You are on page 1of 27

~91S _ a , 1

Accomplishing ii VfsKWI

Qatar Rail Company Qatar Rail Company


Suhaim Bin Hamad Street 23 1 • P.O. Box 29988 • Doha • Qatar
Engineer's Office
Suhaim Bin Hamad Street 23 1
Contractor's Representative P.O. Box 29988
Carlo Germani - Project Director Doha
Qatar
AKTOR-L&T-YAPI-STFA-JEC-JV (ALYSJ JV) www.qr.com.qa
Gold Line Project Offices
Tel.: +974 4433 1111
Near Al Waab Petrol Station, Behind Qtel Tower Fax: +974 4433 1110
Al Waab Street
P.O. box 24375, Doha, Qatar

Ref. : M006-QRC-CON-LTR-00381
Date: 04 November 20 18

Contract: RTC/040/2012- Gold Line Underground

Subject: VHTS Coordination Meeting - Unprofessional working


relationship between the Contractor and the VHTS
Subcontractor having detrimental effects on Project Delivery

Reference(s): (1) M006-GDB-MEP-LTR-00195 dated 22 October 2018

Dear Sir,

The Engineer's Assistant (EA) refers to the Contractor's letter in Ref (1) and confirms
that the discussions held on 17 October 2018 and recorded in the minutes of meeting
M006-LBE-MEP-MOM-00273 are accurate and correct and the said minutes of
meeting will not be retracted.

The EA attaches a photo report of each of the items recorded in the minutes of
meeting as evidence that the outstanding works, as reported in the meeting by the
VHTS subcontractor, was accurate and correct. The EA notes with concern that some
of these incomplete works of the Contractor are still outstanding and are delaying the
works of the VHTS subcontractor on site.

Furthermore, it is becoming increasingly apparent to the EA that the Contractor is


failing to proactively manage/coordinate with his VHTS subcontractor in a
constructive and professional manner. The EA refers to the daily coordination
meetings arranged by the EA in which both parties regularly act aggressively and
obstructively towards each other. This aggressive behaviour culminated in a meeting
held on 18 October 2018 in which a representative of the VHTS subcontractor was
manhandled by a senior member of the Contractors staff.

Qatar Rail "J;)l" "-;_;,.:ill ~1 ~ "-Sy:.


Registered Onicc: Doha M006-QRC-CON-LTR-00381 Page I of 2
qr.com.qa
s
o............!9J ! a , i
AccampUshine a Vision

This sort of unprofessional behaviour is not acceptable and will not be tolerated or
allowed to continue as it is leaving many issues unresolved and preventing the works
progressing on site in a timely manner. Of particular note is the Contractor's Senior
Coordinator- VHTS, Mr. Christos Stratoulias, whose behaviour is consistently
obstructive and counterproductive.

The Contractor is reminded that it is the responsibility of his Project Director, as the
Contractor's Representative, to ensure that the Contractor's personnel attends the
meetings arranged by the EA and always behave in a reasonable and professional
manner. The EA trusts that, in the benefit of the project, the Contractor's
Representative will take all necessary action to resolve the above issues with
immediate effect.

Yours faithfully,

Samu~hesney
Engineer's Assistant - Qatar Rail Metro Gold Line Underground

Cc.
Andrew Guy Battershill, Qatar Rail Senior Project Manager
Jacobus Conradie, PMC Delivery Director

Enclosed:
VHTS Coordination Meeting - Action items (25 pages)

Response required on or before:


NIA

KCO

Qatar Rail "J;}l" '\;y.Jl1 -";-':.:J ~ ..!lS~ 0£._r::


Registered Office: Doha M006-QRC-CON-LTR-00381 Page 2 of 2
qr.com.q a
VHTS Coordination Meeting-Action items of ALVSJ-JV

SPC-LOl

Issues:

1. No accesstotheindicator(Besidethe
Elevator machine).
ALYSJ-JV advised that the isolator will be
relocated on 29-0ct-18.
(See item# 29 of M006-LBE-MEP-MOM-
00277).

2. MEP cables inside the shaft with no


dressing.

VHTS Coordination M eeting - Act ion Items of ALYSJ-JV


Page 1 of 25
3. Hole penetration not provided for
signalization.
ALYSJ-JV advised that holes will be
provided on 25-0ct-18.
(See item# 29 of M006-LBE-MEP-MOM-
00277}.

