SAUDI ARAMCO ID/PIEU - 30-Nov-2017 - REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.

00 30-Sep-17
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
PORTABLE FIRE PROTECTION EQUIPMENT INSTALLATION SATIP-B-019-01 30-Nov-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

1.1 NONE

2.0 MATERIAL RECEIVING

Material Verification & Inspection


a) Portable Fire Extinguishers
b) Mobile Foam Apparatus
c) Carbon Dioxide Extinguishing
Systems
S. Aramco will inspect the first batch of delivery for
2.1 d) Halon 1301 Fire Extinguishing SAIC-B-2011 SAIC-B-2011 W W
each type of equipment.
Systems
e) Dry Chemical Fire Extinguishing
Systems
f) Fire Hose Including Connections and
Nozzles

2.2 Storage, Handling & Preservation SAIC-B-2012 SAIC-B-2012 S S

3.0 INSTALLATION

3.1 Portable Extinguishers SAIC-B-2013 SAIC-B-2013 W S

3.2 Foam Generating Equipment SAIC-B-2014 SAIC-B-2014 W S

3.3 Special Fixed Extinguishing equipment SAIC-B-2015 SAIC-B-2015 W S

3.4 Structural Welding for supports Refer to SATIP-M-001-04

3.5 Access and Platforms SAIC-B-2016 SAIC-B-2016 W S

3.6 Painting works and Safety color coding Refer to SATIP-H-100-01

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017 - REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.00 30-Sep-17
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
PORTABLE FIRE PROTECTION EQUIPMENT INSTALLATION SATIP-B-019-01 30-Nov-17 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

4.0 PRE-COMMISSIONING

Re-instatement/Final Inspection of
4.1 SAIC-B-2017 SAIC-B-2017 W W USE SATR-A-2011
Portable Fire Protection System

Mech Completion Punch listing


4.2
(Partial or Final MCC)
SATR-A-6133 SATR-A-6133 H Utilize SAIC-B-2017 to accumulate any FEIL items.

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
1 the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017 - REV. 2017.09.00 (Standards Cutoff - September 30, 2017)

Saudi Aramco: Company General Use


Rev. 2017.09.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Nov-2017 - REV. 2017.09.00 (Standards Cutoff - September 30, 2017)

Saudi Aramco: Company General Use


Rev. 2017.09.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use