct-19 Meeting at Site
Site Naic, Cavite CDCI Office ₱103.00
Total ₱1,486.00

Prepared by: Approved by:

Gabriel Paolo S. Ambar George A. Salvilla


Project QA Engineer Plant Manager - YSS
nc.

Remarks

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

Taxi, no receipt
With Engr. Anibo

Bus, Tricycle

Bus, Tricycle

anager - YSS
The Cathay Drug Company, Inc. - YSS Laboratories, Inc.
Project and Construction Management

October 08, 2019

FARE REIMBURSEMENT

Date From To Cost Purpose


CDCI Office Site Naic, Cavite ₱103.00
7-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
21-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
5-Oct-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
7-Oct-19 Meeting at Site
Site Naic, Cavite CDCI Office ₱103.00
Total ₱824.00

Prepared by: Approved by:

Apple S. Anibo George A. Salvilla


Project QA Engineer Plant Manager - YSS
nc.

Remarks

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

anager - YSS
THE CATHAY DRUG COMPANY, INC. - YSS LABORATORIES COMP
PROJECT AND CONSTRUCTION MANAGEMENT

CCTV CAMERA DESIGNATION and MOUNTING HEIGHT

AREA CCTV NO./NAME TYPE QTY.


1 SITE DEVELOPMENT ME IN BULLET 1
ME OUT BULLET 1
MAIN ENTRANCE PARKING BULLET 1
MAIN ENTRANCE BULLET 1
LAY-BY BULLET 1
SECURITY OFFICE BULLET 1
GATE 1 BULLET 1
GATE 2 BULLET 1
WAREHOUSE REAR BULLET 1
WAREHOUSE LS BULLET 1
PUMP ROOM 1 BULLET 1
WAREHOUSE FRONT BULLET 1
PENICILLIN WEST BULLET 1
WALKWAY 1 BULLET 1
WALKWAY 2 BULLET 1
PENICILLIN EAST BULLET 1
ROAD 4 - 1 BULLET 1
ROAD 4 - 2 BULLET 1
NON-PEN EAST BULLET 1
ADMIN LS BULLET 1
PUMP ROOM 3 BULLET 1
MAINTENANCE FRONT BULLET 1
PERIMETER 1 BULLET 1
PERIMETER 2 BULLET 1
DETENTIONPOND BULLET 1
MOTOR POOL BULLET 1
2 PENICILLIN BUILDING S 01 DOME 1
S 02 DOME 1
S 03 DOME 1
S 04 BULLET 1
S 05 DOME 1
S 06 DOME 1
S 07 DOME 1
S 08 DOME 1
S 09 DOME 1
S 10 BULLET 1
S-1 (Level 2) BULLET 1
S-2 (Level 2) DOME 1
S-3 (Level 2) BULLET 1
S-1 (Roof Deck) DOME 1
S-2 (Roof Deck) BULLET 1

Note: CCTV Cameras will be proposed by the Bidder prior to Owner's Approval.
Camera pole is provided by the Bidders

Prepared by:

Apple S. Anibo
Project QA Engineer
Y, INC. - YSS LABORATORIES COMPANY, INC.
D CONSTRUCTION MANAGEMENT

GNATION and MOUNTING HEIGHT

LOCATION MOUNTING HEIGHT


Main Entrance 3.5M
Main Entrance 3.5M
Main Entrance Parking 3.5M
Main Entrance Employee 3.5M
Lay-Bay With Pole @ 6M High
Security Office 3.15M
Warehouse Gate 1 With Pole @ 6M High
Warehosue Gate 2 Top of Gate Post @ 3M
Warehouse Rear Side Top of Perimeter Fence @ 3M
Warehosue Left Side At the Watch Tower @ 6M high
Pump Room 1 At the Watch Tower @ 6M high
Warehouse Front At Warehouse 2F Line @ 6.65M
Penicillin West Side At Warehouse 2F Line @ 6.65M
Walkway 1 in between CQA & Pen Back of Penicillin @ 3M
Walkway 2 in between CQA & Pen Back of Penicillin @ 3M
Penicillin East Side 10.75M
Road 4 With Pole @ 6M High
Road 4 With Pole @ 6M High
non-Pencillin East Side With Pole @ 6M High
Admin Left Side 3M High
Pump Room 3 With Pole @ 6M High
Maintenance Office Front With Pole @ 6M High
Perimeter at Rear Side At the Watch Tower @ 6M high
Perimeter at Rear Side near Detention Pond With Pole @ 6M High
Detention Pond At the Watch Tower @ 6M high
Motor Pool Area At the Watch Tower @ 6M high
Receiving Bay (RM01) 3.00M
Viewing Corridor - Left (RM20) 3.00M
Viewing Corridor - Right (RM20) 3.00M
Emergency Exit beside (CH07) 3.00M
Lobby (CH01) 4.00M
Corridor - Left (CH08) 3.00M
Warehouse Corridor - (WH03) 3.00M
Canteen Corridor (CT07) 3.00M
Non-Management Canteen (CT06) 3.00M
Lab Lobby (QC01) 3.00M
Plant Room (Level 2) 3.75M
PW & WFI Loop Distribution Room (PEN205) 3.75M
BMS & EMS ROOM (PEN203) 3.75M
Chiller and Pump Room 3.80M
Parapet Wall 1.20M

Approved by:

George A. Salvilla
Plant Manager - YSS
AREA SPEAKER Amplifier
ADMIN 55 2
CANTEEN 21 2
QC / RESEARCH 105 2
WAREHOUSE 185 2
PENICILLIN
SITE DEVELOPMENT -
NON-PENICILLIN
BOILER
MAINTENANCE RM
STP
RAINWATER COLL.
CISTERN TANK
DETENTION POND
UTILITIES
MRF
POWER HOUSE (CQAP) 18
POWER HOUSE (WH) 7
POWER HOUSE (UB)
STAFF LOCKER RM
PUMP RM
ENGINEERING OFF.
SECURITY OFF.