\\0

4. Power supply.
Loos Berge< "" egiS Gold Line Underground
As part of standard safety procedures of LB IJlJ\
ALYSJ-JV. Isolator will only be energized
if KONE personnel are present at site. Minutes of Meeting
(See item# 1 of M006-LBE-MEP-MOM- Contra<t
fnC/040/ZOU/Gdd Lino Uncitrroond
00268). No./Pro;Kt:
-
Rel. No. MOO~LBE-MEP-M0~261
I
Subjtct:
00 • VHTS CoonfNbon lletling
NOTE: KONE will only provide team if -·. . ..,.,,,.....i,
shaft closure is completed and other MetdngDate:
··--~·· ··~-

14-0ct-U I I
Tknt:
14:00-15:00 I
pre-requisite to start SAT is closed by Meetin1 loc.lbon: Al Waab QR{PWC offoce M..tingroom2
- --
ALYSJ-JV. DlstributlOll: As per attend.Jnce sheet
J
# TOPICOF DISCUSSION ACTION
BY
DUE
DATE
I
Aienda:

VlfTS Testing & Commluion•nc Progress

I. As a ;raodard safety procrdurr of A•YSi N kobror., lon<v be rr>rr&Jttd of 1r•o


(ONE penornel are prerot at sne.

-- L

VHTS Coordination M eeting - Action Items of A LYSJ-JV


Page 2 of 25
SPC-L06

Issues:

1. Shaft closure.
ALYSJ-JV advised that shaft closure will
be completed on 31-0ct-18.
(See item# 33 of M006-LBE-MEP-MOM-
00277) .

2. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided on 28-0ct-18 (See item# 33 of
M006-LB E-M EP-M OM-00277).

V HTS Coordination M eeting- Action Items of ALYSJ-JV


Page 3 of 25
3. Scaffoldings.
ALYSJ-JV advised that the scaffoldings
will be removed on 31-0ct-18 (See
item# 33 of M006-LBE-MEP-MOM-
00277).

4. Power supply.
loo« 8trcier ~ egis Gold Line Underground
As part of standard safety procedures of U£RJ\
ALYSJ-JV. Isolator will only be energized
if KONE personnel are present at site. Minutes of Meeting
(See item# 1 of M006-LBE-MEP-MOM-
00268).
ContrKt
No./ProjKt:
IRlC/O
+ {2012/Gold Uno UndttJ'Ollnd

Rd. No. MOOO.LBE·MEP·MO'MJ0268

NOTE: KONE will only provide team if


shaft closure is completed and other
Sub]«t:
- - .
EXT · VHTS Coord11'1i1bon ~
nJ.ff1'1'!ll(J. " ' - - · - - - - ·

pre-requisite to start SAT is closed by MHtlng Datt: 14-0ct-18 ITUn•· I 14:00- 1.S:OO

ALYSJ-JV. Meeting laution: Al Waab QR{PMCoff1u Meetingroom 2

Distrlblltlon: As per attendanco sheet

.. T_O-PIC_O_F_Ol~SCUSSl A~N I ~~
--ON-~----------
Ai ond.:

VllTS Tostlng & Commission'"&Projp'tsS

1. "'a.randard !Hlfety procrdure of~< \'>I N l\ol.11cr"' I onl'f ~ ene<&J!td ~


KONE p.rwrnel are Pftsen'. at Si:e.- - I ""'

VHTS Coordination Meeting- Action Items of ALYSJ-JV


Page 4 of 25
SPC-L07

Issues:

1. No shaft closure.
ALYSJ-JV advised that shaft closure will
be completed on 31-0ct-18.
(See item# 34 of M006-LBE-MEP-MOM-
00277) .

2. No cut-outs.
ALYSJ-JV advised that cut-outs w ill be
provided on 28-0ct-18 (See item# 34 of
M006-LBE-MEP-MOM-00277).

VHTS Coordination M eeting - Action Items of ALYSJ-JV


Page 5 of 25
3. Scaffoldings.
ALYSJ-JV advised that the scaffoldings
will be removed on 31-0ct-18.
(See item# 34 of M006-LBE-MEP-MOM-
00277) .

r
4. Power supply.
As part of standa rd safety procedures of
Loos 8erqe< c; egis Gold Line Underground
UlllJ\
ALYSJ-JV. Isolator will only be energized
if KONE personnel are present at site. Minutes of Meeting
(See item# 1 of M006-LBE-MEP-MOM- Contn<t
00268). No./ProjKt: rRTC/WJ/20U/Gold lino Underround-- - - - - - - - -

