Professional Documents
Culture Documents
Accomplishing ii VfsKWI
Ref. : M006-QRC-CON-LTR-00381
Date: 04 November 20 18
Dear Sir,
The Engineer's Assistant (EA) refers to the Contractor's letter in Ref (1) and confirms
that the discussions held on 17 October 2018 and recorded in the minutes of meeting
M006-LBE-MEP-MOM-00273 are accurate and correct and the said minutes of
meeting will not be retracted.
The EA attaches a photo report of each of the items recorded in the minutes of
meeting as evidence that the outstanding works, as reported in the meeting by the
VHTS subcontractor, was accurate and correct. The EA notes with concern that some
of these incomplete works of the Contractor are still outstanding and are delaying the
works of the VHTS subcontractor on site.
This sort of unprofessional behaviour is not acceptable and will not be tolerated or
allowed to continue as it is leaving many issues unresolved and preventing the works
progressing on site in a timely manner. Of particular note is the Contractor's Senior
Coordinator- VHTS, Mr. Christos Stratoulias, whose behaviour is consistently
obstructive and counterproductive.
The Contractor is reminded that it is the responsibility of his Project Director, as the
Contractor's Representative, to ensure that the Contractor's personnel attends the
meetings arranged by the EA and always behave in a reasonable and professional
manner. The EA trusts that, in the benefit of the project, the Contractor's
Representative will take all necessary action to resolve the above issues with
immediate effect.
Yours faithfully,
Samu~hesney
Engineer's Assistant - Qatar Rail Metro Gold Line Underground
Cc.
Andrew Guy Battershill, Qatar Rail Senior Project Manager
Jacobus Conradie, PMC Delivery Director
Enclosed:
VHTS Coordination Meeting - Action items (25 pages)
KCO
SPC-LOl
Issues:
1. No accesstotheindicator(Besidethe
Elevator machine).
ALYSJ-JV advised that the isolator will be
relocated on 29-0ct-18.
(See item# 29 of M006-LBE-MEP-MOM-
00277).
\\0
4. Power supply.
Loos Berge< "" egiS Gold Line Underground
As part of standard safety procedures of LB IJlJ\
ALYSJ-JV. Isolator will only be energized
if KONE personnel are present at site. Minutes of Meeting
(See item# 1 of M006-LBE-MEP-MOM- Contra<t
fnC/040/ZOU/Gdd Lino Uncitrroond
00268). No./Pro;Kt:
-
Rel. No. MOO~LBE-MEP-M0~261
I
Subjtct:
00 • VHTS CoonfNbon lletling
NOTE: KONE will only provide team if -·. . ..,.,,,.....i,
shaft closure is completed and other MetdngDate:
··--~·· ··~-
14-0ct-U I I
Tknt:
14:00-15:00 I
pre-requisite to start SAT is closed by Meetin1 loc.lbon: Al Waab QR{PWC offoce M..tingroom2
- --
ALYSJ-JV. DlstributlOll: As per attend.Jnce sheet
J
# TOPICOF DISCUSSION ACTION
BY
DUE
DATE
I
Aienda:
-- L
Issues:
1. Shaft closure.
ALYSJ-JV advised that shaft closure will
be completed on 31-0ct-18.
(See item# 33 of M006-LBE-MEP-MOM-
00277) .
2. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided on 28-0ct-18 (See item# 33 of
M006-LB E-M EP-M OM-00277).
4. Power supply.
loo« 8trcier ~ egis Gold Line Underground
As part of standard safety procedures of U£RJ\
ALYSJ-JV. Isolator will only be energized
if KONE personnel are present at site. Minutes of Meeting
(See item# 1 of M006-LBE-MEP-MOM-
00268).
ContrKt
No./ProjKt:
IRlC/O
+ {2012/Gold Uno UndttJ'Ollnd
pre-requisite to start SAT is closed by MHtlng Datt: 14-0ct-18 ITUn•· I 14:00- 1.S:OO
.. T_O-PIC_O_F_Ol~SCUSSl A~N I ~~
--ON-~----------
Ai ond.:
Issues:
1. No shaft closure.
ALYSJ-JV advised that shaft closure will
be completed on 31-0ct-18.
(See item# 34 of M006-LBE-MEP-MOM-
00277) .
