FAUJI CEMENT COMPANY J�IMITED

MOODY �
FaujiTowers, Block-III, 68-Tipu Road, Chaklala, VA' �--:,,
Rawalpindi Can tt, Rawalpindi, PAKISTAN. ,�,
i:\TfR.11.IJIOt\L
CB
001
Tel: 051-9280081-3, Ext-345Dir: 051-9281550

Ref: Purchase/HO/MS/2022/96
M/s AI-Wareed Engineering Pvt Ltd 17-10-2022
38 Km Multan Road, Manga Mandi,
Opp Ali Garh Public School
Lahore, Pakistan.
Ph: 0322-8694201
Work Order

Subject: Kiln Shell Replacement at FCCL Plant


Reference: AWE-FCCL-2022-08-Rev.00

Management of Fauji Cement Company Limited is pleased to award your company the work of
Replacement of Kiln shell, which includes following in scope of work:-
Weight Unit Rate Amount
Sr# Details
(Pl<R) (PKR)
Kiln Shell Replacement (2 Parts) as
1. 40 Tons
per Scope of Work
Total Amount - PKR
Income tax I Included
GST/PRA Exclusive

Terms & Conditions:


1. The Contractor should be mobilized to the site as per requirement of Works technical team.
2. The Contractor shall perform and present the risk assessment before starting any activity.
3. Accommodation will be provided by FCCL.
4. Work completion time of subject services should not exceed from ·1 x month, including pre­
assembly work before plant shut down.
5. The Contractor shall be responsible for food to their labor.
6. The Contractor shall arrange at his own all the machinery/equipment, Required Cranes,
manpower and all other inputs like Roller Supports/ fixtures required for subject job under
the supervision/instructions of FCCL Technical Team.
7. The Contractor shall arrange the required size of cranes with Troller, which should have
testing I inspection cetficate from a reputable firm in the testing / i11spection services.
8. The Contractor shall be responsible of DPT of all welding joint during job as per client
requirement.
9. Hiring of UT Expert of all welding joints lied at the client scope and in case of any flaw
dedection, the retake charges for UT will be back chaged to the contractor.
10. The Contractor will be responsible of Full loss of job if quality standards are not as per
Client/FLS Standards.
11. The Contractor shall submit daily progress report and man power detail to the client.
12. The Contractor shall abide by the instructions given by the technical department where
they deem necessary.
13. The Contractor shall respect/follow all local laws (General Terms and Conditions are
attached at Annexure AA-I) and regulations concerning the management of

'i
contractors/sub-contractors that are more stringent than the FCCL HSE (Health, Safety
and Environment) requirements (Annexure "B").
Sign .Ip