R . No. M006-LBE-MEP·MO'M0261

NOTE: KONE will only provide team if EXT· VHTS c-.liMbon 111et11ng
SIJbjtct:
shaft closure is completed and other - ,, ~

pre-requisite to start SAT is closed by MffdncDate: 14.0ct-IJ


-- - ITN.•: I 14:00 -15:00
I
ALYSJ-JV. Meeting location: Al W• ab QR/PMC off.:e Meetingroom2
----- I
Distribution: As per attendince sheet
I
TOPIC OF DISCUSSION I ACTION
BY
DUE
DATE
A,enda:

VHTS Testing & Commlssio<"'1C Progress

I. As a >ta'ldard ,.fety procrdure of Ai Y5.l N llOl.lTor., Uonly oe """'i11ed '

l KONE personnel are presen~ at s.ne.

- --

VHTS Coordination Meeting- Action Items of ALYSJ -JV


Page 6 of 25
SPC-lll

Issues:

1. Power supply .
Main power cables not yet terminated
to the isolator.

2. No shaft closure.

VHTS Coordination M eeting- Action Items of ALYSJ-JV


Page 7 of 25
3. Scaffoldings.
ALYSJ-JV advised that the scaffoldings
will be removed on 30-0ct-18.
(See item# 37 of M006-LBE-MEP-MOM-
00277).

4. No cut-outs.
AL YSJ-JV advised that the cut-outs will
be provided on 28-0ct-18.
(See item# 37 of M006-LBE-MEP-MOM-
00277) .

VHTS Coordination M eeting- Action Items of ALYSJ-JV


Page 8 of 25
SPC-L12

Issues :

1. No shaft closure.

2. No cut-outs .

VHTS Coordination M eeting- Action Items of ALYSJ-JV


Page 9 of 25
3. Fire pipe clash with the car sill.

4. Scaffoldings.

VHTS Coordination Meeting- Action Item s of ALYSJ-JV


Pa ge 10 of 25
SPC-Ll S

Issues :

1. No shaft closure.
AL YSJ-JV advised that shaft closure will
be completed on 01-Nov-18.
(See item# 39 of M006-LBE-MEP-MOM-
00277) .

2. No cut-outs .

VHTS Coordination Meeting- Action Ite ms of ALYSJ-JV


Page 11 of 25
3. Power supply.
As pa rt of standard safety procedures of 1..ooi. Seeger ~ egis
Gold Line Underground
Lii ERJ\
ALYSJ-JV. Isolator will only be energized j_

if KONE personnel are present at site. Minutes of Meeting


(See item# 1 of M006-LBE-MEP-MOM-
Controct
00268). RTC/040/'lJJU/Gold Line Underground
,_No./Project:
--
Isolator not yet installed as per last joint Roi. No. MOO&-LBE·MEP-MOM-00268
inspection made on 21-0ct-18 with
EXT - VHTS Coordination ~
KONE, ALYSJ-JV and PMC. Subject:
1.-:-- w~ ... ·'' " 70.T.'l'r!'.r.

(See item# 39 of M006-LBE-MEP-MOM- Me.U.c Date: 14-0d-18 I I


Thn•: 14:01HS:OO
-
00277). Meeting location: Al W•ab QR/PMC olfke Meeting room 2
I
Distribution: A.s pef artencbnce iheet
NOTE: KONE will only provide team if
i TOPICOF DISCUSSION ACTION DUE
shaft closure is completed and other BY DATE
pre-requisite to start SAT is closed by Agenda:
ALYSJ-JV. VHTS Ttstlng& Commissioning Progreu
I

!. Asa <tandard <afetyprO<l!dure of AlYSJ N lsolator.,.111 only be energized if Info

,_ -
KONEpersonnel are present at s.ite.

- l_J

SPC-L03 & SPC-L04

Issues:

1. Sill to sill clearance is affected by Arch


Sub contractor.
In VH TS coordination meetings.
ALYSJ-JV were asked to submit terrazzo
cutting schedule
(See item# 3 of M006-LBE-MEP-MOM-
00274).