2. No cut-outs.
ALYSJ-JV advised that cut-outs w ill be
provided on 28-0ct-18 (See item# 34 of
M006-LBE-MEP-MOM-00277).
r
4. Power supply.
As part of standa rd safety procedures of
Loos 8erqe< c; egis Gold Line Underground
UlllJ\
ALYSJ-JV. Isolator will only be energized
if KONE personnel are present at site. Minutes of Meeting
(See item# 1 of M006-LBE-MEP-MOM- Contn<t
00268). No./ProjKt: rRTC/WJ/20U/Gold lino Underround-- - - - - - - - -
R . No. M006-LBE-MEP·MO'M0261
NOTE: KONE will only provide team if EXT· VHTS c-.liMbon 111et11ng
SIJbjtct:
shaft closure is completed and other - ,, ~
- --
Issues:
1. Power supply .
Main power cables not yet terminated
to the isolator.
2. No shaft closure.
4. No cut-outs.
AL YSJ-JV advised that the cut-outs will
be provided on 28-0ct-18.
(See item# 37 of M006-LBE-MEP-MOM-
00277) .
Issues :
1. No shaft closure.
2. No cut-outs .
4. Scaffoldings.
Issues :
1. No shaft closure.
AL YSJ-JV advised that shaft closure will
be completed on 01-Nov-18.
(See item# 39 of M006-LBE-MEP-MOM-
00277) .
2. No cut-outs .
,_ -
KONEpersonnel are present at s.ite.
- l_J
Issues:
Ref.No. MOCJ6.l.BE-MEP-MOM-00274
1.MlcMI I ______,
Torno: 14:00-15:00
Distribution:
I BY DAT£
Acenda:
+
l. Des.ten COOfd1f'ltihon meeting to be arranged on 21-0ct-18. Sund1y i t PM( 17-0ct-18
lOOPM In PMC office. Tiws u todanfy correct loation of all utdm~ ms1de
the 'tevatorshtift. PMC to 5end lnmatM:in toAt.YSJ..IV and KONE
• KONE to provide speofic requirements of the code pertaining to I.he
correct tocation and duranc~ of t.1111.Jt ~ inside tht> elevator shaft
2. Thales to ccnttttue installation oi CCTV at1d speaker 1n the ~evator abm at THALES t 18-0ct-18
Al Azlnyah station lnstall.ltion on-gotn.g 8:JOAM
3. Sii dearanc' re-port on JOtnt 1nspectJon
AlYSJ-N W'11t toerdsnitt wrth fit.out contractor to p<OCftd/sun AlVSJ JV TllA
rectifKtition of Tena.no for thost '*";1tOJ units tNt were ident1f~
betow the sd$to sin ckarance of 25rnri accepted by IC:Ot\E.
• At Yst-N to pr0\1de the completlOfl date for cutting of Terr~zzo
2. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided 28-0ct-18.
(See item# 31 & 32 of M006-LBE-MEP-
MOM-00277).
I. A> a ;randard wf•ty proctdu" of A,\'SJ N ISOiator ,.,n Ol>l'l be eneqi1td ,• lr'c
KOHEpenonnel are 1•«.ent at lite
4. Shaft closure.
Issues:
t.o.,.,, Berger "" egis Gold Line Underground
l.AlllJ\
NOTE: KONE will only provide team if Mttting location: AJ w..b QP./PPICoffic• M..tingroom2
shaft closure is completed and other -- I
3. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided 28-0ct-18.
(See item# 30 of M006-LBE-MEP-MOM-
00277).
Issues:
1. No shaft closure.
ALYSJ-JV advised that shaft closure will be
completed on 01-Nov-18.
(See item# 35 & 36 of M006-LBE-MEP-MOM-
00277).
.:..---~==- - ,....--~=
II .. • '
4. No cut-outs.
ALYSJ-JV advised that cut-outs will be
provided on 28-0ct-18.
(See item# 35 & 36 of M006-LBE-MEP-MOM-
00277).
Issues:
WAB-L08
Issues:
AZl-LlO
Issues:
Issues:
Issues:
JOA-L07
Issues:
1. Thebacksideoftheelevatorshaftis not
closed where scaffo Id ing erected.
Issues:
QNM-L02
Issues:
QNM-LOl
Issues:
1. No powersupply.
As part of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM -
00268).
Issues:
1. No powersupply.
As part of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).
QNM-Lll
Issues:
Issues:
1. No shaft closure.
2. Scaffoldings.
Issues:
1. Scaffoldings .
Issues:
1. No powersupply.
- As part of standard safety procedures of
ALYSJ-JV. Isolator will only be energ ized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).
Issues:
1. No powersupply.
- As pa rt of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personnel are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).
Issues:
2. No powersupply.
- As pa rt of standard safety procedures of
ALYSJ-JV. Isolator will only be energized if
KONE personne l are present at site.
(See item# 1 of M006-LBE-MEP-MOM-
00268).