VHTS Coordination Meeting- Action Items of ALYSJ-JV


Page 12 of 25
Minutes of Meeting
Contrxt
RTC/040/2012/Gold Lino Und<r&round
No.{Pn>jKt:

Ref.No. MOCJ6.l.BE-MEP-MOM-00274

EXT · VHlS Coonlioltlon llffling

1.MlcMI I ______,
Torno: 14:00-15:00

MtttiJ11 locotlon: Al w..b QR/PMC office

Distribution:

TOPIC OF DISCUSSION ACTION DVE

I BY DAT£

Acenda:

+
l. Des.ten COOfd1f'ltihon meeting to be arranged on 21-0ct-18. Sund1y i t PM( 17-0ct-18
lOOPM In PMC office. Tiws u todanfy correct loation of all utdm~ ms1de
the 'tevatorshtift. PMC to 5end lnmatM:in toAt.YSJ..IV and KONE
• KONE to provide speofic requirements of the code pertaining to I.he
correct tocation and duranc~ of t.1111.Jt ~ inside tht> elevator shaft
2. Thales to ccnttttue installation oi CCTV at1d speaker 1n the ~evator abm at THALES t 18-0ct-18
Al Azlnyah station lnstall.ltion on-gotn.g 8:JOAM
3. Sii dearanc' re-port on JOtnt 1nspectJon
AlYSJ-N W'11t toerdsnitt wrth fit.out contractor to p<OCftd/sun AlVSJ JV TllA
rectifKtition of Tena.no for thost '*";1tOJ units tNt were ident1f~
betow the sd$to sin ckarance of 25rnri accepted by IC:Ot\E.
• At Yst-N to pr0\1de the completlOfl date for cutting of Terr~zzo

2. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided 28-0ct-18.
(See item# 31 & 32 of M006-LBE-MEP-
MOM-00277).

VHTS Coordination Meeting- Action Item s of ALYSJ-JV


Page 13 of 25
Und~
3. Power supply.
As part of standard safety procedures of low Berger egis -Gold Line
UEIJ\
ALYSJ-JV. Isolator will only be energized
if KONE personnel are present at site. Minutes of Meeting
(See item# 1 of M006-LBE-MEP-MOM-
Contract
00268). No./Project:
RTC/040/2012/Gold Line Und•raround

Ref. No. MOOO.LBE·MEP·MOM.00268


NOTE: KONE will only provide team if
EXT· VHTS Coorchnation llffllng
S<Jbjtct:
shaft closure is completed and other
pre-requisite to start SAT is closed by ·~-11 11mt· 14:0CH.S~

ALYSJ-JV. Meetin1 l.o<ilbon: Al Waab ~Pr.IC offKe

Dlstrfbutlon: As per attendance 1he! t

TOPIC OF DISCUSSION ACTION DUE


BY DAT£
A,enda:

I. A> a ;randard wf•ty proctdu" of A,\'SJ N ISOiator ,.,n Ol>l'l be eneqi1td ,• lr'c
KOHEpenonnel are 1•«.ent at lite

4. Shaft closure.

VHTS Coordination M eeting- Action Items of ALYSJ -JV


Page 14 of 25
SPC-L02

Issues:
t.o.,.,, Berger "" egis Gold Line Underground
l.AlllJ\

1. No power supply. Minutes of Meeting


As pa rt of standard safety procedures of
ContrKt
ALYSJ-JV. Isolator will only be energized NoJProjoct:
RTC/040/ZOU/Gold Uno Und•riround
-----;
if KONE personnel are present at site. I
Roi. No. MOOO-LSE·MEP·MOM-00268
(See item# 1 of M006-LBE-MEP-MOM -
00268).
Subjoct:
.,
EXT • VllTS Coordination lloeting
' ,, :mcrar. tt.n,,
Mtt!lng Date: 14-0d·IB
--
I I
limo· 14:00 - 15:00

NOTE: KONE will only provide team if Mttting location: AJ w..b QP./PPICoffic• M..tingroom2
shaft closure is completed and other -- I

pr e-requisite to start SAT is closed by


Distribution: As p!r attendance She!t
!
I TOPIC Of DISCUSSION ACTION I DUE I
ALYSJ-JV. BY DATE
I Agenda:
i
VlfTS Tosdng & C°"""'s.sioll"'I Progress
I
...,.,,.'ldard,..1<typ•ocr0ureor~ ~JV '"""'o'" 'Ol\l"""•'""''•dr
I.
~ONE P"""'"iel are presen'. at site I

.____,

VHTS Coordination M eeting- Action Item s of ALYSJ-JV


Page 15 of 25
2. Landing door entrances not closed.

3. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided 28-0ct-18.
(See item# 30 of M006-LBE-MEP-MOM-
00277).

VHTS Coordination Meeting- Action Items of ALYSJ-JV


Page 16 of 25
SPC-L08 & SPC-L09

Issues:

1. No shaft closure.
ALYSJ-JV advised that shaft closure will be
completed on 01-Nov-18.
(See item# 35 & 36 of M006-LBE-MEP-MOM-
00277).
.:..---~==- - ,....--~=

II .. • '

2. No access to elevator shaft (Gap between


the landing door sill and the floor/ slab).

VHTS Coordination Meeting - Action Items of ALYSJ.JV


Page 17of 2S
3. No slab in front of emergency landing door.
ALYSJ-JV advised that slab will be provided
on 01-Nov-18.
(See item# 35 & 36 of M006-LBE-MEP-MOM-
00277) .

4. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided on 28-0ct-18.
(See item# 35 & 36 of M006-LBE-MEP-MOM-
00277).

VHTS Coordination Meeting - Action Items of ALYSJ-JV


Page 18 of 25
5. Scaffoldings.
ALYSJ-JV advised that scaffoldings will be
removed on 01-0ct-18.
(See item# 35 & 36 of M006-LBE-M EP-MOM-
00277).

6. Isolator location not as per the drawing &


not accessible.

VHTS Coordination Meeting - Action Items of ALYSJ -JV


Page 19 of 25
WAB-LOS

Issues:

1. Indicators cannot be installed because the


cut-outs are small.
ALYSJ-JV advised that IMAR will replace the
glass with correct cut-outs for indicators on
29-0ct-18.
(See item# 7 of M006-LBE-MEP-MOM-
00271).

WAB-L08

Issues:

1. Access to shaft at grade level.

AZl-LlO

Issues:

1. Cut-outs for push buttons.


Glass to be replaced by IMAR. ALYSJ-JVto
check with I MAR regarding the issue as
mentioned on item# 9 of M006-LBE-MEP-
MOM-00268.

VHTS Coordination M eeting - Action Items of ALYSJ-JV


Page 20 of 25
SUD-LOS & SUD-LOG

Issues:

1. Hole penetration for push button cab le not


provided.
AL YSJ-JV advised that holes for push buttons
wi ll be provided on 20-0ct-18.
(See item# 18 & 19 of M006-LBE-MEP-MOM-
00274) .

JOA-L03 & JOA-L04

Issues:

1. No access to install indicators.


AL YSJ-JV were advised to provide access for
the indicator cables in the VHTS coordination
meeting.
(See item# 3 & 4 of M006-LBE-MEP-M OM-
00268) .

JOA-L07

Issues:

1. Thebacksideoftheelevatorshaftis not
closed where scaffo Id ing erected.

VHTS Coordination Meeting- Action Items of ALYSJ-JV


Page 21 of 25
JOA-LlO

Issues:

1. ATS clashing with elevator car.


ALYSJ-JV advised that relocation of ATS will
be completed on 28-0ct-18.
(See item# 12 of M006-LBE-MEP-MOM-
002 77). ATS relocation to

QNM-L02

Issues:

1. Shaft head room should be permanently


closed .

QNM-LOl

Issues:

1. No powersupply.
As part of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM -
00268).

NOTE: KONE will only provide team if shaft


closure is completed and other pre-requisite
to start SAT is closed by AL YSJ-JV.
VHTS Coordination M eeting- Action Items of ALYSJ-JV
Page 22 of 25
QNM-l03 & QNM-L04

Issues:

1. No powersupply.
As part of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).

NOTE: KONE will only provide team if shaft


closure is completed and other pre-requisite
to start SAT is closed by ALYSJ -JV.

QNM-Lll

Issues:

1. No shaft closure- landing door entrances


are not closed.

VHTS Coordination Meeting- Action Items of ALYSJ-JV


Page 23 of 25
QNM-L08

Issues:

1. No shaft closure.
2. Scaffoldings.

QNM-E07 & QNM-E08

Issues:

1. Scaffoldings .

VHTS Coordination Meeting- Action Items of ALYSJ-JV


Page 24 of 25
QNM-A03 & QNM-A04

Issues:

1. No powersupply.
- As part of standard safety procedures of
ALYSJ-JV. Isolator will only be energ ized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).

NOTE: KONE will only provide team if shaft


closure is completed and other pre-requisite
to start SAT is closed by AL YSJ-JV.

QNM-EOS & QNM-EOG

Issues:
1. No powersupply.
- As pa rt of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).

NOTE: KONE will only provide team if shaft


closure is completed and other pre-requisite
to start SAT is closed by ALYSJ-JV.

QNM-LOl & QNM-L02 (EE)

Issues:

2. No powersupply.
- As pa rt of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personne l are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).

NOTE: KONE will only provide team if shaft


closure is completed and other pre-requisite
to start SAT is closed by ALYSJ-JV.

V HTS Coordination Meeting- Action Items of ALYSJ-JV